Builder Guide

ADU Builders in San Francisco, CA (2026)

What ADU builders cost in San Francisco, how to choose one, the questions to ask — plus free, no-obligation quotes from independent local contractors (verify license and insurance before hiring).

Build cost: $200,000-$450,000 Permit timeline: 60 days from a COMPLETE application under Gov. Code 66317 — but SF requires every ADU applicant to sign an 'Application Processing Time Tolling Declaration Form' electing either to TOLL (pause) the 60-day clock while revising plans, or to hold the City to it. If the applicant declines tolling, DBI may DENY the application if code compliance cannot be established within 60 days, and revised plans must be resubmitted at least 10 business days before the period ends. Most applicants therefore toll and the real elapsed time exceeds 60 days. Add the Local-Program pre-clock: 15 calendar days of posted notice before filing, a Rent Board declaration with a 30-day tenant petition window (Rent Board targets transmitting a determination within 90 calendar days of a petition), then Planning In-House Review and a Planning Approval Letter — all before the building permit is filed. SF states State-Program full permits 'generally has a shorter review and issuance timeline than the Local program.' Free quotes

An ADU builder in San Francisco is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through San Francisco's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in California.

What ADU Builders Cost in San Francisco [4][5]

Based on our San Francisco cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.

New Detached ADU (all-in)$200,000-$450,000
Cost per Sq Ft$300-$500
Garage Conversion$120,000-$250,000
Prefab / Modular ADU (installed)$150,000-$350,000
City Permit & Plan ReviewReplace the guessed range with SF's own published figures. DBI's own estimate: 'City fees range from 6-9% of construction costs' (and architects/engineers about 10%; at least $125,000 in material and labor for a new unit). PLANNING development application fee (Fee Schedule eff. 8/29/2025, rev. 6/15/2026) — New Construction: $3,502 flat under $100k; $3,504 base + 3.855% of cost above $100,000 in the $100k-499,999 band; $19,226 + 1.230% above $500,000. Alteration/Change of Use (garage or interior conversion): $504 under $10k; $516 + 5.274% above $10,000; $3,838 + 3.524% above $50,000; $5,638 + 3.855% above $100,000. Neighborhood notification $121 + $4.25/envelope; permit-revision back check $366. DBI building permit fees are TWO separate charges under SF Building Code Table 1A-A (amended Ord. 112-26, eff. 7/12/2026) — Plan Review: $1,671 + $15.60 per $1,000 over $50,000 ($50k-200k band), $4,011 + $13.31 per $1,000 over $200,000 ($200k-500k band); Permit Issuance: $677 + $4.83 per $1,000 ($50k-200k), $1,402 + $4.21 per $1,000 ($200k-500k). Table 1A-A note 1 states these exclude Public Works, Planning, Fire, Public Health and plumbing/electrical/mechanical permit fees. Add SFUSD school facility fees (calculated by DBI staff), SFPUC and Public Works right-of-way permits. OUR WORKED EXAMPLE (label as our calculation, not a published number): a $300,000 detached ADU = Planning $11,214 + DBI plan review $5,342 + DBI issuance $1,823, roughly $18,400 before trade permits and school fees — about 6% of construction cost, consistent with DBI's 6-9%. FEE WAIVER: building permit fees are waived for permits granting legal status to dwelling units built without permits, for activities prior to 1/1/2020 (Board Ord. 150571).
Impact FeesMORE GENEROUS THAN STATE LAW — commercially the second-biggest correction. PC 207.2(j) waives impact fees for a State-Program ADU or JADU that is under 750 sq ft of Gross Floor Area, OR that is proposed on a lot with THREE EXISTING UNITS OR FEWER regardless of size. So on a typical SF single-family, duplex or triplex lot, a State-Program ADU pays NO impact fees even at 1,000 sq ft. Above those thresholds, fees are imposed proportionately to the gross floor area of the primary dwelling unit. CAVEAT TO FLAG: the Planning Code says 'Gross Floor Area' for the 750 threshold while Planning Director Bulletin No. 3 says 'interior livable space' — the code controls. SECOND CAVEAT: 207.2(j) is expressly limited to the State Program; PC 207.1 contains no parallel exemption, so Local-Program impact fees are unresolved.

For a full line-item breakdown, see our San Francisco ADU cost guide. To confirm what you're allowed to build before you hire, review the San Francisco ADU rules (max detached size: 850 sq ft gross floor area for a detached ADU with one bedroom or less; 1,000 sq ft for two or more bedrooms. Same cap in BOTH programs (State: PC 207.2(c)(1) and (d)(5)(B); Local: PC 207.1(c)(15)(B)). Exception: a detached ADU on a lot with an existing multifamily building under the State Program has NO maximum size. NOTE: SF measures this as GROSS FLOOR AREA, not interior livable space.; owner-occupancy: Correct for ADUs — neither PC 207.1 nor PC 207.2 imposes owner occupancy, matching Gov. Code 66315. Add the JADU exception SF actually applies: if a JADU SHARES sanitation facilities with the main residence, the owner must record a deed restriction that includes an owner-occupancy requirement in either the JADU or the primary home. A JADU with its own bathroom carries no owner-occupancy requirement.).

Get Free ADU Quotes in San Francisco

Tell us about your project and we'll connect you with ADU builders serving San Francisco. Free, no obligation — you choose who to work with.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 3 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

How to Vet an ADU Builder in San Francisco

  • License: Confirm a current contractor's license in California and that it's in good standing. Ask for the license number and verify it with the state board.
  • ADU-specific experience: Ask how many ADUs they've completed in or near San Francisco and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
  • Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
  • Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
  • Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits (Replace the guessed range with SF's own published figures. DBI's own estimate: 'City fees range from 6-9% of construction costs' (and architects/engineers about 10%; at least $125,000 in material and labor for a new unit). PLANNING development application fee (Fee Schedule eff. 8/29/2025, rev. 6/15/2026) — New Construction: $3,502 flat under $100k; $3,504 base + 3.855% of cost above $100,000 in the $100k-499,999 band; $19,226 + 1.230% above $500,000. Alteration/Change of Use (garage or interior conversion): $504 under $10k; $516 + 5.274% above $10,000; $3,838 + 3.524% above $50,000; $5,638 + 3.855% above $100,000. Neighborhood notification $121 + $4.25/envelope; permit-revision back check $366. DBI building permit fees are TWO separate charges under SF Building Code Table 1A-A (amended Ord. 112-26, eff. 7/12/2026) — Plan Review: $1,671 + $15.60 per $1,000 over $50,000 ($50k-200k band), $4,011 + $13.31 per $1,000 over $200,000 ($200k-500k band); Permit Issuance: $677 + $4.83 per $1,000 ($50k-200k), $1,402 + $4.21 per $1,000 ($200k-500k). Table 1A-A note 1 states these exclude Public Works, Planning, Fire, Public Health and plumbing/electrical/mechanical permit fees. Add SFUSD school facility fees (calculated by DBI staff), SFPUC and Public Works right-of-way permits. OUR WORKED EXAMPLE (label as our calculation, not a published number): a $300,000 detached ADU = Planning $11,214 + DBI plan review $5,342 + DBI issuance $1,823, roughly $18,400 before trade permits and school fees — about 6% of construction cost, consistent with DBI's 6-9%. FEE WAIVER: building permit fees are waived for permits granting legal status to dwelling units built without permits, for activities prior to 1/1/2020 (Board Ord. 150571).), plan check (Expedited plan check available), and impact fees (MORE GENEROUS THAN STATE LAW — commercially the second-biggest correction. PC 207.2(j) waives impact fees for a State-Program ADU or JADU that is under 750 sq ft of Gross Floor Area, OR that is proposed on a lot with THREE EXISTING UNITS OR FEWER regardless of size. So on a typical SF single-family, duplex or triplex lot, a State-Program ADU pays NO impact fees even at 1,000 sq ft. Above those thresholds, fees are imposed proportionately to the gross floor area of the primary dwelling unit. CAVEAT TO FLAG: the Planning Code says 'Gross Floor Area' for the 750 threshold while Planning Director Bulletin No. 3 says 'interior livable space' — the code controls. SECOND CAVEAT: 207.2(j) is expressly limited to the State Program; PC 207.1 contains no parallel exemption, so Local-Program impact fees are unresolved.) are included.
  • Permit handling: Confirm they manage San Francisco's permit process ("TRUE ONLY OF THE STATE PROGRAM — must be split. STATE PROGRAM: ministerial; no CEQA; no Planning Code Sec. 311 neighborhood notification; no discretionary review; no subjective design review except historic-resource standards for ADUs under Gov. Code 66314; appeals prohibited under AB 1114 for permits filed on or after 1/1/2024; eligible for a free virtual Permit Review Roundtable with DBI, Planning, Public Works, SF Fire and SFPUC in one meeting. LOCAL PROGRAM: requires (a) a Notice of Addition of ADU plus declaration posted in the building and mailed/delivered to every unit including unauthorized units at least 15 CALENDAR DAYS before applying; (b) a declaration filed with the Rent Board under penalty of perjury regarding severance of housing services, which tenants may contest by petition within 30 calendar days; (c) a Project Application (PRJ) to Planning for In-House Review and a Planning Approval Letter BEFORE DBI will accept the building permit; (d) possible Historic Resource Review; (e) Zoning Administrator waivers under PC 207.1(g)/307(l); (f) a recorded Regulatory Agreement / Costa-Hawkins agreement where waivers are granted on a lot with Rental Units. BOTH: an ADU Screening Form must be filed with the permit application, on which the applicant elects State/Hybrid or Local and signs a Rent Ordinance affidavit. ELIGIBILITY BAR (Local only): no ADU where there was an owner move-in eviction within 5 years or another no-fault eviction within 10 years.", typically 60 days from a COMPLETE application under Gov. Code 66317 — but SF requires every ADU applicant to sign an 'Application Processing Time Tolling Declaration Form' electing either to TOLL (pause) the 60-day clock while revising plans, or to hold the City to it. If the applicant declines tolling, DBI may DENY the application if code compliance cannot be established within 60 days, and revised plans must be resubmitted at least 10 business days before the period ends. Most applicants therefore toll and the real elapsed time exceeds 60 days. Add the Local-Program pre-clock: 15 calendar days of posted notice before filing, a Rent Board declaration with a 30-day tenant petition window (Rent Board targets transmitting a determination within 90 calendar days of a petition), then Planning In-House Review and a Planning Approval Letter — all before the building permit is filed. SF states State-Program full permits 'generally has a shorter review and issuance timeline than the Local program.') and who is responsible if revisions are required.
  • Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.

Questions to Ask Before You Hire

  • How many ADUs have you built in San Francisco in the last two years?
  • Is your bid fixed-price, and what would trigger a change order?
  • Are permits, plan check, and utility connection fees included?
  • What's a realistic timeline, including permit review (60 days from a COMPLETE application under Gov. Code 66317 — but SF requires every ADU applicant to sign an 'Application Processing Time Tolling Declaration Form' electing either to TOLL (pause) the 60-day clock while revising plans, or to hold the City to it. If the applicant declines tolling, DBI may DENY the application if code compliance cannot be established within 60 days, and revised plans must be resubmitted at least 10 business days before the period ends. Most applicants therefore toll and the real elapsed time exceeds 60 days. Add the Local-Program pre-clock: 15 calendar days of posted notice before filing, a Rent Board declaration with a 30-day tenant petition window (Rent Board targets transmitting a determination within 90 calendar days of a petition), then Planning In-House Review and a Planning Approval Letter — all before the building permit is filed. SF states State-Program full permits 'generally has a shorter review and issuance timeline than the Local program.') and construction?
  • Who is my point of contact and how are delays communicated?
  • What warranty do you provide on workmanship?
  • Can you share three recent California ADU client references?

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Are you an ADU builder? Get San Francisco leads

Homeowners on this page submit real ADU project requests in San Francisco. Each one goes to up to three local builders — that is what the homeowner agrees to — so claiming never takes it from anyone and there is no bidding. A flat $50 only on the leads you accept: no subscription, no contract, and you deal with the homeowner directly.

Get San Francisco ADU Leads →

Frequently Asked Questions

How much do ADU builders charge in San Francisco?

ADU builders in San Francisco typically quote $200,000-$450,000 for a new detached unit, or about $300-$500 per square foot, including design, permitting, and construction. A garage conversion runs $120,000-$250,000 and a prefab/modular ADU averages $150,000-$350,000. Add city permit and plan-review fees (Replace the guessed range with SF's own published figures. DBI's own estimate: 'City fees range from 6-9% of construction costs' (and architects/engineers about 10%; at least $125,000 in material and labor for a new unit). PLANNING development application fee (Fee Schedule eff. 8/29/2025, rev. 6/15/2026) — New Construction: $3,502 flat under $100k; $3,504 base + 3.855% of cost above $100,000 in the $100k-499,999 band; $19,226 + 1.230% above $500,000. Alteration/Change of Use (garage or interior conversion): $504 under $10k; $516 + 5.274% above $10,000; $3,838 + 3.524% above $50,000; $5,638 + 3.855% above $100,000. Neighborhood notification $121 + $4.25/envelope; permit-revision back check $366. DBI building permit fees are TWO separate charges under SF Building Code Table 1A-A (amended Ord. 112-26, eff. 7/12/2026) — Plan Review: $1,671 + $15.60 per $1,000 over $50,000 ($50k-200k band), $4,011 + $13.31 per $1,000 over $200,000 ($200k-500k band); Permit Issuance: $677 + $4.83 per $1,000 ($50k-200k), $1,402 + $4.21 per $1,000 ($200k-500k). Table 1A-A note 1 states these exclude Public Works, Planning, Fire, Public Health and plumbing/electrical/mechanical permit fees. Add SFUSD school facility fees (calculated by DBI staff), SFPUC and Public Works right-of-way permits. OUR WORKED EXAMPLE (label as our calculation, not a published number): a $300,000 detached ADU = Planning $11,214 + DBI plan review $5,342 + DBI issuance $1,823, roughly $18,400 before trade permits and school fees — about 6% of construction cost, consistent with DBI's 6-9%. FEE WAIVER: building permit fees are waived for permits granting legal status to dwelling units built without permits, for activities prior to 1/1/2020 (Board Ord. 150571).) plus impact fees of MORE GENEROUS THAN STATE LAW — commercially the second-biggest correction. PC 207.2(j) waives impact fees for a State-Program ADU or JADU that is under 750 sq ft of Gross Floor Area, OR that is proposed on a lot with THREE EXISTING UNITS OR FEWER regardless of size. So on a typical SF single-family, duplex or triplex lot, a State-Program ADU pays NO impact fees even at 1,000 sq ft. Above those thresholds, fees are imposed proportionately to the gross floor area of the primary dwelling unit. CAVEAT TO FLAG: the Planning Code says 'Gross Floor Area' for the 750 threshold while Planning Director Bulletin No. 3 says 'interior livable space' — the code controls. SECOND CAVEAT: 207.2(j) is expressly limited to the State Program; PC 207.1 contains no parallel exemption, so Local-Program impact fees are unresolved.. Quotes for the same scope commonly vary 20-40% between builders, so collect at least three bids.

How do I find a good ADU builder in San Francisco?

Look for a licensed contractor with completed ADU projects in San Francisco specifically — ADUs involve local zoning, setback rules, and utility connections that general remodelers may not have handled. Verify the license, ask for an ADU-specific portfolio and references, confirm they carry liability and workers' comp insurance, and get a written fixed-price or detailed bid. Submit a request below and we'll forward it to local ADU builders serving San Francisco for free quotes.

Do ADU builders in San Francisco handle permits?

Most full-service ADU builders manage the permit process for you. In San Francisco the approval process is "TRUE ONLY OF THE STATE PROGRAM — must be split. STATE PROGRAM: ministerial; no CEQA; no Planning Code Sec. 311 neighborhood notification; no discretionary review; no subjective design review except historic-resource standards for ADUs under Gov. Code 66314; appeals prohibited under AB 1114 for permits filed on or after 1/1/2024; eligible for a free virtual Permit Review Roundtable with DBI, Planning, Public Works, SF Fire and SFPUC in one meeting. LOCAL PROGRAM: requires (a) a Notice of Addition of ADU plus declaration posted in the building and mailed/delivered to every unit including unauthorized units at least 15 CALENDAR DAYS before applying; (b) a declaration filed with the Rent Board under penalty of perjury regarding severance of housing services, which tenants may contest by petition within 30 calendar days; (c) a Project Application (PRJ) to Planning for In-House Review and a Planning Approval Letter BEFORE DBI will accept the building permit; (d) possible Historic Resource Review; (e) Zoning Administrator waivers under PC 207.1(g)/307(l); (f) a recorded Regulatory Agreement / Costa-Hawkins agreement where waivers are granted on a lot with Rental Units. BOTH: an ADU Screening Form must be filed with the permit application, on which the applicant elects State/Hybrid or Local and signs a Rent Ordinance affidavit. ELIGIBILITY BAR (Local only): no ADU where there was an owner move-in eviction within 5 years or another no-fault eviction within 10 years." with a typical review timeline of 60 days from a COMPLETE application under Gov. Code 66317 — but SF requires every ADU applicant to sign an 'Application Processing Time Tolling Declaration Form' electing either to TOLL (pause) the 60-day clock while revising plans, or to hold the City to it. If the applicant declines tolling, DBI may DENY the application if code compliance cannot be established within 60 days, and revised plans must be resubmitted at least 10 business days before the period ends. Most applicants therefore toll and the real elapsed time exceeds 60 days. Add the Local-Program pre-clock: 15 calendar days of posted notice before filing, a Rent Board declaration with a 30-day tenant petition window (Rent Board targets transmitting a determination within 90 calendar days of a petition), then Planning In-House Review and a Planning Approval Letter — all before the building permit is filed. SF states State-Program full permits 'generally has a shorter review and issuance timeline than the Local program.'. Confirm in writing whether permit fees, plan check (Expedited plan check available), and impact fees are included in the bid or billed separately.

How long does it take to build an ADU in San Francisco?

Plan for the permit review (60 days from a COMPLETE application under Gov. Code 66317 — but SF requires every ADU applicant to sign an 'Application Processing Time Tolling Declaration Form' electing either to TOLL (pause) the 60-day clock while revising plans, or to hold the City to it. If the applicant declines tolling, DBI may DENY the application if code compliance cannot be established within 60 days, and revised plans must be resubmitted at least 10 business days before the period ends. Most applicants therefore toll and the real elapsed time exceeds 60 days. Add the Local-Program pre-clock: 15 calendar days of posted notice before filing, a Rent Board declaration with a 30-day tenant petition window (Rent Board targets transmitting a determination within 90 calendar days of a petition), then Planning In-House Review and a Planning Approval Letter — all before the building permit is filed. SF states State-Program full permits 'generally has a shorter review and issuance timeline than the Local program.' in San Francisco) plus construction. Most detached ADUs take 4-8 months of construction after permits are issued; garage conversions and prefab units are often faster. Ask each builder for a realistic schedule and what could delay it.

Get Free ADU Builder Quotes in San Francisco

Compare bids from experienced local San Francisco ADU builders. Free, no obligation.

Get Free Quotes →

More California ADU Rules

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-08-17. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.