Builder Guide

ADU Builders in Miami, FL (2026)

What ADU builders cost in Miami, how to choose one, the questions to ask — plus free, no-obligation quotes from licensed local contractors.

Build cost: $180,000-$350,000 Permit timeline: 120-180 days Free quotes

An ADU builder in Miami is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through Miami's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in Florida.

What ADU Builders Cost in Miami [5][6]

Based on our Miami cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.

New Detached ADU (all-in)$180,000-$350,000
Cost per Sq Ft$240-$460
Garage Conversion$80,000-$180,000
Prefab / Modular ADU (installed)$120,000-$260,000
City Permit & Plan Review$5,000-$8,000
Impact Fees$2,000-$3,500

For a full line-item breakdown, see our Miami ADU cost guide. To confirm what you're allowed to build before you hire, review the Miami ADU rules (max detached size: City of Miami: confirm current cap with City of Miami Planning (proposed ~500 sq ft / 10% of lot, capped at 800 sq ft). Unincorporated Miami-Dade: 400-800 sq ft in RU-1 districts (varies by district); owner-occupancy: Effectively required for rental: an ADU may be rented only if the primary residence is owner-occupied (homestead); same ownership required for both units. Unincorporated Miami-Dade County requires the owner to occupy the principal dwelling (the owner cannot live in the ADU).).

Get Free ADU Quotes in Miami

Tell us about your project and we'll connect you with ADU builders serving Miami. Free, no obligation — you choose who to work with.

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

How to Vet an ADU Builder in Miami

  • License: Confirm a current contractor's license in Florida and that it's in good standing. Ask for the license number and verify it with the state board.
  • ADU-specific experience: Ask how many ADUs they've completed in or near Miami and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
  • Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
  • Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
  • Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits ($5,000-$8,000), plan check (6-8 weeks), and impact fees ($2,000-$3,500) are included.
  • Permit handling: Confirm they manage Miami's permit process ("By-right / administrative site-plan review + building permit in qualifying districts (a zoning variance is only needed for nonconforming or undersized lots)", typically 120-180 days) and who is responsible if revisions are required.
  • Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.

Questions to Ask Before You Hire

  • How many ADUs have you built in Miami in the last two years?
  • Is your bid fixed-price, and what would trigger a change order?
  • Are permits, plan check, and utility connection fees included?
  • What's a realistic timeline, including permit review (120-180 days) and construction?
  • Who is my point of contact and how are delays communicated?
  • What warranty do you provide on workmanship?
  • Can you share three recent Florida ADU client references?

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Are you an ADU builder? Get Miami leads

Homeowners on this page submit real ADU project requests in Miami. We match each one to a local builder. Your first lead is free, then a small per-lead fee — no subscription, and you contract directly with the homeowner.

Get Miami ADU Leads →

Frequently Asked Questions

How much do ADU builders charge in Miami?

ADU builders in Miami typically quote $180,000-$350,000 for a new detached unit, or about $240-$460 per square foot, including design, permitting, and construction. A garage conversion runs $80,000-$180,000 and a prefab/modular ADU averages $120,000-$260,000. Add city permit and plan-review fees of $5,000-$8,000 plus impact fees of $2,000-$3,500. Quotes for the same scope commonly vary 20-40% between builders, so collect at least three bids.

How do I find a good ADU builder in Miami?

Look for a licensed contractor with completed ADU projects in Miami specifically — ADUs involve local zoning, setback rules, and utility connections that general remodelers may not have handled. Verify the license, ask for an ADU-specific portfolio and references, confirm they carry liability and workers' comp insurance, and get a written fixed-price or detailed bid. Submit a request below and we'll forward it to local ADU builders serving Miami for free quotes.

Do ADU builders in Miami handle permits?

Most full-service ADU builders manage the permit process for you. In Miami the approval process is "By-right / administrative site-plan review + building permit in qualifying districts (a zoning variance is only needed for nonconforming or undersized lots)" with a typical review timeline of 120-180 days. Confirm in writing whether permit fees, plan check (6-8 weeks), and impact fees are included in the bid or billed separately.

How long does it take to build an ADU in Miami?

Plan for the permit review (120-180 days in Miami) plus construction. Most detached ADUs take 4-8 months of construction after permits are issued; garage conversions and prefab units are often faster. Ask each builder for a realistic schedule and what could delay it.

Get Free ADU Builder Quotes in Miami

Compare bids from experienced local Miami ADU builders. Free, no obligation.

Get Free Quotes →

More Florida ADU Rules

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.