ADU Rules in Chandler, Arizona

Complete guide to building an Accessory Dwelling Unit in Chandler — zoning, setbacks, permits, costs, and more.

Max Size: 75% of the single-family dwelling's gross floor area (interior habitable area) or 1,000 sq ft, whichever is less Setbacks: 5 feet minimum (uninhabitable space attached to an ADU, e.g. a garage, must meet full district setbacks) Parking: 1 Space Verified: 2026-07-20
ADU Score: 6/10
Moderately friendly · how we score

Chandler allows one attached and one detached ADU by right on any lot where a single-family dwelling is the principal use, under Ordinance 5113 (adopted December 9, 2024) implementing Arizona HB 2720. ADUs are capped at 75% of the primary home's gross floor area or 1,000 sq ft, whichever is less, with 5-foot minimum rear/side setbacks. Chandler imposes specific exterior design standards (stucco/EIFS walls and concrete tile roof, or matching the primary residence) and requires shared utility meters.

Zoning & Size Requirements [1][2][3]

Yes — Chandler allows ADUs. A detached ADU can typically be up to 1,000 sq ft under current Arizona and Chandler zoning rules.

See what this means for your lot — get 3 free quotes from Chandler ADU builders →

Allowed ZonesAny lot or parcel where a single-family dwelling is the principal use (Chandler City Code 35-2202.2, residential districts incl. AG-1, SF-D and others amended by Ord. 5113)
Max Size (Detached)75% of the single-family dwelling's gross floor area (interior habitable area) or 1,000 sq ft, whichever is less
Max Size (Attached)75% of the single-family dwelling's gross floor area or 1,000 sq ft, whichever is less
Max Size (JADU)Not a defined category in Chandler; internal ADUs follow standard ADU rules
Max HeightSame as the building height limit of the underlying zoning district
Max Units1 attached + 1 detached per lot; a 3rd detached ADU allowed on lots of 1+ acre if at least one ADU is deed-restricted affordable (80% AMI)

Setback Requirements [1][2][3]

Chandler requires a rear setback of about 5 ft for a detached ADU, and one off-street parking space is required. Owner-occupancy is not required — you can rent it out without living on the property.

Rear Setback5 feet minimum (uninhabitable space attached to an ADU, e.g. a garage, must meet full district setbacks)
Side Setback5 feet minimum
Front SetbackSame as front yard setback of the underlying zoning district
Parking RequiredChandler's code requires 1 additional off-street space per ADU (Ord. 5113, Sec. 35-2202.2(c)); note this appears to conflict with ARS 9-461.18(B)(3), which bars ADU parking mandates - confirm with Chandler Planning
Owner OccupancyNot required
Min Lot SizeNone specified in 35-2202.2; lots with an ADU cannot be split unless each resulting lot meets district minimums

Permit Process & Fees [4][5]

An ADU permit in Chandler typically costs Valuation-based per Chandler fee schedule using ICC Building Valuation Data (minimum permit fee $60); third-party guides estimate roughly 1.5-2% of construction value plus plan review — confirm exact amounts with Chandler Development Services and takes Confirm with Chandler Development Services (480-782-3000), through a standard permit review.

Approval ProcessStandard building permit through Chandler Development Services (ADUs are by right, no use permit); free pre-technical review available before submittal
Review TimelineConfirm with Chandler Development Services (480-782-3000)
Permit FeesValuation-based per Chandler fee schedule using ICC Building Valuation Data (minimum permit fee $60); third-party guides estimate roughly 1.5-2% of construction value plus plan review — confirm exact amounts with Chandler Development Services
Impact FeesConfirm with Chandler Development Services
Plan CheckConfirm with Chandler Development Services
Pre-Approved PlansNo city pre-approved ADU plan program identified as of June 2026 — confirm with Chandler Planning Division

Get Free ADU Quotes in Chandler

Tell us about your project and we'll connect you with ADU builders serving Chandler. Free, no obligation — you choose who to work with.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 3 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add budget & project details (optional — helps builders quote faster)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

Construction Costs [6][7]

Building an ADU in Chandler typically costs $125,000-$250,000 ($140-$280 per sq ft); a garage conversion runs $60,000-$140,000.

See what this means for your lot — get 3 free quotes from Chandler ADU builders →

Average Build Cost$125,000-$250,000
Cost per Sq Ft$140-$280
Garage Conversion$60,000-$140,000
Prefab ADU (Installed)$85,000-$200,000

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Rental Income Potential [8]

A 2-bedroom ADU in Chandler rents for around $1,600-$2,000/mo, an estimated 6-9% annual return.

Avg Rent (1 Bedroom)$1,350-$1,700/mo
Avg Rent (2 Bedroom)$1,600-$2,000/mo
Short-Term RentalNot addressed in ADU section 35-2202.2; Chandler requires short-term rental licensing citywide (City Code Chapter 22) and previously prohibited STR use of ADUs — confirm with Chandler Planning Division
Est. Annual ROI6-9% annual return

Explore Prefab ADU Options

Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Recent Law Changes

What's Changed Recently

  • Chandler Ordinance 5113 (adopted December 9, 2024): added City Code Section 35-2202.2 allowing 1 attached + 1 detached ADU by right on single-family lots, capped at 75% of primary GFA or 1,000 sq ft, with 5-ft rear/side setbacks, shared utility meters, separate-entrance requirement, and exterior design standards (stucco/EIFS + 4:12 concrete tile roof, or matching the primary residence)
  • Arizona HB 2720 (signed May 21, 2024; ARS 9-461.18): mandated these amendments for cities over 75,000 population by January 1, 2025; bars extra parking, owner-occupancy, and design-matching requirements
  • Arizona HB 2928 (signed May 2025): extended similar ADU mandates to large counties

Tips for Building an ADU in Chandler

  • Chandler offers a design menu: either match the primary home's materials/colors/style, or use stucco/EIFS walls with a 4:12 concrete tile roof — decide early because it constrains prefab options
  • Only the habitable ADU gets the 5-ft setback allowance; an attached garage or storage room on the ADU must still meet full district rear/side setbacks
  • Separate utility meters are prohibited — the ADU must share the primary home's water, sewer, and electric service, so verify panel capacity before design
  • Use Chandler's free pre-technical review through Development Services before submitting plans; lots with an ADU cannot later be split unless each lot independently meets zoning minimums

ADU Builders in Chandler

Looking for an ADU builder in Chandler? ADU projects need a contractor experienced with local zoning, the permit process, and utility connections — not every general contractor has built one. We match Chandler homeowners with experienced local ADU contractors who provide free, no-obligation quotes. Getting at least three bids typically saves 20-40% on the same scope.

Sources & References

All data on this page is sourced from official government records and verified market data. View our full methodology.

  1. Chandler Ordinance No. 5113 — 2024 City Code Amendments (ADU Section 35-2202.2, full text) Municipal Code — Accessed 2026-06-10
  2. Chandler Prepares for City Code Amendments to Reflect New State Laws — City of Chandler Planning Department — Accessed 2026-06-10
  3. Arizona HB 2720 Bill Summary (ARS 9-461.18) — Arizona Legislature state_law — Accessed 2026-06-10
  4. Chandler Building Safety Plan Review, Permits and Inspections Planning Department — Accessed 2026-06-10
  5. Chandler Homeowner's Building Permit Manual (PDF) Planning Department — Accessed 2026-06-10
  6. Angi — ADU Construction Cost Data Market Data — Accessed 2026-06-10
  7. Angi — Guest House / ADU Build Costs Market Data — Accessed 2026-06-10
  8. RentCafe — Average Rent in Chandler, AZ (April/May 2026: 1BR $1,506, 2BR $1,777) Market Data — Accessed 2026-06-10

Frequently Asked Questions

Can I build an ADU in Chandler?

Yes. ADUs are allowed in Any lot or parcel where a single-family dwelling is the principal use (Chandler City Code 35-2202.2, residential districts incl. AG-1, SF-D and others amended by Ord. 5113) in Chandler. The maximum size for a detached ADU is 75% of the single-family dwelling's gross floor area (interior habitable area) or 1,000 sq ft, whichever is less. Owner-occupancy is not required, so you can rent out the ADU.

How much does an ADU cost in Chandler?

ADU construction in Chandler typically costs $125,000-$250,000. Garage conversions run $60,000-$140,000, and prefab ADUs cost $85,000-$200,000.

How much can I rent an ADU for in Chandler?

Average ADU rents in Chandler are $1,350-$1,700/mo for a 1-bedroom and $1,600-$2,000/mo for a 2-bedroom unit.

Do I need parking for an ADU in Chandler?

Chandler's code requires 1 additional off-street space per ADU (Ord. 5113, Sec. 35-2202.2(c)); note this appears to conflict with ARS 9-461.18(B)(3), which bars ADU parking mandates - confirm with Chandler Planning. Check with Chandler planning department for the latest Arizona ADU parking rules, as many states have relaxed requirements in recent years.

How long does it take to get an ADU permit in Chandler?

The permit review timeline in Chandler is Confirm with Chandler Development Services (480-782-3000). Fees range from Valuation-based per Chandler fee schedule using ICC Building Valuation Data (minimum permit fee $60); third-party guides estimate roughly 1.5-2% of construction value plus plan review — confirm exact amounts with Chandler Development Services.

Ready to Build in Chandler?

Get free, no-obligation quotes from top-rated ADU contractors in Chandler.

Get Free Quotes →

ADU Guides for Chandler Homeowners

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-07-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.