ADU Rules in Miami, Florida

Complete guide to building an Accessory Dwelling Unit in Miami — zoning, setbacks, permits, costs, and more.

Max Size: City of Miami: confirm current cap with City of Miami Planning (proposed ~500 sq ft / 10% of lot, capped at 800 sq ft). Unincorporated Miami-Dade: 400-800 sq ft in RU-1 districts (varies by district) Setbacks: 5 ft (RU-1 district) Parking: 1 Space Verified: 2026-07-01
ADU Score: 5/10
Moderately friendly · how we score

Miami's ADU regulations are relatively restrictive due to density concerns and hurricane/flood resilience requirements. However, the city recently began exploring ADU policies to address housing affordability. ADUs are allowed in select zones with significant restrictions.

Zoning & Size Requirements [1][2][3]

Yes, you can build an ADU in Miami. A detached ADU can be up to 800 sq ft under current Florida and Miami zoning rules.

Allowed ZonesCity of Miami: ADUs allowed in T3-L under Miami 21; a proposed expansion to T3-R/T3-O passed first reading Feb 2025 — confirm adoption status with City of Miami Planning. (Unincorporated Miami-Dade County allows ADUs in AU/EU/RU/GU districts.)
Max Size (Detached)City of Miami: confirm current cap with City of Miami Planning (proposed ~500 sq ft / 10% of lot, capped at 800 sq ft). Unincorporated Miami-Dade: 400-800 sq ft in RU-1 districts (varies by district)
Max Size (Attached)See max_size_detached — confirm with City of Miami Planning
Max Size (JADU)Not allowed
Max HeightMust not exceed height of principal structure
Max Units1 ADU per lot

Setback Requirements [1][2][3]

Miami requires a rear setback of about 5 ft for a detached ADU, and one off-street parking space is required. Owner-occupancy is set by local rules (confirm with the city).

Rear Setback5 ft (RU-1 district)
Side Setback5 feet
Front Setback25 feet
Parking RequiredMaximum 1 additional space (no more than 2 vehicles); must be on-site or in adjacent swale (Miami-Dade County)
Owner OccupancyEffectively required for rental: an ADU may be rented only if the primary residence is owner-occupied (homestead); same ownership required for both units. Unincorporated Miami-Dade County requires the owner to occupy the principal dwelling (the owner cannot live in the ADU).
Min Lot Size7,500 sq ft (Miami-Dade County minimum for ADUs)

Permit Process & Fees [4]

An ADU permit in Miami typically costs $5,000-$8,000 and takes 120-180 days, through a ministerial, by-right review.

Approval ProcessBy-right / administrative site-plan review + building permit in qualifying districts (a zoning variance is only needed for nonconforming or undersized lots)
Review Timeline120-180 days
Permit Fees$5,000-$8,000
Impact Fees$2,000-$3,500
Plan Check6-8 weeks
Pre-Approved PlansYes — Miami-Dade County ADU Blueprint program offers pre-approved designs for faster permitting

Get Free ADU Quotes in Miami

Tell us about your project and we'll connect you with ADU builders serving Miami. Free, no obligation — you choose who to work with.

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Construction Costs [5][6]

Building an ADU in Miami typically costs $180,000-$350,000 ($240-$460 per sq ft); a garage conversion runs $80,000-$180,000.

Average Build Cost$180,000-$350,000
Cost per Sq Ft$240-$460
Garage Conversion$80,000-$180,000
Prefab ADU (Installed)$120,000-$260,000

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Rental Income Potential [7][8]

A 2-bedroom ADU in Miami rents for around $2,000-$3,000/mo, an estimated 5-7% annual return.

Avg Rent (1 Bedroom)$1,600-$2,200/mo
Avg Rent (2 Bedroom)$2,000-$3,000/mo
Short-Term RentalNot permitted
Est. Annual ROI5-7% annual return

Explore Prefab ADU Options

Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Recent Law Changes

What's Changed Recently

  • Florida SB 48 (2026 session): a statewide ADU mandate passed the Senate 38-0 on Feb 4, 2026 but died in House Messages on Mar 13, 2026 without a House floor vote - local rules still govern; reform is widely expected to return in 2027
  • Miami-Dade County ADU Blueprint program is live: offers pre-approved ADU designs and requires an annually renewed Certificate of Use (obtainable only by the property owner) for all ADUs
  • City of Miami: ordinance to expand ADUs from T3-L to T3-R/T3-O zones passed first reading Feb 2025; final adoption status should be confirmed with City of Miami Planning
  • Miami-Dade County requires owner-occupancy of one unit as a principal residence; fully absentee-owned properties do not qualify for an ADU permit

Tips for Building an ADU in Miami

  • Miami requires extensive flood mitigation; elevated construction adds significant cost
  • Hurricane-resistant design standards are mandatory; budget for reinforcement
  • Salt-air corrosion requires premium materials; factor into long-term costs
  • Zoning variance process is lengthy; engage planning consultants early

ADU Builders in Miami

Looking for an ADU builder in Miami? ADU projects need a contractor experienced with local zoning, the permit process, and utility connections — not every general contractor has built one. We match Miami homeowners with experienced local ADU contractors who provide free, no-obligation quotes. Getting at least three bids typically saves 20-40% on the same scope.

Sources & References

All data on this page is sourced from official government records and verified market data. View our full methodology.

  1. Accessory Dwelling Unit (ADU) — Miami-Dade County Planning Department — Accessed 2026-06-28
  2. ADU Blueprint for Homeowners — Miami-Dade County Planning Department — Accessed 2026-06-28
  3. Miami 21 Zoning Code | City of Miami Municipal Code — Accessed 2026-06-28
  4. City of Miami Code of Ordinances (Municode) Municipal Code — Accessed 2026-02-24
  5. Angi — ADU Construction Cost Data Market Data — Accessed 2026-02-24
  6. Angi — Local ADU Contractor Costs Market Data — Accessed 2026-02-24
  7. Zillow Rental Manager — Market Rent Data Market Data — Accessed 2026-02-24
  8. HUD Fair Market Rents Government Data — Accessed 2026-02-24
  9. Planning & Zoning | City of Miami Planning Department — Accessed 2026-02-24
  10. Florida Live Local Act — ADU Provisions Government Data — Accessed 2026-02-24

Frequently Asked Questions

Can I build an ADU in Miami?

Yes. ADUs are allowed in City of Miami: ADUs allowed in T3-L under Miami 21; a proposed expansion to T3-R/T3-O passed first reading Feb 2025 — confirm adoption status with City of Miami Planning. (Unincorporated Miami-Dade County allows ADUs in AU/EU/RU/GU districts.) in Miami. The maximum size for a detached ADU is City of Miami: confirm current cap with City of Miami Planning (proposed ~500 sq ft / 10% of lot, capped at 800 sq ft). Unincorporated Miami-Dade: 400-800 sq ft in RU-1 districts (varies by district). Owner-occupancy: Effectively required for rental: an ADU may be rented only if the primary residence is owner-occupied (homestead); same ownership required for both units. Unincorporated Miami-Dade County requires the owner to occupy the principal dwelling (the owner cannot live in the ADU).

How much does an ADU cost in Miami?

ADU construction in Miami typically costs $180,000-$350,000. Garage conversions run $80,000-$180,000, and prefab ADUs cost $120,000-$260,000.

How much can I rent an ADU for in Miami?

Average ADU rents in Miami are $1,600-$2,200/mo for a 1-bedroom and $2,000-$3,000/mo for a 2-bedroom unit.

Do I need parking for an ADU in Miami?

Maximum 1 additional space (no more than 2 vehicles); must be on-site or in adjacent swale (Miami-Dade County). Check with Miami planning department for the latest Florida ADU parking rules, as many states have relaxed requirements in recent years.

How long does it take to get an ADU permit in Miami?

The permit review timeline in Miami is 120-180 days. Fees range from $5,000-$8,000.

Ready to Build in Miami?

Get free, no-obligation quotes from top-rated ADU contractors in Miami.

Get Free Quotes →

ADU Guides for Miami Homeowners

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.