Cambridge vs Somerville: ADU Rules Compared

Side-by-side comparison of ADU zoning rules, costs, and rental potential. Updated 2026.

8/10Cambridge Score
vs 
7/10Somerville Score

Zoning & Size Limits

RequirementCambridge, MASomerville, MA
Allowed ZonesAll residential districts - Cambridge eliminated single-famiBy right in Neighborhood Residence (NR) district as the 'Bac
Max Size (Detached)900 sq ft or 50% of primary dwelling, whichever is less (MA state by-right cap)Local backyard cottage: 576 sq ft max floor plate, max massing 24 ft wide x 32 ft deep; state protected-use ADU: up to 900 sq ft or 50% of principal dwelling GFA, whichever is smaller (reasonable local dimensional standards still apply)
Max Size (Attached)900 sq ft or 50% of primary dwelling, whichever is less (MA state by-right cap)900 sq ft or 50% of principal dwelling gross floor area, whichever is smaller (state cap); internal conversions (basement/attic) follow the same cap
Max HeightNo ADU-specific cap - an ADU may match the principBackyard cottage: 1.5 stories max, ground story he
Parking RequiredNone - Cambridge abolished all parking minimums citywide in None required for the ADU — state law bars parking requireme
Owner OccupancyNot required (prohibited under MA Affordable Homes Act / 760Not allowed — prohibited statewide by the Affordable Homes A

Setback Requirements

SetbackCambridge, MASomerville, MA
Rear Setback5 ft base (ADU setbacks may not be stricter than principal/accessory standards under 760 CMR 71.03)3 ft minimum (3 or 20 ft where lot abuts an alley); 10 ft minimum separation from the principal building
Side Setback5 ft base3 ft minimum
Front Setback10 ft baseBackyard cottages sit behind the principal buildin

Permits & Timeline

DetailCambridge, MASomerville, MA
Permit Timeline60-90 daysBuilding-permit plan review typically 4-8 weeks — Confirm with Inspectional Services (617-625-6600 ext. 5600, isd@somervillema.gov)
Permit Fees$3,500-$5,500Confirm with Inspectional Services — building permit fees are valuation-based; budget several thousand dollars on a typical $300K+ build
Impact Fees$1,500-$2,500None for a single ADU — Confirm with Inspectional Services
Pre-Approved PlansNot availableNone — Somerville does not offer a pre-approved AD

Construction Costs

CostCambridge, MASomerville, MA
Avg Build Cost$210,000-$420,000$275,000-$450,000
Cost Per Sq Ft$220-$440$400-$600
Garage Conversion$105,000-$230,000$150,000-$250,000
Prefab ADU$160,000-$340,000$180,000-$350,000 installed (site work, foundations, and buried utilities extra — confirm with manufacturer)

Rental Income Potential

RentalCambridge, MASomerville, MA
1BR Avg Rent$1,900-$2,500/mo$2,600-$3,000/mo
2BR Avg Rent$2,300-$3,400/mo$3,300-$3,700/mo
Short-Term RentalsNot permittedEffectively no — Somerville's STR ordinance (registration re
Est. ROI5-7% annual return6-9% annual return

Which City Is Better for ADUs?

Cambridge scores 8/10 while Somerville scores 7/10 on our ADU-friendliness index. Cambridge edges ahead overall. Both cities offer viable ADU development opportunities — the best choice depends on your specific property, budget, and goals.

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Get Quotes in Your City

Connect with licensed ADU contractors and get free quotes for your project.

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.