Worcester allows ADUs in residential zones with reasonable regulations. The city is moderately ADU-friendly, with straightforward permitting and moderate size limits suitable for most development goals.
Zoning & Size Requirements
| Allowed Zones | Residential zones A and B |
| Max Size (Detached) | 850 sq ft |
| Max Size (Attached) | 750 sq ft |
| Max Size (JADU) | Not allowed |
| Max Height | 30 feet |
| Max Units | 1 ADU per lot |
Setback Requirements
| Rear Setback | 20 feet |
| Side Setback | 5 feet |
| Front Setback | 20 feet |
| Parking Required | 1 space per unit |
| Owner Occupancy | Not required |
| Min Lot Size | 5,000 sq ft |
Permit Process & Fees
| Approval Process | Building permit |
| Review Timeline | 60-80 days |
| Permit Fees | $2,800-$4,500 |
| Impact Fees | $1,000-$1,800 |
| Plan Check | 2-3 weeks |
| Pre-Approved Plans | Not available |
Get Free ADU Quotes in Worcester
Connect with pre-vetted ADU contractors in your area. Free, no obligation.
🔒 Your info is secure. We connect you with up to 3 vetted local contractors. No spam, no obligation.
Construction Costs
| Average Build Cost | $140,000-$280,000 |
| Cost per Sq Ft | $165-$330 |
| Garage Conversion | $70,000-$160,000 |
| Prefab ADU (Installed) | $110,000-$250,000 (installed) |
Finance Your ADU Project
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders in minutes.
Compare ADU Financing Options →Rental Income Potential
| Avg Rent (1 Bedroom) | $1,250-$1,650/mo |
| Avg Rent (2 Bedroom) | $1,550-$2,150/mo |
| Short-Term Rental | Not permitted |
| Est. Annual ROI | 7-10% annual return |
Explore Prefab ADU Options
Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half. Compare top prefab manufacturers.
Compare Prefab ADUs →Recent Law Changes
What's Changed Recently
- 2024: Expanded ADU allowance in residential zones
- 2023: Streamlined permitting timeline
- 2024: Increased max detached ADU size from 750 to 850 sq ft
- 2023: Reduced impact fees for ADU development
Tips for Building an ADU in Worcester
- Worcester's lower property costs vs. Boston/Cambridge create excellent ROI
- Revitalization efforts increasing neighborhood stability and demand
- Good cash flow potential due to cost basis advantages
- Community college and hospital create stable tenant base
Frequently Asked Questions
Can I build an ADU in Worcester?
How much does an ADU cost in Worcester?
How much can I rent an ADU for in Worcester?
Do I need parking for an ADU in Worcester?
How long does it take to get an ADU permit in Worcester?
Ready to Build in Worcester?
Get free, no-obligation quotes from top-rated ADU contractors in Worcester.
Get Free Quotes →