ADU Rules in Atlanta, Georgia

Complete guide to building an Accessory Dwelling Unit in Atlanta — zoning, setbacks, permits, costs, and more.

Max Size: 750 sq ft or less (definition, Sec. 16-29.001(12)(a)7). Two further caps apply to any accessory building in R-1 through R-5 (Sec. 16-28.004(3)): gross floor area no more than 30% of the main house's floor area, counting garage and unconditioned space in the ADU, and footprint no more than 25% of the rear yard. A 2,000 sq ft house therefore allows a 600 sq ft ADU, not 750. Setbacks: R-5: 4 ft (Sec. 16-07.008(3), ADU exception). R-4 and R-4A: 15 ft, the district rear yard with no ADU exception (Sec. 16-06.008(3), 16-06A.008(3)); a Board of Zoning Adjustment variance ($100 filing fee) is the only way to go closer. No Parking Required Verified: 2026-09-20
ADU Score: 6/10
Moderately friendly · how we score

Are ADUs allowed in Atlanta, GA? [1][2][3][4][5][6][7]

Yes. Atlanta allows ADUs on most residential lots. A detached unit can be up to 750 sq ft, set 4 ft back from the rear line. No extra parking is required. Owner-occupancy is not required, so the unit can be rented out. A building permit is required and applications are reviewed administratively, without a public hearing.

Maximum size750 sq ft or less (definition, Sec. 16-29.001(12)(a)7). Two further caps apply to any accessory building in R-1 through R-5 (Sec. 16-28.004(3)): gross floor area no more than 30% of the main house's floor area, counting garage and unconditioned space in the ADU, and footprint no more than 25% of the rear yard. A 2,000 sq ft house therefore allows a 600 sq ft ADU, not 750.
SetbacksRear R-5: 4 ft (Sec. 16-07.008(3), ADU exception). R-4 and R-4A: 15 ft, the district rear yard with no ADU exception (Sec. 16-06.008(3), 16-06A.008(3)); a Board of Zoning Adjustment variance ($100 filing fee) is the only way to go closer. · Side R-5: 4 ft (Sec. 16-07.008(2), ADU exception). R-4 and R-4A: 7 ft (Sec. 16-06.008(2), 16-06A.008(2)). On a corner lot the side-street yard also applies.
ParkingNo parking required for an ADU in R-4, R-4A or R-5 (Sec. 16-06.010(6), 16-06A.010(6), 16-07.010(7); Ord. 18-O-1581). The house keeps its one required space. R-5 still lists an ADU on a parcel with no curb cut or no off-street parking as a special exception (Sec. 16-07.005(3)(c)); ask the Office of Zoning whether it applies to a lot with no driveway.
Owner-occupancyNot required by the zoning ordinance for long-term rental: nothing in Sec. 16-06.004, 16-06A.004 or 16-07.004 requires the owner to live on the lot, so both the house and the ADU may be rented. Short-term rental of an ADU is allowed only if the property owner lives onsite (Sec. 16-29.001(88)).

Do I need a permit to build an ADU in Atlanta? [8][9][10][11][12]

Yes. Every ADU in Atlanta needs a building permit. Applications are handled administratively — no public hearing.

Permit fees$1,700-$2,750 for a $150,000-$300,000 ADU: building permit $7 per $1,000 of construction cost (minimum $150) plus a $25 technology fee, three trade permits at $150 plus $25 each, and a $100 certificate of occupancy (Department of City Planning fee tables, checked Sept 2026).
Typical timelineNot published by the city. The Office of Buildings screens a submittal for acceptance within 48 business hours and routes it for review only after the invoiced deposit is paid; local ADU builders report about two months of plan review with several comment rounds (industry figure, Feb 2026).

Three things to know before you build in Atlanta

  • Size math first: 750 sq ft is the ceiling, but Sec. 16-28.004(3) also caps any accessory building at 30% of the house's floor area with every square foot of the ADU counted, conditioned or not. House 1,800 sq ft: ADU 540 sq ft. House 2,500 sq ft or larger: the full 750
  • R-5 is the easy district: 4 ft side and rear setbacks and a 55% lot-coverage cap (16-07.008). In R-4 and R-4A the 15 ft rear and 7 ft side yards apply to the ADU, so a full-size unit needs roughly 40 ft of depth behind the house; a BZA variance costs $100 to file and is decided at a public hearing
  • Worked permit fee: a $150,000 project is $1,050 building permit + $25 technology fee + about $525 in trade permits + $100 certificate of occupancy, about $1,700; $250,000 about $2,400; $300,000 about $2,750. The $4,591 impact fee (or $3,121 near a MARTA station) comes on top

Last verified 2026-09-20 against Atlanta planning code. How we verify

Yes: Atlanta allows one detached accessory dwelling unit by right on a lot with a single-family house in the R-4, R-4A and R-5 districts (Zoning Ordinance Sec. 16-06.004(12), 16-06A.004(11), 16-07.004(12)) and in several SPI and historic districts; R-1 through R-3 and R-4B do not list ADUs. The unit is capped at 750 sq ft and 20 ft and, like any accessory building, at 30% of the main house's floor area (Sec. 16-29.001(12)(a)7, 16-28.004(3)); attached or basement ADUs are not a permitted type. Setbacks are 4 ft side and rear in R-5 but 7 ft side and 15 ft rear in R-4 and R-4A, no parking is required, and no owner-occupancy rule applies to long-term rental. You need an Office of Buildings building permit filed through the Accela portal: roughly $1,700-$2,750 in permit fees for a $150,000-$300,000 build plus a $4,591 development impact fee (transportation share halved near a MARTA station), with no published review time.

Zoning & Size Requirements [1][2][3][4][5][6][7]

Yes — Atlanta allows ADUs. A detached ADU can typically be up to 750 sq ft under current Georgia and Atlanta zoning rules.

See what this means for your lot — ask Atlanta ADU builders for a quote →

Allowed ZonesBy right as an accessory use in R-4 (Sec. 16-06.004(12)), R-4A (16-06A.004(11)) and R-5 (16-07.004(12)), the districts covering most of the city's single-family lots, plus certain SPI and historic districts under their own chapters. Not listed in R-1, R-2, R-2A, R-2B, R-3, R-3A or R-4B (16-06B.004), where a second unit needs a rezoning. Check the parcel's district on the city's GIS property search first.
Max Size (Detached)750 sq ft or less (definition, Sec. 16-29.001(12)(a)7). Two further caps apply to any accessory building in R-1 through R-5 (Sec. 16-28.004(3)): gross floor area no more than 30% of the main house's floor area, counting garage and unconditioned space in the ADU, and footprint no more than 25% of the rear yard. A 2,000 sq ft house therefore allows a 600 sq ft ADU, not 750.
Max Size (Attached)Not a permitted ADU type: the code defines an accessory dwelling as a detached unit (Sec. 16-29.001(12)(a)7). A basement or garage apartment inside the house is a second dwelling unit, allowed only where two-family use is permitted (R-5). The 2021 City Design proposal to allow attached ADUs up to 1,000 sq ft was never adopted.
Max Size (JADU)No junior ADU category exists in Atlanta's zoning ordinance.
Max Height20 ft for accessory buildings in R-1 through R-5 (Sec. 16-28.004(3)); Sec. 16-28.022 lists excluded roof elements. Enough for one story or a low loft, not a full two-story unit.
Max UnitsOne ADU: the total number of dwelling units on the parcel, ADU included, may not exceed two (Sec. 16-06.004(12), 16-06A.004(11), 16-07.004(12)). An R-5 lot that already has a duplex cannot add an ADU. The ADU cannot be subdivided or sold apart from the house (16-07.007(3)).

Setback Requirements [1][2][3][4][5][6][7]

Atlanta requires a rear setback of about 4 ft for a detached ADU, and no additional parking is required. Owner-occupancy is not required — you can rent it out without living on the property.

Rear SetbackR-5: 4 ft (Sec. 16-07.008(3), ADU exception). R-4 and R-4A: 15 ft, the district rear yard with no ADU exception (Sec. 16-06.008(3), 16-06A.008(3)); a Board of Zoning Adjustment variance ($100 filing fee) is the only way to go closer.
Side SetbackR-5: 4 ft (Sec. 16-07.008(2), ADU exception). R-4 and R-4A: 7 ft (Sec. 16-06.008(2), 16-06A.008(2)). On a corner lot the side-street yard also applies.
Front SetbackThe ADU must sit to the side or rear of the house, inside the buildable area, and may not project past the house's front wall (Sec. 16-06.008(4), 16-06A.008(4), 16-07.008(4)). District front yards are 35 ft in R-4 and 30 ft in R-4A and R-5.
Parking RequiredNo parking required for an ADU in R-4, R-4A or R-5 (Sec. 16-06.010(6), 16-06A.010(6), 16-07.010(7); Ord. 18-O-1581). The house keeps its one required space. R-5 still lists an ADU on a parcel with no curb cut or no off-street parking as a special exception (Sec. 16-07.005(3)(c)); ask the Office of Zoning whether it applies to a lot with no driveway.
Owner OccupancyNot required by the zoning ordinance for long-term rental: nothing in Sec. 16-06.004, 16-06A.004 or 16-07.004 requires the owner to live on the lot, so both the house and the ADU may be rented. Short-term rental of an ADU is allowed only if the property owner lives onsite (Sec. 16-29.001(88)).
Min Lot SizeNo ADU-specific minimum. District minimums: R-4 9,000 sq ft and 70 ft frontage (Sec. 16-06.007), R-4A 7,500 sq ft and 50 ft (16-06A.007), R-5 7,500 sq ft and 50 ft (16-07.007). Smaller lots of record may still hold a single-family house, and R-5 sizes ADUs on such lots through its floor-area rule (16-07.008(5)); ADU floor area counts toward the lot's 0.50 FAR.

Permit Process & Fees [8][9][10][11][12]

An ADU permit in Atlanta goes through a standard permit review. Review time: not published by the city. The Office of Buildings screens a submittal for acceptance within 48 business hours and routes it for review only after the invoiced deposit is paid; local ADU builders report about two months of plan review with several comment rounds (industry figure, Feb 2026). Fees range from $1,700-$2,750 for a $150,000-$300,000 ADU: building permit $7 per $1,000 of construction cost (minimum $150) plus a $25 technology fee, three trade permits at $150 plus $25 each, and a $100 certificate of occupancy (Department of City Planning fee tables, checked Sept 2026).

Approval ProcessBuilding permit from the Department of City Planning, Office of Buildings (55 Trinity Ave SW, Suite 3900), filed online through the Accela Citizen Access portal (aca-prod.accela.com/ATLANTA_GA) with the Building Permit Application Packet, site plan, construction drawings and a sworn cost-of-construction form. Zoning review, arborist review under the Tree Protection Ordinance and site development review run inside the permit; historic and SPI districts add a Certificate of Appropriateness or Special Administrative Permit first.
Review TimelineNot published by the city. The Office of Buildings screens a submittal for acceptance within 48 business hours and routes it for review only after the invoiced deposit is paid; local ADU builders report about two months of plan review with several comment rounds (industry figure, Feb 2026).
Permit Fees$1,700-$2,750 for a $150,000-$300,000 ADU: building permit $7 per $1,000 of construction cost (minimum $150) plus a $25 technology fee, three trade permits at $150 plus $25 each, and a $100 certificate of occupancy (Department of City Planning fee tables, checked Sept 2026).
Impact FeesDevelopment impact fee, assessed at building permit (Code Part 19, Ch. 1; Ord. 21-O-0096, full Phase 3 rate since Sept 1, 2023): the smallest residential tier, a dwelling under 1,500 sq ft, is $4,591 (transportation $2,940, parks $1,129, fire $260, police $262); the transportation share is halved within 1,000 walking ft of a MARTA station, giving $3,121. The ordinance has no ADU line or exemption, so confirm the classification with COAImpactFees@atlantaga.gov.
Plan CheckIncluded in the building permit review; no separate plan-check fee or published turnaround. The permit fee is set on the higher of your sworn cost estimate or the reviewer's estimate from the city's standard construction-cost table.
Pre-Approved PlansNone. Neither the City of Atlanta nor the State of Georgia publishes pre-approved ADU plans; every ADU goes through full plan review.

Get Free ADU Quotes in Atlanta

Tell us about your project and we'll pass it to ADU builders serving Atlanta. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

Construction Costs [13][14][15]

Building an ADU in Atlanta typically costs $120,000-$240,000 ($140-$280 per sq ft); a garage conversion runs $60,000-$140,000.

See what this means for your lot — ask Atlanta ADU builders for a quote →

Average Build Cost$120,000-$240,000
Cost per Sq Ft$140-$280
Garage Conversion$60,000-$140,000
Prefab ADU (Installed)$85,000-$190,000

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Rental Income Potential [16][17][18]

A 2-bedroom ADU in Atlanta rents for around $1,650-$2,300/mo, an estimated 6-9% gross yield on a $150,000-$250,000 build at $1,300-$1,750/mo; both the house and the ADU may be rented long-term.

Avg Rent (1 Bedroom)$1,300-$1,750/mo
Avg Rent (2 Bedroom)$1,650-$2,300/mo
Short-Term RentalYes with conditions: an ADU may be a short-term rental only if the property owner lives onsite (Sec.
Est. Annual ROI6-9% gross yield on a $150,000-$250,000 build at $1,300-$1,750/mo; both the house and the ADU may be rented long-term

Explore Prefab ADU Options

Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Recent Law Changes

What's Changed Recently

  • Verified Sept 20, 2026 against the codified Zoning Ordinance (Part 16, current through Ord. 2025-43 of Dec 10, 2025): the ADU rules are unchanged since Ord. 18-O-1581 took effect Jan 31, 2019 (750 sq ft, 20 ft, no parking, R-4/R-4A/R-5 only; R-5 ADUs date from Ord. 16-O-1548, May 1, 2017)
  • Not adopted: the Department of City Planning's 'Create more flexible ADU options' package (attached ADUs, 1,000 sq ft, 24 ft height, 4 ft setbacks in R-4/R-4A, ADUs in R-4B, for-sale ADUs, three units in R-5) remains a proposal; R-4B still lists no ADU (Sec. 16-06B.004). Earlier versions of this page presented it as pending
  • ATL Zoning 2.0 (full rewrite of the 1982 code): Draft V2 released Dec 19, 2025 with comments to April 8, 2026; Draft V3 is 'underway' per atlzoning.com as of Sept 20, 2026 and no adoption vote has been held. Until a new ordinance is adopted, the rules above govern
  • Development impact fees reached the full Phase 3 rate on Sept 1, 2023 ($4,591 for a dwelling under 1,500 sq ft, $3,121 within 1,000 walking ft of a MARTA station); no ADU exemption was added
  • From Sept 14, 2026 the city passes credit-card processing fees on Accela permit payments to the customer; eCheck, ACH and personal check remain fee-free
  • Georgia: no statewide ADU law is in force. HB 1166 (2026 session), which would have required local governments to allow ADUs of 400 sq ft or less, advanced in a House committee but no enactment could be verified for this update; Atlanta's local rules govern

Tips for Building an ADU in Atlanta

  • Size math first: 750 sq ft is the ceiling, but Sec. 16-28.004(3) also caps any accessory building at 30% of the house's floor area with every square foot of the ADU counted, conditioned or not. House 1,800 sq ft: ADU 540 sq ft. House 2,500 sq ft or larger: the full 750
  • R-5 is the easy district: 4 ft side and rear setbacks and a 55% lot-coverage cap (16-07.008). In R-4 and R-4A the 15 ft rear and 7 ft side yards apply to the ADU, so a full-size unit needs roughly 40 ft of depth behind the house; a BZA variance costs $100 to file and is decided at a public hearing
  • Worked permit fee: a $150,000 project is $1,050 building permit + $25 technology fee + about $525 in trade permits + $100 certificate of occupancy, about $1,700; $250,000 about $2,400; $300,000 about $2,750. The $4,591 impact fee (or $3,121 near a MARTA station) comes on top
  • Trees: the Tree Protection Ordinance applies to the ADU footprint; arborist review runs inside the building permit, and removing or impacting protected trees adds recompense fees, so set the footprint around the tree survey
  • Historic or SPI district: detached ADUs are allowed in several, but a Certificate of Appropriateness ($10-$200) or Special Administrative Permit ($500) must be approved before the building permit
  • Renting: both the house and the ADU may be long-term rentals with no owner-occupancy rule; short-term rental of the ADU requires you to live onsite and hold a city STR license (Ord. 20-O-1656)
  • Cost basis: the build-cost ranges are national industry figures last checked Feb 2026, not Atlanta bids; local design-build firms quote turnkey detached units on 8-10 month timelines (4-5 months of survey, feasibility and permitting), so get three local bids and budget time as well as money
  • HOA covenants can still bar an ADU where the zoning allows one; check deed restrictions before paying for plans
  • Cost basis (2026-09-20 re-verification): short term allowed: Yes with conditions: an ADU may be a short-term rental only if the property owner lives onsite (Sec. 16-29.001(88)), and the host needs a City of Atlanta short-term rental license (Ordinance 20-O-1656, in force since March 1, 2022, renewed yearly) covering a primary residence plus one additional unit.

ADU Builders in Atlanta

Looking for an ADU builder in Atlanta? ADU projects need a contractor experienced with local zoning, the permit process, and utility connections — not every general contractor has built one. We match Atlanta homeowners with experienced local ADU contractors who provide free, no-obligation quotes. Getting at least three bids typically saves 20-40% on the same scope.

Sources & References

All data on this page is sourced from official government records and verified market data. View our full methodology.

  1. Atlanta Code of Ordinances, Part 16 Zoning, Chapter 6 R-4: Sec. 16-06.004(12) ADUs, 16-06.007 lots, 16-06.008 yards, 16-06.010(6) parking Municipal Code — Accessed 2026-09-20
  2. Atlanta Zoning Ordinance Chapter 6A R-4A (Sec. 16-06A.004(11), .007, .008, .010(6)) and Chapter 6B R-4B (Sec. 16-06B.004, no ADU) Municipal Code — Accessed 2026-09-20
  3. Atlanta Zoning Ordinance Chapter 7 R-5: Sec. 16-07.004(12), 16-07.005(3)(c), 16-07.007, 16-07.008(2)-(5), 16-07.010(7) Municipal Code — Accessed 2026-09-20
  4. Atlanta Zoning Ordinance Sec. 16-28.004(3) accessory buildings (20 ft, 30% of main structure, 25% of rear yard) and Sec. 16-29.001(12)(a)7 ADU definition (750 sq ft), (88) short-term rental Municipal Code — Accessed 2026-09-20
  5. Atlanta Department of City Planning, Ordinances & Regulations (official link to the Municode zoning code) Planning Department — Accessed 2026-09-20
  6. Atlanta Department of City Planning, City Design Housing: 'Create more flexible ADU options' (proposal, not adopted) Planning Department — Accessed 2026-09-20
  7. ATL Zoning 2.0 (Department of City Planning): Draft V3 underway, prior drafts Planning Department — Accessed 2026-09-20
  8. Atlanta DCP, Getting started with Zoning, Development and Permitting Services: fee tables (building permit $7 per $1,000, $25 technology fee, trade permits, CO, BZA and SAP fees), permit exemptions, Sept 14, 2026 card-fee notice Planning Department — Accessed 2026-09-20
  9. Atlanta Office of Buildings, Building Permit Application Packet (v. 10.24): Accela submittal, 48-business-hour acceptance screen, deposit, cost-of-construction affidavit Planning Department — Accessed 2026-09-20
  10. Atlanta DCP, Development Impact Fee Program page Planning Department — Accessed 2026-09-20
  11. Atlanta Development Impact Fee Updated Fee Schedule (Phase 1-3, effective Sept 1, 2021/2022/2023) Planning Department — Accessed 2026-09-20
  12. Atlanta Code Part 19, Ch. 1 Development Impact Fees (Ord. 21-O-0096): Sec. 19-1008 assessment, 19-1009 MARTA reduction, 19-1016 exemptions Municipal Code — Accessed 2026-09-20
  13. Angi, ADU Construction Cost Data (national) Market Data — Accessed 2026-02-24
  14. Angi, Local ADU Contractor Costs (national) Market Data — Accessed 2026-02-24
  15. Atlanta ADU zoning guide and FAQ by a local design-build firm (updated Feb 2026): permitting about two months, 8-10 month turnkey timeline industry — Accessed 2026-09-20
  16. Zillow Rental Manager, Market Rent Data Market Data — Accessed 2026-02-24
  17. HUD Fair Market Rents Government Data — Accessed 2026-02-24
  18. Atlanta DCP, Short-Term Rental page (Ordinance 20-O-1656, effective March 1, 2022; license, primary residence plus one unit) Planning Department — Accessed 2026-09-20
  19. City of Atlanta Department of City Planning Planning Department — Accessed 2026-09-20

Frequently Asked Questions

Can I build an ADU in Atlanta?

Yes. ADUs are allowed in By right as an accessory use in R-4 (Sec. 16-06.004(12)), R-4A (16-06A.004(11)) and R-5 (16-07.004(12)), the districts covering most of the city's single-family lots, plus certain SPI and historic districts under their own chapters. Not listed in R-1, R-2, R-2A, R-2B, R-3, R-3A or R-4B (16-06B.004), where a second unit needs a rezoning. Check the parcel's district on the city's GIS property search first. in Atlanta. The maximum size for a detached ADU is 750 sq ft or less (definition, Sec. 16-29.001(12)(a)7). Two further caps apply to any accessory building in R-1 through R-5 (Sec. 16-28.004(3)): gross floor area no more than 30% of the main house's floor area, counting garage and unconditioned space in the ADU, and footprint no more than 25% of the rear yard. A 2,000 sq ft house therefore allows a 600 sq ft ADU, not 750.. Owner-occupancy is not required, so you can rent out the ADU.

How much does an ADU cost in Atlanta?

ADU construction in Atlanta typically costs $120,000-$240,000. Garage conversions run $60,000-$140,000, and prefab ADUs cost $85,000-$190,000.

How much can I rent an ADU for in Atlanta?

Average ADU rents in Atlanta are $1,300-$1,750/mo for a 1-bedroom and $1,650-$2,300/mo for a 2-bedroom unit.

Do I need parking for an ADU in Atlanta?

No parking required for an ADU in R-4, R-4A or R-5 (Sec. 16-06.010(6), 16-06A.010(6), 16-07.010(7); Ord. 18-O-1581). The house keeps its one required space. R-5 still lists an ADU on a parcel with no curb cut or no off-street parking as a special exception (Sec. 16-07.005(3)(c)); ask the Office of Zoning whether it applies to a lot with no driveway.. Check with Atlanta planning department for the latest Georgia ADU parking rules, as many states have relaxed requirements in recent years.

How long does it take to get an ADU permit in Atlanta?

Atlanta does not publish a standard ADU review timeline. The Office of Buildings screens a submittal for acceptance within 48 business hours and routes it for review only after the invoiced deposit is paid; local ADU builders report about two months of plan review with several comment rounds (industry figure, Feb 2026). Fees range from $1,700-$2,750 for a $150,000-$300,000 ADU: building permit $7 per $1,000 of construction cost (minimum $150) plus a $25 technology fee, three trade permits at $150 plus $25 each, and a $100 certificate of occupancy (Department of City Planning fee tables, checked Sept 2026).

Ready to Build in Atlanta?

Get free, no-obligation quotes from top-rated ADU contractors in Atlanta.

Get Free Quotes →

Build ADUs in Atlanta?

Homeowners read this page while planning, then ask us to connect them with a local builder. We pass those requests to builders who cover Atlanta — a flat fee only on the leads you accept, no subscription, and you contract directly with the homeowner.

See who's waiting in Georgia →

ADU Guides for Atlanta Homeowners

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.