Zoning & Size Limits
| Requirement | Worcester, MA | Quincy, MA |
| Allowed Zones | All zoning districts - by-right on any lot with a lawfully e | One ADU by right in single-family zoning districts (internal |
| Max Size (Detached) | 900 sq ft by-right (larger is possible via Planning Board special permit) | 900 sq ft or 50% of the principal structure's gross floor area (per 760 CMR 71.02), whichever is less; minimum 320 sq ft for a detached ADU |
| Max Size (Attached) | 900 sq ft by-right (larger via special permit) | 900 sq ft or 50% of the principal structure's gross floor area, whichever is less |
| Max Height | No ADU-specific cap - the most permissive of the d | Detached ADUs limited to one story (city guideline |
| Parking Required | No additional parking required for an ADU (existing required | 1 additional off-street space required only if the ADU is ou |
| Owner Occupancy | Not required (owner need not live on the property; prohibite | Not allowed — prohibited statewide by the Affordable Homes A |
Setback Requirements
| Setback | Worcester, MA | Quincy, MA |
| Rear Setback | 5 ft via the accessory-structure standard (R districts) | Detached ADUs must meet the principal-structure yard setbacks in QZO Table 4.1 — varies by district; Confirm with Quincy Inspectional Services |
| Side Setback | 5 feet | Per QZO Table 4.1 (district-specific) — Confirm with Quincy Inspectional Services |
| Front Setback | ADUs may not be placed in the front yard | Per QZO Table 4.1 (district-specific) — Confirm wi |
Permits & Timeline
| Detail | Worcester, MA | Quincy, MA |
| Permit Timeline | 60-80 days | Standard building-permit review; typically 4-8 weeks — Confirm with Quincy Inspectional Services |
| Permit Fees | $2,800-$4,500 | Valuation-based building permit fee — Confirm with Quincy Inspectional Services |
| Impact Fees | $1,000-$1,800 | None listed in the ADU guidelines — Confirm with Quincy Insp |
| Pre-Approved Plans | Not available | None — Quincy does not offer a pre-approved ADU pl |
Construction Costs
| Cost | Worcester, MA | Quincy, MA |
| Avg Build Cost | $140,000-$280,000 | $250,000-$425,000 |
| Cost Per Sq Ft | $165-$330 | $350-$550 |
| Garage Conversion | $70,000-$160,000 | $150,000-$250,000 |
| Prefab ADU | $110,000-$250,000 | $180,000-$350,000 installed (site work, foundation, and utility connections extra — confirm with manufacturer) |
Rental Income Potential
| Rental | Worcester, MA | Quincy, MA |
| 1BR Avg Rent | $1,250-$1,650/mo | $2,200-$2,700/mo |
| 2BR Avg Rent | $1,550-$2,150/mo | $2,700-$3,300/mo |
| Short-Term Rentals | Not permitted | No — Quincy's ADU guidelines expressly prohibit using an ADU |
| Est. ROI | 7-10% annual return | 5-8% annual return |
Which City Is Better for ADUs?
Worcester scores 6/10 while Quincy scores 6/10 on our ADU-friendliness index.
Both cities offer viable ADU development opportunities — the best choice depends on your specific property, budget, and goals.
Finance Your ADU Project
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more
Get Quotes in Your City
Connect with licensed ADU contractors and get free quotes for your project.