ADU Builders in Arlington, VA (2026)

What ADU builders cost in Arlington, how to choose one, the questions to ask — plus free, no-obligation quotes from independent local contractors (verify license and insurance before hiring).

Build cost: $150,000-$350,000 Permit timeline: About 30 days for the AD Permit once the Zoning Division accepts the application as complete (county AD Permit page); the county recommends filing it at least two weeks before the building-permit application. No published review time for the residential building permit. Free quotes

An ADU builder in Arlington is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through Arlington's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in Virginia.

What ADU Builders Cost in Arlington [9][10][11][12]

Based on our Arlington cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.

New Detached ADU (all-in)$150,000-$350,000
Cost per Sq Ft$200-$400
Garage Conversion$80,000-$160,000
Prefab / Modular ADU (installed)$150,000-$300,000
City Permit & Plan ReviewAD Permit $582 plus $387 if a DES parking survey is needed (FY2027 Planning and Zoning fee schedule, effective July 1, 2026). Building permit $1.70 per sq ft for new construction/additions or $0.63 per sq ft for alterations, plus a 2% state levy and a 10% automation surcharge; CO for an AD $520.
Impact FeesNone. Arlington charges no development impact or capacity fee for an accessory dwelling; costs are limited to permit, plan-review and trade-permit fees and any utility connection charges from the Department of Environmental Services.

For a full line-item breakdown, see our Arlington ADU cost guide. To confirm what you're allowed to build before you hire, review the Arlington ADU rules (max detached size: Gross floor area capped at the lesser of 750 sq ft or 35% of the combined floor area of house plus AD when the house is at least 1,000 sq ft; 500 sq ft or 45% when the house is under 1,000 sq ft (§12.9.2.A.2(e)). A detached accessory building approved after May 18, 2019 may hold an AD only if its footprint is 560 sq ft or less in R-5/R-6, 650 sq ft or less in the other R districts (§12.9.2.A.2(d)). GFA counts attic and basement space (§3.1.1).; owner-occupancy: Required: the owner of the main dwelling must occupy either the main dwelling or the AD as their primary residence; otherwise the whole property may be occupied by only one family (§12.9.2.C.3). A covenant is recorded before the building permit; an affidavit of compliance is filed before the certificate of occupancy and again on any structural change or sale (§12.9.2.C.1, C.4). SB 531 (2026) does not change this: Code §15.2-2292.4(I) exempts localities whose ADU ordinance predates Jan 1, 2026.).

Get Free ADU Quotes in Arlington

Tell us about your project and we'll pass it to ADU builders serving Arlington. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

How to Vet an ADU Builder in Arlington

  • License: Confirm a current contractor's license in Virginia and that it's in good standing. Ask for the license number and verify it with the state board.
  • ADU-specific experience: Ask how many ADUs they've completed in or near Arlington and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
  • Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
  • Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
  • Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits (AD Permit $582 plus $387 if a DES parking survey is needed (FY2027 Planning and Zoning fee schedule, effective July 1, 2026). Building permit $1.70 per sq ft for new construction/additions or $0.63 per sq ft for alterations, plus a 2% state levy and a 10% automation surcharge; CO for an AD $520.), plan check (Zoning reviews the AD Permit and the building permit for §12.9.2, §3.2 and §14.3 compliance ($260 zoning review for a detached garage/accessory structure or $384 for an interior alteration to a one-family dwelling, FY2027); ISD reviews to the Virginia Uniform Statewide Building Code. Trade permits: electrical minimum $186, mechanical $149, plumbing $149.), and impact fees (None. Arlington charges no development impact or capacity fee for an accessory dwelling; costs are limited to permit, plan-review and trade-permit fees and any utility connection charges from the Department of Environmental Services.) are included.
  • Permit handling: Confirm they manage Arlington's permit process ("Two permits: (1) an Accessory Dwelling Permit from the Zoning Division, filed in Permit Arlington as a 'Zoning Application' with floor plans, a certified plat, a site plan, the Acknowledgement and Agreement, and the Declaration of Covenants; the Zoning Administrator signs it - no hearing. (2) A Residential Building Permit plus trade permits from Inspection Services (ISD), which cannot issue until the AD Permit is issued and the covenant is recorded. Zoning and ISD inspect; an Affidavit of Compliance precedes the Certificate of Occupancy.", typically About 30 days for the AD Permit once the Zoning Division accepts the application as complete (county AD Permit page); the county recommends filing it at least two weeks before the building-permit application. No published review time for the residential building permit.) and who is responsible if revisions are required.
  • Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.

Questions to Ask Before You Hire

  • How many ADUs have you built in Arlington in the last two years?
  • Is your bid fixed-price, and what would trigger a change order?
  • Are permits, plan check, and utility connection fees included?
  • What's a realistic timeline, including permit review (About 30 days for the AD Permit once the Zoning Division accepts the application as complete (county AD Permit page); the county recommends filing it at least two weeks before the building-permit application. No published review time for the residential building permit.) and construction?
  • Who is my point of contact and how are delays communicated?
  • What warranty do you provide on workmanship?
  • Can you share three recent Virginia ADU client references?

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Are you an ADU builder? Get Arlington leads

Homeowners on this page submit real ADU project requests in Arlington. Each one goes to up to five local builders — that is what the homeowner agrees to — so claiming never takes it from anyone and there is no bidding. In practice far fewer ever make contact, which is why the number is five rather than three. A flat $50 only on the leads you accept: no subscription, no contract, and you deal with the homeowner directly.

Get Arlington ADU Leads →

Frequently Asked Questions

How much do ADU builders charge in Arlington?

ADU builders in Arlington typically quote $150,000-$350,000 for a new detached unit, or about $200-$400 per square foot, including design, permitting, and construction. A garage conversion runs $80,000-$160,000 and a prefab/modular ADU averages $150,000-$300,000. Add city permit and plan-review fees (AD Permit $582 plus $387 if a DES parking survey is needed (FY2027 Planning and Zoning fee schedule, effective July 1, 2026). Building permit $1.70 per sq ft for new construction/additions or $0.63 per sq ft for alterations, plus a 2% state levy and a 10% automation surcharge; CO for an AD $520.) plus impact fees of None. Arlington charges no development impact or capacity fee for an accessory dwelling; costs are limited to permit, plan-review and trade-permit fees and any utility connection charges from the Department of Environmental Services.. Quotes for the same scope commonly vary 20-40% between builders, so collect at least three bids.

How do I find a good ADU builder in Arlington?

Look for a licensed contractor with completed ADU projects in Arlington specifically — ADUs involve local zoning, setback rules, and utility connections that general remodelers may not have handled. Verify the license, ask for an ADU-specific portfolio and references, confirm they carry liability and workers' comp insurance, and get a written fixed-price or detailed bid. Submit a request below and we'll forward it to local ADU builders serving Arlington for free quotes.

Do ADU builders in Arlington handle permits?

Most full-service ADU builders manage the permit process for you. In Arlington the approval process is "Two permits: (1) an Accessory Dwelling Permit from the Zoning Division, filed in Permit Arlington as a 'Zoning Application' with floor plans, a certified plat, a site plan, the Acknowledgement and Agreement, and the Declaration of Covenants; the Zoning Administrator signs it - no hearing. (2) A Residential Building Permit plus trade permits from Inspection Services (ISD), which cannot issue until the AD Permit is issued and the covenant is recorded. Zoning and ISD inspect; an Affidavit of Compliance precedes the Certificate of Occupancy." with a typical review timeline of About 30 days for the AD Permit once the Zoning Division accepts the application as complete (county AD Permit page); the county recommends filing it at least two weeks before the building-permit application. No published review time for the residential building permit.. Confirm in writing whether permit fees, plan check (Zoning reviews the AD Permit and the building permit for §12.9.2, §3.2 and §14.3 compliance ($260 zoning review for a detached garage/accessory structure or $384 for an interior alteration to a one-family dwelling, FY2027); ISD reviews to the Virginia Uniform Statewide Building Code. Trade permits: electrical minimum $186, mechanical $149, plumbing $149.), and impact fees are included in the bid or billed separately.

How long does it take to build an ADU in Arlington?

Plan for the permit review (About 30 days for the AD Permit once the Zoning Division accepts the application as complete (county AD Permit page); the county recommends filing it at least two weeks before the building-permit application. No published review time for the residential building permit. in Arlington) plus construction. Most detached ADUs take 4-8 months of construction after permits are issued; garage conversions and prefab units are often faster. Ask each builder for a realistic schedule and what could delay it.

Get Free ADU Builder Quotes in Arlington

Compare bids from experienced local Arlington ADU builders. Free, no obligation.

Get Free Quotes →

More Virginia ADU Rules

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.