Builder Guide

ADU Builders in Nashville, TN (2026)

What ADU builders cost in Nashville, how to choose one, the questions to ask — plus free, no-obligation quotes from independent local contractors (verify license and insurance before hiring).

Build cost: $200,000-$300,000 Permit timeline: Not published: Metro Codes posts no review-time target for residential permits. The permit issues once the zoning examiner's checklist of agency sign-offs is complete and the covenant is recorded; Codes says to allow plenty of time and to track the application in ePermits Free quotes
Not by right — Nashville allows ADUs only case by case. Inside the Urban Services District a DADU has been permitted with conditions on any RS, R, RM or AG lot since December 12, 2025 (BL2025-1007): no overlay, no hearing, just a zoning examiner's check of Metro Code 17.16.030.G. In the General Services District, which covers the county's outer suburbs, a DADU is allowed only where a council-adopted DADU overlay, an SP or a UDO provides for one. Read the current Nashville ADU rules before hiring anyone; a contractor quote here is for planning only.

An ADU builder in Nashville is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through Nashville's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in Tennessee.

What ADU Builders Cost in Nashville [11][12][13][14]

Based on our Nashville cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.

New Detached ADU (all-in)$200,000-$300,000
Cost per Sq Ft$250-$475
Garage Conversion$70,000-$120,000
Prefab / Modular ADU (installed)$200,000-$400,000
City Permit & Plan Review$5.00 per $1,000 of construction value (Metro Code 16.28.110.A.1) plus a $25 zoning exam fee and a 10% Codes tech fee; no plan-review fee for one- and two-family work. A 700 sq ft DADU valued on the ICC table at $169.09/sq ft (about $118,000) comes to roughly $675 before trade permits
Impact FeesNo development impact fee appears in the Codes fee schedule, but Metro Water Services charges capacity fees of $1,375 (water) and $2,300 (sewer) per 350-gallon-per-day unit of flow, a stormwater capacity fee of $0.71 per sq ft of new impervious area, and tap fees if the DADU gets its own meter ($500 for a 5/8-inch water tap, $360 for a 6-inch sewer tap) (MWS Development Fee Schedule, Schedule 15.10.110, rev. January 28, 2025). Ask MWS how many units of flow your DADU is assessed

For a full line-item breakdown, see our Nashville ADU cost guide. To confirm what you're allowed to build before you hire, review the Nashville ADU rules (max detached size: 700 sq ft of living space on lots under 10,000 sq ft; 850 sq ft on lots of 10,000 sq ft or more; never larger than the principal house (17.16.030.G.7.a, as amended December 4, 2025). The DADU footprint may not exceed the house footprint, and no other accessory building may exceed 200 sq ft once a DADU is on the lot (G.1.b); owner-occupancy: Required: the DADU must be owned by the same person or entity as the house and one of the two dwellings must be owner-occupied (17.16.030.G.3.d); a restrictive covenant saying so is recorded with the Register of Deeds ($12) before the permit issues (G.10)).

Get Free ADU Quotes in Nashville

Tell us about your project and we'll pass it to ADU builders serving Nashville. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

How to Vet an ADU Builder in Nashville

  • License: Confirm a current contractor's license in Tennessee and that it's in good standing. Ask for the license number and verify it with the state board.
  • ADU-specific experience: Ask how many ADUs they've completed in or near Nashville and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
  • Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
  • Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
  • Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits ($5.00 per $1,000 of construction value (Metro Code 16.28.110.A.1) plus a $25 zoning exam fee and a 10% Codes tech fee; no plan-review fee for one- and two-family work. A 700 sq ft DADU valued on the ICC table at $169.09/sq ft (about $118,000) comes to roughly $675 before trade permits), plan check (The plans-examination fee is waived for one- and two-family permits (16.28.110.G.2). Codes does not normally require construction drawings for houses under 5,000 sq ft; a DADU still needs the site plan, four-corner elevations and floor plan for the zoning examiner, and building, electrical, plumbing, energy and gas/mechanical compliance is checked by field inspection), and impact fees (No development impact fee appears in the Codes fee schedule, but Metro Water Services charges capacity fees of $1,375 (water) and $2,300 (sewer) per 350-gallon-per-day unit of flow, a stormwater capacity fee of $0.71 per sq ft of new impervious area, and tap fees if the DADU gets its own meter ($500 for a 5/8-inch water tap, $360 for a 6-inch sewer tap) (MWS Development Fee Schedule, Schedule 15.10.110, rev. January 28, 2025). Ask MWS how many units of flow your DADU is assessed) are included.
  • Permit handling: Confirm they manage Nashville's permit process ("A registered contractor must pull the permit; owners may not self-permit a new DADU or a garage-to-DADU conversion (Metro Codes DADU page, updated December 22, 2025). File the Residential Permit Application through Codes ePermits or the Zoning Help Desk with a site plan showing property lines, setbacks and easements, elevations from all four corners showing eave and ridge heights, and a floor plan showing the living-space area. A zoning examiner checks the 17.16.030.G conditions and issues a checklist of sign-offs: Metro Water Services (availability and capacity fees), Stormwater for added impervious area, the Historic Zoning Commission in a historic overlay, and Planning in an SP or UDO. Record the DADU restrictive covenant with the Register of Deeds, collect the sign-offs, pay the fees, then schedule inspections. Plumbing, electrical and gas/mechanical permits are pulled separately by licensed trades", typically Not published: Metro Codes posts no review-time target for residential permits. The permit issues once the zoning examiner's checklist of agency sign-offs is complete and the covenant is recorded; Codes says to allow plenty of time and to track the application in ePermits) and who is responsible if revisions are required.
  • Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.

Questions to Ask Before You Hire

  • How many ADUs have you built in Nashville in the last two years?
  • Is your bid fixed-price, and what would trigger a change order?
  • Are permits, plan check, and utility connection fees included?
  • What's a realistic timeline, including permit review (Not published: Metro Codes posts no review-time target for residential permits. The permit issues once the zoning examiner's checklist of agency sign-offs is complete and the covenant is recorded; Codes says to allow plenty of time and to track the application in ePermits) and construction?
  • Who is my point of contact and how are delays communicated?
  • What warranty do you provide on workmanship?
  • Can you share three recent Tennessee ADU client references?

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Are you an ADU builder? Get Nashville leads

Homeowners on this page submit real ADU project requests in Nashville. Each one goes to up to five local builders — that is what the homeowner agrees to — so claiming never takes it from anyone and there is no bidding. In practice far fewer ever make contact, which is why the number is five rather than three. A flat $50 only on the leads you accept: no subscription, no contract, and you deal with the homeowner directly.

Get Nashville ADU Leads →

Frequently Asked Questions

How much do ADU builders charge in Nashville?

ADU builders in Nashville typically quote $200,000-$300,000 for a new detached unit, or about $250-$475 per square foot, including design, permitting, and construction. A garage conversion runs $70,000-$120,000 and a prefab/modular ADU averages $200,000-$400,000. Add city permit and plan-review fees ($5.00 per $1,000 of construction value (Metro Code 16.28.110.A.1) plus a $25 zoning exam fee and a 10% Codes tech fee; no plan-review fee for one- and two-family work. A 700 sq ft DADU valued on the ICC table at $169.09/sq ft (about $118,000) comes to roughly $675 before trade permits) plus impact fees of No development impact fee appears in the Codes fee schedule, but Metro Water Services charges capacity fees of $1,375 (water) and $2,300 (sewer) per 350-gallon-per-day unit of flow, a stormwater capacity fee of $0.71 per sq ft of new impervious area, and tap fees if the DADU gets its own meter ($500 for a 5/8-inch water tap, $360 for a 6-inch sewer tap) (MWS Development Fee Schedule, Schedule 15.10.110, rev. January 28, 2025). Ask MWS how many units of flow your DADU is assessed. Quotes for the same scope commonly vary 20-40% between builders, so collect at least three bids.

How do I find a good ADU builder in Nashville?

Look for a licensed contractor with completed ADU projects in Nashville specifically — ADUs involve local zoning, setback rules, and utility connections that general remodelers may not have handled. Verify the license, ask for an ADU-specific portfolio and references, confirm they carry liability and workers' comp insurance, and get a written fixed-price or detailed bid. Submit a request below and we'll forward it to local ADU builders serving Nashville for free quotes.

Do ADU builders in Nashville handle permits?

Most full-service ADU builders manage the permit process for you. In Nashville the approval process is "A registered contractor must pull the permit; owners may not self-permit a new DADU or a garage-to-DADU conversion (Metro Codes DADU page, updated December 22, 2025). File the Residential Permit Application through Codes ePermits or the Zoning Help Desk with a site plan showing property lines, setbacks and easements, elevations from all four corners showing eave and ridge heights, and a floor plan showing the living-space area. A zoning examiner checks the 17.16.030.G conditions and issues a checklist of sign-offs: Metro Water Services (availability and capacity fees), Stormwater for added impervious area, the Historic Zoning Commission in a historic overlay, and Planning in an SP or UDO. Record the DADU restrictive covenant with the Register of Deeds, collect the sign-offs, pay the fees, then schedule inspections. Plumbing, electrical and gas/mechanical permits are pulled separately by licensed trades". Review time: not published: Metro Codes posts no review-time target for residential permits. The permit issues once the zoning examiner's checklist of agency sign-offs is complete and the covenant is recorded; Codes says to allow plenty of time and to track the application in ePermits. Confirm in writing whether permit fees, plan check (The plans-examination fee is waived for one- and two-family permits (16.28.110.G.2). Codes does not normally require construction drawings for houses under 5,000 sq ft; a DADU still needs the site plan, four-corner elevations and floor plan for the zoning examiner, and building, electrical, plumbing, energy and gas/mechanical compliance is checked by field inspection), and impact fees are included in the bid or billed separately.

How long does it take to build an ADU in Nashville?

Plan for the permit review (Not published: Metro Codes posts no review-time target for residential permits. The permit issues once the zoning examiner's checklist of agency sign-offs is complete and the covenant is recorded; Codes says to allow plenty of time and to track the application in ePermits in Nashville) plus construction. Most detached ADUs take 4-8 months of construction after permits are issued; garage conversions and prefab units are often faster. Ask each builder for a realistic schedule and what could delay it.

Get Free ADU Builder Quotes in Nashville

Compare bids from experienced local Nashville ADU builders. Free, no obligation.

Get Free Quotes →
About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.