Scottsdale's ADU policies are restrictive, limiting units to select zones and requiring conditional use permits. The city's focus on preserving residential character makes ADU development more challenging than neighboring Phoenix.
Zoning & Size Requirements
| Allowed Zones | Very limited residential zones |
| Max Size (Detached) | 700 sq ft |
| Max Size (Attached) | Not allowed |
| Max Size (JADU) | Not allowed |
| Max Height | 30 feet |
| Max Units | 1 ADU per lot (if allowed) |
Setback Requirements
| Rear Setback | 25 feet |
| Side Setback | 5 feet |
| Front Setback | 30 feet |
| Parking Required | 2 spaces per lot |
| Owner Occupancy | Often required |
| Min Lot Size | 7,500 sq ft |
Permit Process & Fees
| Approval Process | Conditional use permit + design review |
| Review Timeline | 120-180 days |
| Permit Fees | $5,000-$8,000 |
| Impact Fees | $2,000-$3,000 |
| Plan Check | 6-8 weeks |
| Pre-Approved Plans | Not available |
Get Free ADU Quotes in Scottsdale
Connect with pre-vetted ADU contractors in your area. Free, no obligation.
🔒 Your info is secure. We connect you with up to 3 vetted local contractors. No spam, no obligation.
Construction Costs
| Average Build Cost | $140,000-$280,000 |
| Cost per Sq Ft | $200-$400 |
| Garage Conversion | $75,000-$170,000 |
| Prefab ADU (Installed) | $110,000-$240,000 (installed) |
Finance Your ADU Project
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders in minutes.
Compare ADU Financing Options →Rental Income Potential
| Avg Rent (1 Bedroom) | $1,500-$2,000/mo |
| Avg Rent (2 Bedroom) | $1,900-$2,600/mo |
| Short-Term Rental | Not permitted |
| Est. Annual ROI | 4-6% annual return |
Explore Prefab ADU Options
Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half. Compare top prefab manufacturers.
Compare Prefab ADUs →Recent Law Changes
What's Changed Recently
- 2024: Limited expansion of ADU allowance in select neighborhoods
- 2023: Maintained restrictive approach to preserve neighborhood character
- 2024: Extended design review requirements for ADUs
- 2023: Increased conditional use permit standards
Tips for Building an ADU in Scottsdale
- Scottsdale is challenging for ADU development; verify zone compatibility early
- Conditional use permit and design review require 120+ days
- Owner-occupancy often required; limits pure investment strategies
- High property costs with lower ROI make Scottsdale less attractive for ADUs
Frequently Asked Questions
Can I build an ADU in Scottsdale?
How much does an ADU cost in Scottsdale?
How much can I rent an ADU for in Scottsdale?
Do I need parking for an ADU in Scottsdale?
How long does it take to get an ADU permit in Scottsdale?
Ready to Build in Scottsdale?
Get free, no-obligation quotes from top-rated ADU contractors in Scottsdale.
Get Free Quotes →