Builder Guide

ADU Builders in Richardson, TX (2026)

What ADU builders cost in Richardson, how to choose one, the questions to ask — plus free, no-obligation quotes from independent local contractors (verify license and insurance before hiring).

Build cost: $140,000-$350,000 Permit timeline: Not published. Building Inspection (972-744-4180) posts no review time for accessory-building permits, and no ADU timeline exists because no ADU use exists. Free quotes
No — Richardson does not currently permit ADUs. Richardson's Comprehensive Zoning Ordinance of 1956, codified through Ord. No. 4590 (June 15, 2026) with nothing in the ten ordinances adopted since, lists no accessory dwelling unit, garage apartment or guest house as a permitted use in any residential district, and Art. II, Sec. 3 closes the use lists. The one accessory living space it recognises, Servants' quarters, is by definition not rented, not a separate dwelling, and may not have kitchen facilities or separate utility connections (Art. I, Sec. 2). Council began a zoning-ordinance modernisation in February 2026; no ADU text has been published. Read the current Richardson ADU rules before hiring anyone; a contractor quote here is for planning only.

An ADU builder in Richardson is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through Richardson's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in Texas.

What ADU Builders Cost in Richardson [10][11][12]

Based on our Richardson cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.

New Detached ADU (all-in)$140,000-$350,000
Cost per Sq Ft$250-$400
Garage Conversion$30,000-$100,000
Prefab / Modular ADU (installed)$150,000-$300,000
City Permit & Plan ReviewAccessory building permit: $100 for a structure of 150 sq ft or less, $200 for one larger than 150 sq ft; a room addition is $200 up to 500 sq ft, then $200 plus $0.10/sq ft (Appendix B, Master Fee Schedule, Ord. 4559, Sept. 15, 2025).
Impact FeesNone found. The Master Fee Schedule (Appendix B, as amended through Ord. 4560, Oct. 13, 2025) lists no development impact fee for residential work; the only impact-related charges are traffic impact analysis reviews filed with a zoning request ($500 without modelling, $1,500 with). Water and sewer connection charges are billed per the schedule; confirm with Development Services

For a full line-item breakdown, see our Richardson ADU cost guide. To confirm what you're allowed to build before you hire, review the Richardson ADU rules (max detached size: N/A: a detached second dwelling is not a permitted use. Detached accessory buildings are capped instead: all detached structures together, garages included, may occupy no more than 8% of the lot area and may not exceed 40% of the floor area of the principal dwelling (Art. IV, Sec. 4(d)(2); Art. VII, Sec. 4(d)(2)). Servants' quarters, the only accessory living space allowed, may not have kitchen facilities or separate utility connections (Art. I, Sec. 2); owner-occupancy: Moot for ADUs, since none may be built. Servants' quarters must be occupied by persons employed full-time on the premises as domestic help by the occupant, and may not be rented (Art. I, Sec. 2). Renting rooms inside the house is allowed to a maximum of two individual renters or tenants (Art. IV, Sec. 1(j); Art. VII, Sec. 1(j))).

Get Free ADU Quotes in Richardson

Tell us about your project and we'll pass it to ADU builders serving Richardson. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

How to Vet an ADU Builder in Richardson

  • License: Confirm a current contractor's license in Texas and that it's in good standing. Ask for the license number and verify it with the state board.
  • ADU-specific experience: Ask how many ADUs they've completed in or near Richardson and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
  • Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
  • Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
  • Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits (Accessory building permit: $100 for a structure of 150 sq ft or less, $200 for one larger than 150 sq ft; a room addition is $200 up to 500 sq ft, then $200 plus $0.10/sq ft (Appendix B, Master Fee Schedule, Ord. 4559, Sept. 15, 2025).), plan check (Scaled drawings are required for any accessory building over 150 sq ft, and each exterior wall of a building over 150 sq ft must be at least 35% masonry (Art. IV, Sec. 2(b)(2)); 150 sq ft or less may be wood or metal. The building must be permanently anchored, and the approved permit must be posted on site before work starts. Richardson has adopted the 2021 International Codes and the 2020 National Electrical Code, and every contractor must be registered with the city ($100, Sec. 6-116)), and impact fees (None found. The Master Fee Schedule (Appendix B, as amended through Ord. 4560, Oct. 13, 2025) lists no development impact fee for residential work; the only impact-related charges are traffic impact analysis reviews filed with a zoning request ($500 without modelling, $1,500 with). Water and sewer connection charges are billed per the schedule; confirm with Development Services) are included.
  • Permit handling: Confirm they manage Richardson's permit process ("There is no ADU permit in Richardson because there is no ADU use to permit. A second unit would need a zoning change, realistically a PD planned development district whose uses and standards are written for the individual tract (Art. II, Sec. 1; Art. XXI-C): a City Plan Commission and City Council process, filing fee $2,500 (Appendix B), not a counter application. For an ordinary accessory building, Building Inspection requires a permit for any structure over 40 sq ft; 150 sq ft or less needs an application with a location sketch, anything larger needs scaled drawings. Submit by email to permits@cor.gov or at 2360 Campbell Creek Blvd, Suite 550", typically Not published. Building Inspection (972-744-4180) posts no review time for accessory-building permits, and no ADU timeline exists because no ADU use exists.) and who is responsible if revisions are required.
  • Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.

Questions to Ask Before You Hire

  • How many ADUs have you built in Richardson in the last two years?
  • Is your bid fixed-price, and what would trigger a change order?
  • Are permits, plan check, and utility connection fees included?
  • What's a realistic timeline, including permit review (Not published. Building Inspection (972-744-4180) posts no review time for accessory-building permits, and no ADU timeline exists because no ADU use exists.) and construction?
  • Who is my point of contact and how are delays communicated?
  • What warranty do you provide on workmanship?
  • Can you share three recent Texas ADU client references?

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Are you an ADU builder? Get Richardson leads

Homeowners on this page submit real ADU project requests in Richardson. Each one goes to up to five local builders — that is what the homeowner agrees to — so claiming never takes it from anyone and there is no bidding. In practice far fewer ever make contact, which is why the number is five rather than three. A flat $50 only on the leads you accept: no subscription, no contract, and you deal with the homeowner directly.

Get Richardson ADU Leads →

Frequently Asked Questions

How much do ADU builders charge in Richardson?

ADU builders in Richardson typically quote $140,000-$350,000 for a new detached unit, or about $250-$400 per square foot, including design, permitting, and construction. A garage conversion runs $30,000-$100,000 and a prefab/modular ADU averages $150,000-$300,000. Add city permit and plan-review fees (Accessory building permit: $100 for a structure of 150 sq ft or less, $200 for one larger than 150 sq ft; a room addition is $200 up to 500 sq ft, then $200 plus $0.10/sq ft (Appendix B, Master Fee Schedule, Ord. 4559, Sept. 15, 2025).) plus impact fees of None found. The Master Fee Schedule (Appendix B, as amended through Ord. 4560, Oct. 13, 2025) lists no development impact fee for residential work; the only impact-related charges are traffic impact analysis reviews filed with a zoning request ($500 without modelling, $1,500 with). Water and sewer connection charges are billed per the schedule; confirm with Development Services. Quotes for the same scope commonly vary 20-40% between builders, so collect at least three bids.

How do I find a good ADU builder in Richardson?

Look for a licensed contractor with completed ADU projects in Richardson specifically — ADUs involve local zoning, setback rules, and utility connections that general remodelers may not have handled. Verify the license, ask for an ADU-specific portfolio and references, confirm they carry liability and workers' comp insurance, and get a written fixed-price or detailed bid. Submit a request below and we'll forward it to local ADU builders serving Richardson for free quotes.

Do ADU builders in Richardson handle permits?

Most full-service ADU builders manage the permit process for you. In Richardson the approval process is "There is no ADU permit in Richardson because there is no ADU use to permit. A second unit would need a zoning change, realistically a PD planned development district whose uses and standards are written for the individual tract (Art. II, Sec. 1; Art. XXI-C): a City Plan Commission and City Council process, filing fee $2,500 (Appendix B), not a counter application. For an ordinary accessory building, Building Inspection requires a permit for any structure over 40 sq ft; 150 sq ft or less needs an application with a location sketch, anything larger needs scaled drawings. Submit by email to permits@cor.gov or at 2360 Campbell Creek Blvd, Suite 550". Review time: not published. Building Inspection (972-744-4180) posts no review time for accessory-building permits, and no ADU timeline exists because no ADU use exists. Confirm in writing whether permit fees, plan check (Scaled drawings are required for any accessory building over 150 sq ft, and each exterior wall of a building over 150 sq ft must be at least 35% masonry (Art. IV, Sec. 2(b)(2)); 150 sq ft or less may be wood or metal. The building must be permanently anchored, and the approved permit must be posted on site before work starts. Richardson has adopted the 2021 International Codes and the 2020 National Electrical Code, and every contractor must be registered with the city ($100, Sec. 6-116)), and impact fees are included in the bid or billed separately.

How long does it take to build an ADU in Richardson?

Plan for the permit review (Not published. Building Inspection (972-744-4180) posts no review time for accessory-building permits, and no ADU timeline exists because no ADU use exists. in Richardson) plus construction. Most detached ADUs take 4-8 months of construction after permits are issued; garage conversions and prefab units are often faster. Ask each builder for a realistic schedule and what could delay it.

Get Free ADU Builder Quotes in Richardson

Compare bids from experienced local Richardson ADU builders. Free, no obligation.

Get Free Quotes →

More Texas ADU Rules

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.