An ADU builder in San Bernardino is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through San Bernardino's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in California.
What ADU Builders Cost in San Bernardino [12][13][14]
Based on our San Bernardino cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.
| New Detached ADU (all-in) | $150,000-$300,000 |
| Cost per Sq Ft | $180-$280 |
| Garage Conversion | $75,000-$150,000 |
| Prefab / Modular ADU (installed) | $180,000-$320,000 |
| City Permit & Plan Review | The posted Building & Safety fee schedule (07/2020) has no ADU line, so a new detached unit is priced like a new in-fill dwelling: plan review at the hourly rate of $122.37 (5 hours, about $612, for a new dwelling; 3 hours, about $367, for an addition), a building permit of $1,461 for a unit up to 1,200 sq ft (Table 1B, including electrical, plumbing and mechanical inspections) or $1.92 per sq ft for an attached unit with a bath or kitchen ($375 minimum, $1,459 maximum up to 1,200 sq ft), plus a 2% technology fee and 2% General Plan maintenance fee, a $55 zoning consistency review, $167.40 for the certificate of occupancy when it is on the building permit, state SMIP at 0.0001 x valuation and archive fees of $3.15 per plan sheet; expect roughly $2,300-$2,800 in city plan-check and permit fees for a detached ADU before school, sewer and impact fees. The Planning Division's February 2024 schedule lists no ADU review fee; MC-1659 lets the city set an ADU-permit processing fee by council resolution (4.b), so confirm with Planning. Pre-approved plans are bought from their designer at the designer's price |
| Impact Fees | None for a JADU or for an ADU of 750 sq ft or less of interior livable space (Gov. Code 66311.5(c)(1) as amended by SB 543; MC-1659 8.a words the city's version as 'less than 750 sq ft', and the state boundary controls). Above 750 sq ft the fee is prorated: ADU floor area divided by the main house's floor area, times the full single-family fee (8.a.iii). The city's posted Land Development impact-fee schedule (effective February 15, 2022, indexed to the ENR index every July 15, so ask for current figures) totals about $17,300 per detached dwelling: local circulation $232.94, regional circulation $2,435, storm drain $3,925.91, law enforcement $639.07, library $637.89, aquatic $326.11, public meeting facilities $1,089.54 and parkland $8,044.32, so an 800 sq ft ADU behind a 1,600 sq ft house would owe about half of that. School fees are separate: San Bernardino City USD charges $5.38 per sq ft (effective August 3, 2026) on an ADU over 500 sq ft and nothing at 500 sq ft or less (66311.5(c)(3)); Rialto and Redlands USD set their own rates and the city asks for a school-fee letter at 501 sq ft and up. Sewer: SBMWD Rule 25 lists a $180 application fee, a $3,500 residential treatment capacity charge per dwelling unit and $420 per bedroom for collection capacity; a conversion ADU or JADU inside existing space owes no new connection or capacity charge (8.b.ii, 66311.5(d)), and a new detached unit may be charged only in proportion to its burden by floor area or fixture units (8.b.iii, 66311.5(e)). Addresses in the East Valley Water District pay that district instead |
For a full line-item breakdown, see our San Bernardino ADU cost guide. To confirm what you're allowed to build before you hire, review the San Bernardino ADU rules (max detached size: 1,000 sq ft of interior livable space for a unit with two or more bedrooms and 850 sq ft for a studio or one-bedroom under the city's Class 2 standards (19.04.030(2)(P)(7)(a), Ordinance MC-1659); a Class 1 detached ADU under state law is 800 sq ft of livable space or less (5.a.ii). No lot-coverage, FAR, front-setback or open-space rule may force any ADU below 800 sq ft (7.a.iii). Minimum interior width 10 ft in every direction with a 7-ft ceiling (7.h.v); owner-occupancy: Not required for an ADU (19.04.030(2)(P)(6)(g)(i)). A JADU requires an owner (a natural person holding title) to live in the house or the JADU unless the JADU has its own bathroom, or the property is owned by a government agency, land trust or housing organization (6.g.ii, matching AB 1154); a JADU also needs a recorded deed restriction before its certificate of occupancy (6.h). ADUs no longer need a deed restriction under MC-1659).
Get Free ADU Quotes in San Bernardino
Tell us about your project and we'll pass it to ADU builders serving San Bernardino. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.
Takes about a minute.
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
Compare quotes, verify license & insurance, hire (or don't). No spam either way.
🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.
Just browsing? Search ADU builders near you by ZIP code.
How to Vet an ADU Builder in San Bernardino
- License: Confirm a current contractor's license in California and that it's in good standing. Ask for the license number and verify it with the state board.
- ADU-specific experience: Ask how many ADUs they've completed in or near San Bernardino and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
- Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
- Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
- Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits (The posted Building & Safety fee schedule (07/2020) has no ADU line, so a new detached unit is priced like a new in-fill dwelling: plan review at the hourly rate of $122.37 (5 hours, about $612, for a new dwelling; 3 hours, about $367, for an addition), a building permit of $1,461 for a unit up to 1,200 sq ft (Table 1B, including electrical, plumbing and mechanical inspections) or $1.92 per sq ft for an attached unit with a bath or kitchen ($375 minimum, $1,459 maximum up to 1,200 sq ft), plus a 2% technology fee and 2% General Plan maintenance fee, a $55 zoning consistency review, $167.40 for the certificate of occupancy when it is on the building permit, state SMIP at 0.0001 x valuation and archive fees of $3.15 per plan sheet; expect roughly $2,300-$2,800 in city plan-check and permit fees for a detached ADU before school, sewer and impact fees. The Planning Division's February 2024 schedule lists no ADU review fee; MC-1659 lets the city set an ADU-permit processing fee by council resolution (4.b), so confirm with Planning. Pre-approved plans are bought from their designer at the designer's price), plan check (Plan review is paid at submittal at $122.37 per hour (5 hours for a new dwelling, 3 for an addition) and is done in-house; expedited review goes to an outside vendor at the vendor's rate. The city quotes 15-20 business days for the first round and 10-15 for each later round, inside the 60-day statutory decision window. Plans must follow the 2025 California building codes in force since January 1, 2026, and fire sprinklers are required only if the main house has them (19.04.030(2)(P)(6)(c))), and impact fees (None for a JADU or for an ADU of 750 sq ft or less of interior livable space (Gov. Code 66311.5(c)(1) as amended by SB 543; MC-1659 8.a words the city's version as 'less than 750 sq ft', and the state boundary controls). Above 750 sq ft the fee is prorated: ADU floor area divided by the main house's floor area, times the full single-family fee (8.a.iii). The city's posted Land Development impact-fee schedule (effective February 15, 2022, indexed to the ENR index every July 15, so ask for current figures) totals about $17,300 per detached dwelling: local circulation $232.94, regional circulation $2,435, storm drain $3,925.91, law enforcement $639.07, library $637.89, aquatic $326.11, public meeting facilities $1,089.54 and parkland $8,044.32, so an 800 sq ft ADU behind a 1,600 sq ft house would owe about half of that. School fees are separate: San Bernardino City USD charges $5.38 per sq ft (effective August 3, 2026) on an ADU over 500 sq ft and nothing at 500 sq ft or less (66311.5(c)(3)); Rialto and Redlands USD set their own rates and the city asks for a school-fee letter at 501 sq ft and up. Sewer: SBMWD Rule 25 lists a $180 application fee, a $3,500 residential treatment capacity charge per dwelling unit and $420 per bedroom for collection capacity; a conversion ADU or JADU inside existing space owes no new connection or capacity charge (8.b.ii, 66311.5(d)), and a new detached unit may be charged only in proportion to its burden by floor area or fixture units (8.b.iii, 66311.5(e)). Addresses in the East Valley Water District pay that district instead) are included.
- Permit handling: Confirm they manage San Bernardino's permit process ("Ministerial: every ADU and JADU needs an ADU permit and a building permit, approved without a hearing when the plans meet 19.04.030(2)(P) (subsection 4). The city's ADU page lays out the steps: 1) check zoning on the city GIS map and whether the lot is in a high-wind, high-seismic or fire-severity area; 2) submit plans to the Planning Division (909-998-2300, cityofsbplanning@sbcity.org) for planning pre-approval; 3) file at the Building & Safety counter, 201 N. E Street, 3rd floor: three sets of 24 x 36 in. plans with photovoltaic shown (it cannot be deferred), two sets of structural and energy calculations and spec sheets, the building permit application, and the hold-harmless form if you use a pre-approved plan; plan-review fees are paid at submittal and permit fees before issuance; 4) obtain clearances from San Bernardino County Fire (online only), the Water Department for a sewer capacity/will-serve letter (1350 S. E Street, 909-384-5095), the NPDES and Land Development sections of Public Works, and Real Property for the new address, then send them to Community Development or drop them at the counter; 5) plan review, then permit issuance once fees and any school-fee letter are in hand; 6) inspections by phone at 909-998-2000. A denial must list every deficiency and how to fix it, and can be appealed in writing to the Planning Commission, which rules within 60 business days (4.c.iv-v). Owner-builders may pull their own permit with the Owner-Builder Acknowledgment form", typically 15 business days for the city to tell you in writing whether the application is complete (and what is missing), the same 15 business days for each resubmittal, then 60 days from a complete application to approve or deny or the ADU is deemed approved; the clock pauses only if you ask for a delay or the ADU is filed with a new house (19.04.030(2)(P)(4)(c), SB 543). Building & Safety says a first plan-check round takes 15-20 business days and each later round 10-15 business days, with status on the online permit portal) and who is responsible if revisions are required.
- Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.
Questions to Ask Before You Hire
- How many ADUs have you built in San Bernardino in the last two years?
- Is your bid fixed-price, and what would trigger a change order?
- Are permits, plan check, and utility connection fees included?
- What's a realistic timeline, including permit review (15 business days for the city to tell you in writing whether the application is complete (and what is missing), the same 15 business days for each resubmittal, then 60 days from a complete application to approve or deny or the ADU is deemed approved; the clock pauses only if you ask for a delay or the ADU is filed with a new house (19.04.030(2)(P)(4)(c), SB 543). Building & Safety says a first plan-check round takes 15-20 business days and each later round 10-15 business days, with status on the online permit portal) and construction?
- Who is my point of contact and how are delays communicated?
- What warranty do you provide on workmanship?
- Can you share three recent California ADU client references?
Finance Your ADU Project
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more
Are you an ADU builder? Get San Bernardino leads
Homeowners on this page submit real ADU project requests in San Bernardino. Each one goes to up to five local builders — that is what the homeowner agrees to — so claiming never takes it from anyone and there is no bidding. In practice far fewer ever make contact, which is why the number is five rather than three. A flat $50 only on the leads you accept: no subscription, no contract, and you deal with the homeowner directly.
Get San Bernardino ADU Leads →Frequently Asked Questions
How much do ADU builders charge in San Bernardino?
How do I find a good ADU builder in San Bernardino?
Do ADU builders in San Bernardino handle permits?
How long does it take to build an ADU in San Bernardino?
Get Free ADU Builder Quotes in San Bernardino
Compare bids from experienced local San Bernardino ADU builders. Free, no obligation.
Get Free Quotes →