Estimate Your ADU Cost
Get Free ADU Quotes in Your City
Tell us about your project and we'll connect you with ADU builders serving Your City. Free, no obligation — you choose who to work with.
Takes about a minute.
Up to 3 independent local ADU builders — never more, and we tell them nothing you don't submit here.
Compare quotes, verify license & insurance, hire (or don't). No spam either way.
🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.
Just browsing? Search ADU builders near you by ZIP code.
Cost Estimates by ADU Type
| ADU Type | Low Estimate | Mid Estimate | High Estimate | Per Sq Ft |
|---|---|---|---|---|
| Detached ADU (800 sq ft) | $150,000 | $225,000 | $350,000 | $190-$440 |
| Attached ADU (600 sq ft) | $100,000 | $165,000 | $250,000 | $165-$415 |
| Garage Conversion (400 sq ft) | $60,000 | $110,000 | $180,000 | $150-$450 |
| Basement ADU (500 sq ft) | $50,000 | $90,000 | $150,000 | $100-$300 |
| JADU (400 sq ft) | $30,000 | $50,000 | $80,000 | $75-$200 |
| Prefab ADU (500 sq ft) | $80,000 | $150,000 | $250,000 | $160-$500 |
Cost Breakdown
Here is where your ADU budget typically goes:
| Category | % of Total | Typical Range |
|---|---|---|
| Construction / Labor | 50-60% | $75,000-$210,000 |
| Materials | 20-30% | $30,000-$105,000 |
| Design & Architecture | 8-12% | $8,000-$35,000 |
| Permits & Fees | 5-10% | $5,000-$30,000 |
| Utility Connections | 3-8% | $5,000-$25,000 |
| Contingency | 10-15% | $15,000-$50,000 |
Hidden Costs to Watch For
- Sewer/water connection fees (can be $5,000-$15,000+)
- School impact fees (waived 750 sq ft or less of interior livable space in CA)
- Tree removal or site grading
- Upgraded electrical panel for main house
- Landscaping restoration after construction
Finance Your ADU Project
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more
Costs by City
Construction costs vary significantly by location. Here are average ADU build costs for popular California cities:
| City | Avg Build Cost | Cost/Sq Ft | Permit Fees |
|---|---|---|---|
| Los Angeles | $150,000-$350,000 | $200-$400 | $4,000-$15,000 depending on size and type (plus 10% General Plan Maintenance Surcharge on permit fees as of June 9, 2026) |
| San Francisco | $200,000-$450,000 | $300-$500 | Replace the guessed range with SF's own published figures. DBI's own estimate: 'City fees range from 6-9% of construction costs' (and architects/engineers about 10%; at least $125,000 in material and labor for a new unit). PLANNING development application fee (Fee Schedule eff. 8/29/2025, rev. 6/15/2026) — New Construction: $3,502 flat under $100k; $3,504 base + 3.855% of cost above $100,000 in the $100k-499,999 band; $19,226 + 1.230% above $500,000. Alteration/Change of Use (garage or interior conversion): $504 under $10k; $516 + 5.274% above $10,000; $3,838 + 3.524% above $50,000; $5,638 + 3.855% above $100,000. Neighborhood notification $121 + $4.25/envelope; permit-revision back check $366. DBI building permit fees are TWO separate charges under SF Building Code Table 1A-A (amended Ord. 112-26, eff. 7/12/2026) — Plan Review: $1,671 + $15.60 per $1,000 over $50,000 ($50k-200k band), $4,011 + $13.31 per $1,000 over $200,000 ($200k-500k band); Permit Issuance: $677 + $4.83 per $1,000 ($50k-200k), $1,402 + $4.21 per $1,000 ($200k-500k). Table 1A-A note 1 states these exclude Public Works, Planning, Fire, Public Health and plumbing/electrical/mechanical permit fees. Add SFUSD school facility fees (calculated by DBI staff), SFPUC and Public Works right-of-way permits. OUR WORKED EXAMPLE (label as our calculation, not a published number): a $300,000 detached ADU = Planning $11,214 + DBI plan review $5,342 + DBI issuance $1,823, roughly $18,400 before trade permits and school fees — about 6% of construction cost, consistent with DBI's 6-9%. FEE WAIVER: building permit fees are waived for permits granting legal status to dwelling units built without permits, for activities prior to 1/1/2020 (Board Ord. 150571). |
| San Diego | $120,000-$300,000 | $180-$350 | $3,500-$12,000 |
| San Jose | $180,000-$400,000 | $250-$450 | City building permit fees, FY 2026-27 Building and Structure Permits Fee Schedule, effective August 10, 2026. ADU 0-750 sq ft: permit issuance $422, plan review $1,137, inspection $1,732 (total $3,291). ADU 751-1,200 sq ft: permit issuance $633, plan review $1,950, inspection $2,520 (total $5,103). Permit issuance includes addressing assignment for the unit; inspection includes the meter release inspection. Modular fees are 10% lower for plan review and 20% lower for inspections. Separately, an optional preliminary virtual meeting with a planner is billed at the Planning Division's hourly rate of $398/hour with a 30-minute minimum (i.e. $199). These are city permit fees only and exclude school/parkland impact fees, construction taxes, and construction cost. |
| Sacramento | $100,000-$250,000 | $150-$300 | Replace the guessed range with the city's OWN published figures. Form CDD-0419, 'Accessory Dwelling Unit (ADU) Fee Estimate (New Construction)', revised 07-12-2026, at a $170.80/sq ft valuation: 749 sq ft = $5,271.90 total; 750 sq ft = $10,624.40; 1,200 sq ft = $14,842.50. Representative line items at 1,200 sq ft: building permit $1,790.36, building plan review $751.95, fire dept administrative $176, fire inspection $294 ($0.11/sq ft, $294 minimum), fire plan review $260, planning inspection $526, planning review $263, public works review $205 deposit + hourly, utilities $205 deposit + hourly, construction excise tax $945.60, general plan fee $533 ($2.60 per $1,000 valuation), residential construction tax $315, technology fee $254.23. NOT included and additional: school district impact fees (calculated and collected by the district, form CDD-0226), Regional Sanitation and Sewer Development fees (the form says 'Check with County'), and possible sewer/water tap, housing and project-area impact fees. The optional ADU Zoning Review is now $0 (the $117 fee was waived). An optional building permit fee estimate service costs $164 (form CDD-0278). Additional review time bills at $216/hr building, $263/hr planning. The city's own caveat: 'This is only an estimate. The actual fees can vary based on project scope, location, fee changes, etc.' |
| Oakland | $160,000-$380,000 | $250-$420 | Published Oakland figures, not a guess. PLANNING/ZONING PERMIT (Design Review Exemption - Secondary Units/ADU), FY2025-26 grand totals including the 7.2% General Plan Update and 12.70% Technology/Records surcharges: Category I, II & III $593.95 (base report fee $491.62); Category IV $892.54 (base $738.77); Amnesty Program $1,779.79 (base $1,473.16). PERMIT APPLICATION INTAKE: $201.49 at the counter, $112.83 online. BUILDING PERMIT (Master Fee Schedule effective 8/28/2025, R3 residential): new construction $10.60 per $1,000 of construction valuation for plan review plus $8.00 per $1,000 for inspection (each with a $335.81 minimum); repairs/additions/alterations $17.08 plus $26.11 per $1,000. The City's own summary guidance is 'Building Permit Fees: Usually 4-6% of project value.' Plus a 12.70% Records Management & Technology Enhancement fee on all Building Services fees. ZONING INSPECTION for a building permit up to $200,000 valuation: $537.29. NEW SEWER LATERAL CONNECTION (the schedule expressly includes ADUs): $1,867.40. OUSD SCHOOL FEE collected by Planning & Building on the district's behalf: $5.17 per sq ft residential. Note: the widely circulated City 'Secondary Units' handout quoting a $464.89 planning permit fee and 5-6 week building permits was last updated 10/10/2019 and is obsolete - do not cite it. |
| Long Beach | $120,000-$280,000 | $180-$330 | Replace the guessed range with the city's published figures. Long Beach's own guidance: 'For most construction projects, you could expect to spend about 2% of your building costs on plan checks, permits, inspections and other agency fees.' Published components (Building Permit & Plan Check Fees, effective 5/20/2026): Building Permit fee by valuation — $1,264 for the first $100,000 plus $6 per additional $1,000 in the $100,001-$1,000,000 band; Combination Building Permit (Group R-3, includes electrical, plumbing, mechanical) = 150% of the Building Permit fee, minimum $164; Combination Plan Check = 85% of the Building Permit fee, minimum $154; Zoning Plan Check = 0.5% of project valuation for valuations up to $750,000, minimum $310, capped at 95% of the building standard plan check fee; NPDES permit = $2 per $1,000 of valuation with plan check at 75% of that; Expedited plan check = 2x standard. Add a $115.00 processing fee to EACH plan check and permit application, plus a 6% Technology Surcharge and a 6% General Plan Surcharge on all applicable fees. Worked from those published formulas, a $150,000-valuation ADU lands near $5,800 in permit and plan-check fees before impact fees — I am labelling that figure as DERIVED from the published schedule, not published by the city. |
| Fresno | $80,000-$200,000 | $120-$250 | City-published figures for a pre-approved-plan ADU: Plans FREE, Plan Check FREE, Building Permit 'Up to $2,400', School Impact Fee varies by sq ft (school fee is the district's, not the city's). Underlying Master Fee Schedule rates (fees effective 07/01/2025): R-3 One or Two-Family Production/Repeat/Standard Plan Infill = $34.89 plan check base + $1,279.35 inspection base at the 1,000 sq ft threshold. A custom-designed ADU instead uses R-3 (Custom): $580.69 plan check + $1,884.77 inspection at the same threshold. A CBSC surcharge of $1-$4 by valuation also applies. Do not publish a single range without splitting standard-plan vs custom. |
| Santa Ana | $130,000-$300,000 | $200-$360 | REPLACE THE GUESS WITH PUBLISHED FIGURES. Planning Division FY 2026-2027 Fee Schedule: Accessory Dwelling Unit Review $1,940.00; ADU Over-the-Counter Review $594.00; ADU Pre-Approved Plan Review $524.00. Certain applications also carry a 7% technology fee per transaction, and from July 1, 2026 a 2.5% credit/debit card processing fee. These are PLANNING fees only — building permit fees are additional and the city does not publish them ('Building permit fees vary according to the scope of work'; Permit Counter (714) 647-5800). |
| Anaheim | $130,000-$290,000 | $195-$350 | $3,500-$12,000 |
Get an Accurate Quote
Online calculators provide estimates. For an accurate quote, connect with local ADU contractors who can assess your specific property.
Get Free Quotes →