Zoning & Size Limits
| Requirement | Los Angeles, CA | Berkeley, CA |
| Allowed Zones | All residential zones (R1, R2, R3, R4, R5, RD, RW, RE, RS, R | Any lot zoned to allow residential use with an existing or p |
| Max Size (Detached) | 1,200 sq ft | 1,200 sq ft outside the Hillside Overlay; 850 sq ft (studio/1-bedroom) or 1,000 sq ft (2+ bedrooms) within the Hillside Overlay |
| Max Size (Attached) | 1,200 sq ft or 50% of primary dwelling | Same limits as detached (1,200 sq ft outside Hillside Overlay); conversions of existing space have no size cap |
| Max Height | 25 ft (2 stories) for detached; varies for attache | Detached new construction: 25 ft (20 ft within Hil |
| Parking Required | No parking required (eliminated statewide by AB 68) | None required for ADUs or JADUs; displaced garage parking do |
| Owner Occupancy | Not required (CA state law — permanent, no sunset provision) | Not required for ADUs. JADUs with separate sanitation facili |
Setback Requirements
| Setback | Los Angeles, CA | Berkeley, CA |
| Rear Setback | 4 ft for units ≤16 ft height | 4 ft minimum |
| Side Setback | 4 ft for units ≤16 ft height | 4 ft minimum (interior or street side); architectural features may project 2 ft if 2 ft remains to the property line |
| Front Setback | Must meet primary dwelling front setback | ADUs may be placed within the front setback |
Permits & Timeline
| Detail | Los Angeles, CA | Berkeley, CA |
| Permit Timeline | 60-day ministerial review (state-mandated) | 60-day ministerial review; deemed approved if the city fails to act within 60 days (SB 543, eff. Jan 1, 2026) |
| Permit Fees | $4,000-$15,000 depending on size and type (plus 10% General Plan Maintenance Surcharge on permit fees as of June 9, 2026) | $250 zoning plan check + $500 neighbor noticing fee at submittal + $250 address assignment; building permit fees based on project valuation (city fee estimator tool available) |
| Impact Fees | Waived for units under 750 sq ft (state law) | Land Use Planning assesses no impact fees. Berkeley Unified |
| Pre-Approved Plans | Yes — LA has a Standard Plan Program with pre-appr | Yes — the city points applicants to pre-approved A |
Construction Costs
| Cost | Los Angeles, CA | Berkeley, CA |
| Avg Build Cost | $150,000-$350,000 | $250,000-$500,000 |
| Cost Per Sq Ft | $200-$400 | $400-$700 |
| Garage Conversion | $80,000-$180,000 | $120,000-$250,000 |
| Prefab ADU | $100,000-$250,000 | $250,000-$320,000 |
Rental Income Potential
| Rental | Los Angeles, CA | Berkeley, CA |
| 1BR Avg Rent | $1,800-$2,500/mo | $2,300-$2,900/mo |
| 2BR Avg Rent | $2,200-$3,200/mo | $3,000-$3,900/mo |
| Short-Term Rentals | Restricted — STR rules apply; host must be primary resident | No — recorded deed restriction prohibits short-term rental o |
| Est. ROI | 6-10% annual return | 4-7% annual return |
Which City Is Better for ADUs?
Los Angeles scores 9/10 while Berkeley scores 9/10 on our ADU-friendliness index.
Both cities offer viable ADU development opportunities — the best choice depends on your specific property, budget, and goals.
Finance Your ADU Project
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more
Get Quotes in Your City
Connect with licensed ADU contractors and get free quotes for your project.