ADU Rules in Quincy, Massachusetts

Complete guide to building an Accessory Dwelling Unit in Quincy — zoning, setbacks, permits, costs, and more.

Max Size: 900 sq ft or 50% of the principal structure's gross floor area (per 760 CMR 71.02), whichever is less; minimum 320 sq ft for a detached ADU Setbacks: Detached ADUs must meet the principal-structure yard setbacks in QZO Table 4.1 — varies by district; Confirm with Quincy Inspectional Services Parking: 1 Space Verified: 2026-07-10
ADU Score: 6/10
Moderately friendly · how we score

Quincy did not broadly allow ADUs before the state acted, but since the Affordable Homes Act took effect on February 2, 2025 it must — and its Inspectional Services guidelines (updated December 11, 2025) now permit one ADU by right in single-family zoning districts, whether internal, attached, or detached. ADUs are capped at 900 sq ft or 50% of the principal structure's gross floor area (whichever is less), detached ADUs are limited to one story with a 320 sq ft minimum, and short-term rental of ADUs is prohibited. ADUs are barred in Bus C/Ind A/Ind B districts, on lots subject to a variance, and below the FEMA 100-year base flood elevation — a real constraint in coastal Quincy.

Zoning & Size Requirements [1][2]

Yes — Quincy allows ADUs. A detached ADU can typically be up to 900 sq ft under current Massachusetts and Quincy zoning rules.

See what this means for your lot — get 3 free quotes from Quincy ADU builders →

Allowed ZonesOne ADU by right in single-family zoning districts (internal, addition, or detached); not allowed in Bus C, Ind A, or Ind B districts, or on a lot subject to a variance
Max Size (Detached)900 sq ft or 50% of the principal structure's gross floor area (per 760 CMR 71.02), whichever is less; minimum 320 sq ft for a detached ADU
Max Size (Attached)900 sq ft or 50% of the principal structure's gross floor area, whichever is less
Max Size (JADU)No JADU category in Massachusetts law
Max HeightDetached ADUs limited to one story (city guideline)
Max Units1 ADU per lot; ADU may not be sold or owned separately from the principal dwelling, and no ADU is permitted below the FEMA 100-year base flood elevation

Setback Requirements [1][2]

Quincy requires a rear setback of about 4 ft for a detached ADU, and one off-street parking space is required. Owner-occupancy is set by local rules (confirm with the city).

Rear SetbackDetached ADUs must meet the principal-structure yard setbacks in QZO Table 4.1 — varies by district; Confirm with Quincy Inspectional Services
Side SetbackPer QZO Table 4.1 (district-specific) — Confirm with Quincy Inspectional Services
Front SetbackPer QZO Table 4.1 (district-specific) — Confirm with Quincy Inspectional Services
Parking Required1 additional off-street space required only if the ADU is outside a 1/2-mile radius of a transit station (Quincy has 4 Red Line stops); existing off-street parking may not be reduced to create the ADU
Owner OccupancyNot allowed — prohibited statewide by the Affordable Homes Act effective Feb 2, 2025
Min Lot SizeNone stated in the ADU guidelines — underlying district lot standards apply; Confirm with Quincy Inspectional Services

Permit Process & Fees [3]

An ADU permit in Quincy typically costs Valuation-based building permit fee — Confirm with Quincy Inspectional Services and takes Standard building-permit review; typically 4-8 weeks — Confirm with Quincy Inspectional Services, through a ministerial, by-right review.

Approval ProcessBy-right building permit through Inspectional Services (1305 Hancock St, 617-376-1000): submit a site plan showing drainage, utilities, and existing/proposed parking plus architectural drawings; must comply with QZO §3.4, 780 CMR (state building code), 527 CMR 18 fire-access rules, the state plumbing code, and Quincy DPW utility regulations
Review TimelineStandard building-permit review; typically 4-8 weeks — Confirm with Quincy Inspectional Services
Permit FeesValuation-based building permit fee — Confirm with Quincy Inspectional Services
Impact FeesNone listed in the ADU guidelines — Confirm with Quincy Inspectional Services
Plan CheckSite plan (drainage, utilities, parking) + architectural drawings required; flood-zone screening against the FEMA 100-Year Flood Hazard Map for Quincy
Pre-Approved PlansNone — Quincy does not offer a pre-approved ADU plan library

Get Free ADU Quotes in Quincy

Tell us about your project and we'll connect you with ADU builders serving Quincy. Free, no obligation — you choose who to work with.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 3 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add budget & project details (optional — helps builders quote faster)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Construction Costs [4]

Building an ADU in Quincy typically costs $250,000-$425,000 ($350-$550 per sq ft); a garage conversion runs $150,000-$250,000.

See what this means for your lot — get 3 free quotes from Quincy ADU builders →

Average Build Cost$250,000-$425,000
Cost per Sq Ft$350-$550
Garage Conversion$150,000-$250,000
Prefab ADU (Installed)$180,000-$350,000 installed (site work, foundation, and utility connections extra — confirm with manufacturer)

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Rental Income Potential [5][6]

A 2-bedroom ADU in Quincy rents for around $2,700-$3,300/mo, an estimated 5-8% annual return.

Avg Rent (1 Bedroom)$2,200-$2,700/mo
Avg Rent (2 Bedroom)$2,700-$3,300/mo
Short-Term RentalNo — Quincy's ADU guidelines expressly prohibit using an ADU as a short-term rental
Est. Annual ROI5-8% annual return

Explore Prefab ADU Options

Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Recent Law Changes

What's Changed Recently

  • Dec 11, 2025 — Quincy Inspectional Services republished updated ADU guidelines: one-story limit for detached ADUs, 320 sq ft detached minimum, FEMA flood-elevation bar, no separate ownership, STR ban
  • Feb 28, 2025 — Quincy issued its first ADU guidelines implementing the state law shortly after it took effect
  • Feb 2, 2025 — Massachusetts Affordable Homes Act §8 and 760 CMR 71 took effect statewide: ADUs by right in single-family districts, no owner-occupancy requirement, parking capped at 1 space (none within 1/2 mile of transit)

Tips for Building an ADU in Quincy

  • Check the FEMA 100-Year Flood Hazard Map first — large parts of coastal Quincy (Houghs Neck, Germantown, Squantum, Adams Shore) sit in flood zones where ADUs below base flood elevation are prohibited
  • Living within 1/2 mile of North Quincy, Wollaston, Quincy Center, or Quincy Adams Red Line stations means no ADU parking space can be required
  • Detached ADUs must be one story and meet full principal-building setbacks (QZO Table 4.1) — an internal basement or attic conversion avoids both constraints
  • Don't plan on Airbnb income: Quincy bans short-term rental of ADUs outright — underwrite with long-term rents ($2,200-$2,700 for a 1BR)
  • If your lot was ever granted a zoning variance, you cannot add an ADU by right — pull your lot's history with Inspectional Services before spending on design
  • Budget for 4-ft frost-depth foundations and avoid winter pours; utility connections must satisfy Quincy DPW regulations, so get DPW sign-off early

ADU Builders in Quincy

Looking for an ADU builder in Quincy? ADU projects need a contractor experienced with local zoning, the permit process, and utility connections — not every general contractor has built one. We match Quincy homeowners with experienced local ADU contractors who provide free, no-obligation quotes. Getting at least three bids typically saves 20-40% on the same scope.

Sources & References

All data on this page is sourced from official government records and verified market data. View our full methodology.

  1. Accessory Dwelling Units — Quincy Inspectional Services (Guidelines December 11, 2025) city_website — Accessed 2026-07-10
  2. Accessory Dwelling Units — Mass.gov (EOHLC) state_statute — Accessed 2026-07-10
  3. Accessory Dwelling Units — Quincy Inspectional Services (Guidelines December 11, 2025) city_website — Accessed 2026-07-10
  4. How Much Does It Cost to Build an ADU in Boston? — Horizon ADU news_media — Accessed 2026-07-10
  5. Average Rent in Quincy, MA — Zumper Rent Research news_media — Accessed 2026-07-10
  6. Average Rent in Quincy, MA — RentHop news_media — Accessed 2026-07-10

Frequently Asked Questions

Can I build an ADU in Quincy?

Yes. ADUs are allowed in One ADU by right in single-family zoning districts (internal, addition, or detached); not allowed in Bus C, Ind A, or Ind B districts, or on a lot subject to a variance in Quincy. The maximum size for a detached ADU is 900 sq ft or 50% of the principal structure's gross floor area (per 760 CMR 71.02), whichever is less; minimum 320 sq ft for a detached ADU. Owner-occupancy: Not allowed — prohibited statewide by the Affordable Homes Act effective Feb 2, 2025.

How much does an ADU cost in Quincy?

ADU construction in Quincy typically costs $250,000-$425,000. Garage conversions run $150,000-$250,000, and prefab ADUs cost $180,000-$350,000 installed (site work, foundation, and utility connections extra — confirm with manufacturer).

How much can I rent an ADU for in Quincy?

Average ADU rents in Quincy are $2,200-$2,700/mo for a 1-bedroom and $2,700-$3,300/mo for a 2-bedroom unit.

Do I need parking for an ADU in Quincy?

1 additional off-street space required only if the ADU is outside a 1/2-mile radius of a transit station (Quincy has 4 Red Line stops); existing off-street parking may not be reduced to create the ADU. Check with Quincy planning department for the latest Massachusetts ADU parking rules, as many states have relaxed requirements in recent years.

How long does it take to get an ADU permit in Quincy?

The permit review timeline in Quincy is Standard building-permit review; typically 4-8 weeks — Confirm with Quincy Inspectional Services. Fees range from Valuation-based building permit fee — Confirm with Quincy Inspectional Services.

Ready to Build in Quincy?

Get free, no-obligation quotes from top-rated ADU contractors in Quincy.

Get Free Quotes →

ADU Guides for Quincy Homeowners

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-07-10. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.