Build cost: $160,000-$320,000 Permit timeline: No ADU-specific figure is published. Residential Plan Review targets 7 business days for the administrative completeness check and 15 business days for substantive review per cycle; the pre-application meeting is usually scheduled within a week. Allow for at least one correction cycle. Free quotes

An ADU builder in Scottsdale is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through Scottsdale's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in Arizona.

What ADU Builders Cost in Scottsdale [14][15][16][17]

Based on our Scottsdale cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.

New Detached ADU (all-in)$160,000-$320,000
Cost per Sq Ft$200-$400
Garage Conversion$80,000-$165,000
Prefab / Modular ADU (installed)$155,000-$300,000
City Permit & Plan ReviewFY2026/27 schedule (Res. 13661, from July 1, 2026): pre-application $131, ADU staff-approval review $131, permit $237 base plus $0.94/sq ft livable and $0.54/sq ft covered, plan review $0.54 and $0.34/sq ft, CO $195, GIS $379: about $1,800 for 500 sq ft, $2,550 for 1,000 sq ft.
Impact FeesScottsdale's development (impact) fees are water and wastewater only, charged per new meter: $8,836 water plus $6,028 wastewater = $14,864 for a 5/8-1 in. meter (Schedule #09-15-25, effective September 15, 2025; Scottsdale Revised Code Sec. 49-82). Sec. 7.900 has the ADU branch off the house's existing water and sewer tap on private property, so a standard ADU should not add a meter; confirm with Water Resources (480-312-5685) before budgeting.

For a full line-item breakdown, see our Scottsdale ADU cost guide. To confirm what you're allowed to build before you hire, review the Scottsdale ADU rules (max detached size: First ADU on the lot: 1,000 sq ft or 75% of the existing main house, whichever is less (Sec. 7.900; ARS 9-461.18 measures interior habitable area). The second and any third ADU: 500 sq ft each. Every ADU needs a private outdoor living space at least 5 ft deep and 50 sq ft, and no more than 6 adults may live in the house and ADUs combined.; owner-occupancy: Not required for a long-term rental: the house and the ADU may be leased separately for 90 days or month-to-month (ARS 9-461.18(B)(1)-(2)). The owner must reside on the premises if the house or any ADU is rented or offered as a vacation or short-term rental (Sec. 7.900 and 7.203; authority ARS 9-500.39(B)(9)). An ADU cannot be sold separately or split off by subdivision or condominium plat.).

Get Free ADU Quotes in Scottsdale

Tell us about your project and we'll pass it to ADU builders serving Scottsdale. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

How to Vet an ADU Builder in Scottsdale

  • License: Confirm a current contractor's license in Arizona and that it's in good standing. Ask for the license number and verify it with the state board.
  • ADU-specific experience: Ask how many ADUs they've completed in or near Scottsdale and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
  • Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
  • Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
  • Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits (FY2026/27 schedule (Res. 13661, from July 1, 2026): pre-application $131, ADU staff-approval review $131, permit $237 base plus $0.94/sq ft livable and $0.54/sq ft covered, plan review $0.54 and $0.34/sq ft, CO $195, GIS $379: about $1,800 for 500 sq ft, $2,550 for 1,000 sq ft.), plan check (Full residential plan review in SPUR: an administrative completeness check (7 business days), then substantive review by Planning, Building, Engineering, Stormwater and Fire (15 business days); corrections restart the cycle. Fees are charged on both conditioned and covered square footage, and grading/drainage sheets are priced per sheet by landform. ESL lots add NAOS, native-plant and wash review; a lot in a special flood hazard area needs a $363 lowest-floor certificate review. State law bars a fire-sprinkler or commercial-code requirement for an ADU (ARS 9-461.18(D)).), and impact fees (Scottsdale's development (impact) fees are water and wastewater only, charged per new meter: $8,836 water plus $6,028 wastewater = $14,864 for a 5/8-1 in. meter (Schedule #09-15-25, effective September 15, 2025; Scottsdale Revised Code Sec. 49-82). Sec. 7.900 has the ADU branch off the house's existing water and sewer tap on private property, so a standard ADU should not add a meter; confirm with Water Resources (480-312-5685) before budgeting.) are included.
  • Permit handling: Confirm they manage Scottsdale's permit process ("Three steps under Sec. 7.900, all in the Scottsdale SPUR portal (which replaced eServices on January 6, 2026): 1) online Pre-Application ($131) with a site plan, elevations and utility information, then a 30-60 minute meeting with a planner, usually scheduled within a week; 2) formal administrative application for Development Review - Staff Approval (ADU line, $131), with no public hearing, Development Review Board or use permit (ARS 9-461.18 'permitted use'); 3) building permit with construction documents through Residential Plan Review (Planning, Building, Engineering, Stormwater and Fire). The ADU gets its own address and separate electric and gas meters. One Stop Shop, 7447 E. Indian School Rd, 480-312-7725.", typically No ADU-specific figure is published. Residential Plan Review targets 7 business days for the administrative completeness check and 15 business days for substantive review per cycle; the pre-application meeting is usually scheduled within a week. Allow for at least one correction cycle.) and who is responsible if revisions are required.
  • Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.

Questions to Ask Before You Hire

  • How many ADUs have you built in Scottsdale in the last two years?
  • Is your bid fixed-price, and what would trigger a change order?
  • Are permits, plan check, and utility connection fees included?
  • What's a realistic timeline, including permit review (No ADU-specific figure is published. Residential Plan Review targets 7 business days for the administrative completeness check and 15 business days for substantive review per cycle; the pre-application meeting is usually scheduled within a week. Allow for at least one correction cycle.) and construction?
  • Who is my point of contact and how are delays communicated?
  • What warranty do you provide on workmanship?
  • Can you share three recent Arizona ADU client references?

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Are you an ADU builder? Get Scottsdale leads

Homeowners on this page submit real ADU project requests in Scottsdale. Each one goes to up to five local builders — that is what the homeowner agrees to — so claiming never takes it from anyone and there is no bidding. In practice far fewer ever make contact, which is why the number is five rather than three. A flat $50 only on the leads you accept: no subscription, no contract, and you deal with the homeowner directly.

Get Scottsdale ADU Leads →

Frequently Asked Questions

How much do ADU builders charge in Scottsdale?

ADU builders in Scottsdale typically quote $160,000-$320,000 for a new detached unit, or about $200-$400 per square foot, including design, permitting, and construction. A garage conversion runs $80,000-$165,000 and a prefab/modular ADU averages $155,000-$300,000. Add city permit and plan-review fees (FY2026/27 schedule (Res. 13661, from July 1, 2026): pre-application $131, ADU staff-approval review $131, permit $237 base plus $0.94/sq ft livable and $0.54/sq ft covered, plan review $0.54 and $0.34/sq ft, CO $195, GIS $379: about $1,800 for 500 sq ft, $2,550 for 1,000 sq ft.) plus impact fees of Scottsdale's development (impact) fees are water and wastewater only, charged per new meter: $8,836 water plus $6,028 wastewater = $14,864 for a 5/8-1 in. meter (Schedule #09-15-25, effective September 15, 2025; Scottsdale Revised Code Sec. 49-82). Sec. 7.900 has the ADU branch off the house's existing water and sewer tap on private property, so a standard ADU should not add a meter; confirm with Water Resources (480-312-5685) before budgeting.. Quotes for the same scope commonly vary 20-40% between builders, so collect at least three bids.

How do I find a good ADU builder in Scottsdale?

Look for a licensed contractor with completed ADU projects in Scottsdale specifically — ADUs involve local zoning, setback rules, and utility connections that general remodelers may not have handled. Verify the license, ask for an ADU-specific portfolio and references, confirm they carry liability and workers' comp insurance, and get a written fixed-price or detailed bid. Submit a request below and we'll forward it to local ADU builders serving Scottsdale for free quotes.

Do ADU builders in Scottsdale handle permits?

Most full-service ADU builders manage the permit process for you. In Scottsdale the approval process is "Three steps under Sec. 7.900, all in the Scottsdale SPUR portal (which replaced eServices on January 6, 2026): 1) online Pre-Application ($131) with a site plan, elevations and utility information, then a 30-60 minute meeting with a planner, usually scheduled within a week; 2) formal administrative application for Development Review - Staff Approval (ADU line, $131), with no public hearing, Development Review Board or use permit (ARS 9-461.18 'permitted use'); 3) building permit with construction documents through Residential Plan Review (Planning, Building, Engineering, Stormwater and Fire). The ADU gets its own address and separate electric and gas meters. One Stop Shop, 7447 E. Indian School Rd, 480-312-7725.". No ADU-specific figure is published. Residential Plan Review targets 7 business days for the administrative completeness check and 15 business days for substantive review per cycle; the pre-application meeting is usually scheduled within a week. Allow for at least one correction cycle. Confirm in writing whether permit fees, plan check (Full residential plan review in SPUR: an administrative completeness check (7 business days), then substantive review by Planning, Building, Engineering, Stormwater and Fire (15 business days); corrections restart the cycle. Fees are charged on both conditioned and covered square footage, and grading/drainage sheets are priced per sheet by landform. ESL lots add NAOS, native-plant and wash review; a lot in a special flood hazard area needs a $363 lowest-floor certificate review. State law bars a fire-sprinkler or commercial-code requirement for an ADU (ARS 9-461.18(D)).), and impact fees are included in the bid or billed separately.

How long does it take to build an ADU in Scottsdale?

Plan for the permit review (No ADU-specific figure is published. Residential Plan Review targets 7 business days for the administrative completeness check and 15 business days for substantive review per cycle; the pre-application meeting is usually scheduled within a week. Allow for at least one correction cycle. in Scottsdale) plus construction. Most detached ADUs take 4-8 months of construction after permits are issued; garage conversions and prefab units are often faster. Ask each builder for a realistic schedule and what could delay it.

Get Free ADU Builder Quotes in Scottsdale

Compare bids from experienced local Scottsdale ADU builders. Free, no obligation.

Get Free Quotes →

More Arizona ADU Rules

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.