Fontana allows ADUs and JADUs on lots with a single-family or multifamily home under Fontana Municipal Code Sec. 30-467, amended by Ordinance No. 1966 (April 2025) and Ordinance No. 1983 (February 2026) to match state law. A detached ADU can be up to 1,200 sq ft (Class 2, locally regulated) or 800 sq ft with only the state minimum standards (Class 1); an attached ADU up to 50% of the house or 850 sq ft (studio/1-bed) / 1,000 sq ft (2+ beds), whichever is larger; a JADU up to 500 sq ft. Side and rear setbacks are 4 ft, the front setback 18 ft for new construction, and height 16 ft (18 ft near transit). The city publishes three pre-approved detached plans (462, 738 and 1,143 sq ft), applications go through the Build Fontana portal with a first plan check of about 3-4 weeks, and city impact fees are waived on units of 750 sq ft or less.
Zoning & Size Requirements [1][2][3][4][5][6]
Yes — Fontana allows ADUs. A detached ADU can typically be up to 1,200 sq ft under current California and Fontana zoning rules.
See what this means for your lot — ask Fontana ADU builders for a quote →
| Allowed Zones | Any lot zoned for residential use with an existing or proposed single-family or multifamily dwelling, including the R-1, R-2, R-3 and residential specific-plan and form-based-code areas (FMC Sec. 30-467; Gov. Code 66314). Eligibility depends on the property's zoning; check it on the city's Zoning and General Plan interactive map or call Planning at (909) 350-6718. |
| Max Size (Detached) | 1,200 sq ft for a Class 2 (locally regulated) detached ADU; 800 sq ft for a Class 1 detached ADU, which gets only the state minimum standards (no design review, no parking). On a multifamily lot each detached ADU is capped at 850 sq ft, or 1,000 sq ft with more than one bedroom (ADU Information Sheet, March 2026; Sec. 30-467). |
| Max Size (Attached) | 50% of the primary dwelling's floor area or 850 sq ft (studio/1-bedroom) / 1,000 sq ft (2+ bedrooms), whichever is larger. Conversions of existing living space or an existing accessory building have no size cap (ADU Information Sheet, March 2026). |
| Max Size (JADU) | 500 sq ft, created inside the existing or proposed single-family home or its attached garage; needs its own kitchen and either its own bathroom or shared use of the house bathroom; one JADU per lot (Sec. 30-467; Gov. Code 66333). |
| Max Height | 16 ft for a detached ADU; 18 ft (city sheet: 16-18 ft for Class 2) where the lot is within 1/2 mile walking distance of a major transit stop or holds a multistory multifamily building, plus up to 2 ft for a roof pitch matching the house; an attached ADU may go to 25 ft or the zone's height limit, whichever is lower (Gov. Code 66321; Sec. 30-467). A Class 2 detached unit must be architecturally compatible with the main house. |
| Max Units | Single-family lot: up to 1 JADU + 1 Class 1 detached ADU (800 sq ft) + 1 conversion ADU (ADU Information Sheet, March 2026). Multifamily lot: converted ADUs in non-livable space up to 25% of the existing units (at least 1), plus up to 8 detached ADUs on a lot with existing multifamily (not more than the number of existing units), or 2 detached ADUs built with a new multifamily building (Ordinance No. 1966, 2025; Gov. Code 66323). |
Setback Requirements [1][2][3][4][5][6]
Fontana requires a rear setback of about 4 ft for a detached ADU, and parking requirements vary by unit size or location. Owner-occupancy is not required — you can rent it out without living on the property.
| Rear Setback | 4 ft minimum for new construction (Sec. 30-467; ADU Information Sheet, March 2026). Conversions of existing structures and their same-footprint rebuilds keep the existing setback (Gov. Code 66314). |
| Side Setback | 4 ft minimum for new construction, attached or detached (Sec. 30-467; ADU Information Sheet, March 2026). |
| Front Setback | 18 ft for a new attached or detached ADU (ADU Information Sheet, March 2026). State law still guarantees room for an 800 sq ft unit: the front setback cannot be used to block a Class 1 ADU that fits nowhere else on the lot (Gov. Code 66321). |
| Parking Required | None for a JADU, a conversion ADU or a Class 1 detached ADU (800 sq ft or less). One space for an attached ADU or a Class 2 detached ADU, waived under the state exemptions in Sec. 30-467 (within 1/2 mile walking distance of transit, historic district, no on-street permit parking, car share within a block). Since Ordinance No. 1966 (2025) the city does not require replacement parking when a garage or carport becomes an ADU (Gov. Code 66322). |
| Owner Occupancy | Not required for an ADU. For a JADU, owner occupancy of the property is required only if the JADU shares a bathroom with the main house; a JADU with its own bathroom is exempt (ADU Information Sheet, March 2026, implementing AB 1154, Gov. Code 66333, effective Jan. 1, 2026). |
| Min Lot Size | No minimum lot size for an ADU or JADU; the state bars local minimum-lot-size rules for ADUs (Gov. Code 66314). Any lot with an existing or proposed home qualifies. |
Permit Process & Fees [7][8][9][10][11][12]
An ADU permit in Fontana goes through a ministerial, by-right review. Typical timeline: Building & Safety's published plan-check times: first review about 3-4 weeks, each recheck about 2 weeks. State law requires a decision within 60 days of a complete application and deems it approved if the city misses the deadline (Gov. Code 66317, SB 543, Jan. 2026). Permit fees: No flat ADU fee: building permit and plan check are valuation-based per the Comprehensive Fee Schedule (Res. 2024-054, 9/1/2024), plus Planning plan check $191, Engineering $120 and Fire $90 per submittal and small state/archive add-ons. Get a quote from Building & Safety, (909) 350-7640.
| Approval Process | Ministerial (no hearing): register and submit plans electronically through the Build Fontana portal, or on paper at the Building & Safety counter, 8353 Sierra Ave. Building & Safety routes the set to Planning, Fire and Engineering; Planning checks Sec. 30-467 standards and Class 2 design compatibility. Use one of the three pre-approved plans (462, 738 or 1,143 sq ft) or your own drawings; a site plan and permit are still required with a standard plan. |
| Review Timeline | Building & Safety's published plan-check times: first review about 3-4 weeks, each recheck about 2 weeks. State law requires a decision within 60 days of a complete application and deems it approved if the city misses the deadline (Gov. Code 66317, SB 543, Jan. 2026). |
| Permit Fees | No flat ADU fee: building permit and plan check are valuation-based per the Comprehensive Fee Schedule (Res. 2024-054, 9/1/2024), plus Planning plan check $191, Engineering $120 and Fire $90 per submittal and small state/archive add-ons. Get a quote from Building & Safety, (909) 350-7640. |
| Impact Fees | None on an ADU of 750 sq ft or less (Gov. Code 66311.5(c)(1)). Above 750 sq ft, the city's per-unit single-family development fees (about $20,600 in Planning fees plus $8,620 sewer expansion and $1,023 sewer connection per unit on the 10/2024 sheet) are charged in proportion to the ADU's share of the main house's floor area. IEUA sewer and school-district fees are billed separately. |
| Plan Check | First review about 3-4 weeks; rechecks about 2 weeks after corrected plans are resubmitted; over-the-counter issuance only for work that needs no plan check. Status is tracked in the Build Fontana portal or at (909) 350-7640. Fire District reviews (NFPA 13D sprinklers) run separately with a 15-working-day goal. |
| Pre-Approved Plans | Yes. Fontana's Standard ADU Plans program (AB 1332, Gov. Code 65852.27) posts three pre-approved detached plans: 462 sq ft (1 bed/1 bath), 738 sq ft (2 bed/2 bath) and 1,143 sq ft (3 bed/2 bath). The plan sets are free to download from the city site; you still submit a site-specific plan and pay permit fees. |
Get Free ADU Quotes in Fontana
Tell us about your project and we'll pass it to ADU builders serving Fontana. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.
Takes about a minute.
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
Compare quotes, verify license & insurance, hire (or don't). No spam either way.
🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.
Just browsing? Search ADU builders near you by ZIP code.
Construction Costs [13][14][15][16]
Building an ADU in Fontana typically costs $175,000-$320,000 ($180-$300 per sq ft); a garage conversion runs $75,000-$150,000.
See what this means for your lot — ask Fontana ADU builders for a quote →
| Average Build Cost | $175,000-$320,000 |
| Cost per Sq Ft | $180-$300 |
| Garage Conversion | $75,000-$150,000 |
| Prefab ADU (Installed) | $120,000-$250,000 |
Finance Your ADU Project
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more
Rental Income Potential [17][18][19]
A 2-bedroom ADU in Fontana rents for around $2,100-$2,300/mo, an estimated 7-15% gross rental yield on a $175,000-$320,000 detached build at $1,750-$2,300/mo (about a 7-15 year simple payback); roughly 14-35% gross on a $75,000-$150,000 garage conversion; before taxes, vacancy and financing.
| Avg Rent (1 Bedroom) | $1,750-$1,900/mo |
| Avg Rent (2 Bedroom) | $2,100-$2,300/mo |
| Short-Term Rental | A JADU may not be rented for less than 30 days (Gov. Code 66333, AB 1154). The city's minimum rental term for ADUs sits in Sec. |
| Est. Annual ROI | 7-15% gross rental yield on a $175,000-$320,000 detached build at $1,750-$2,300/mo (about a 7-15 year simple payback); roughly 14-35% gross on a $75,000-$150,000 garage conversion; before taxes, vacancy and financing |
Explore Prefab ADU Options
Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more
Recent Law Changes
What's Changed Recently
- Feb. 10, 2026: City Council acted on Ordinance No. 1983, the permanent amendment to Sec. 30-467 for the Jan. 1, 2026 state changes (AB 1154 JADU owner-occupancy and 30-day JADU rental minimum; SB 543 60-day deemed approval); the city's ADU Information Sheet was reissued in March 2026 to match
- Jan. 1, 2026: SB 543 - an ADU application is deemed approved if the city does not act within 60 days of a complete application (Gov. Code 66317)
- Jan. 1, 2026: AB 1154 - owner occupancy may be required for a JADU only if it shares a bathroom with the main house; JADU rentals must be longer than 30 days (Gov. Code 66333)
- April 8, 2025: Ordinance No. 1966 adopted (4-0), replacing the Nov. 12, 2024 urgency ordinance: up to 8 detached ADUs on existing multifamily lots, no replacement parking when a garage is converted, and permits cannot be denied for unpermitted ADUs/JADUs built before Jan. 1, 2020 (AB 2533 / SB 1211)
- 2025: Standard ADU Plans program launched under AB 1332 with three pre-approved detached plans (462, 738 and 1,143 sq ft)
- Sept. 2026: entry re-verified against the March 2026 ADU Information Sheet, the Standard ADU Plans page, the Res. 2024-054 development fee sheet and the Plan Check page; unsourced claims ("permit fees waived", "~60 days with pre-approved plans") removed
Tips for Building an ADU in Fontana
- Pick your class before you design: a Class 1 detached ADU (800 sq ft or less, 16 ft, 4 ft setbacks) gets no parking and no design review; a Class 2 unit (up to 1,200 sq ft) needs one parking space unless exempt and must match the house architecturally (Sec. 30-467).
- Stay at 750 sq ft or less to avoid city impact fees entirely (Gov. Code 66311.5); the city's single-family fee sheet totals about $20,600 in Planning fees plus $9,643 in sewer fees per unit, and a larger ADU pays a proportional share of that.
- Worked example (our arithmetic from the 10/2024 fee sheet): a 1,000 sq ft ADU behind a 2,000 sq ft house owes about 50% of the per-unit fees, roughly $10,300 in Planning impact fees plus about $4,800 in city sewer fees, before building permit, IEUA and school fees.
- The three free Standard ADU Plans (462, 738, 1,143 sq ft) are all detached; the 462 and 738 sq ft plans stay under the 750 sq ft impact-fee line, the 1,143 sq ft plan does not.
- Built an ADU without a permit before 2020? Since Jan. 1, 2025 the city must issue a legalizing permit unless the unit is substandard; Building & Safety publishes a Substandard Building Checklist (Nov. 2025) for unpermitted ADUs/JADUs (Gov. Code 66311.7, formerly 66332).
- On a multifamily lot you can add converted ADUs in garages, storage or basements up to 25% of the existing unit count and up to 8 detached ADUs, each 850 sq ft (1,000 sq ft with 2+ bedrooms).
- Budget the whole timeline, not just the 60-day clock: a first plan check takes about 3-4 weeks and each recheck about 2 weeks, so a clean submittal on a standard plan is the fastest route.
- Cost basis: Inland Empire figures from CaliFirst Remodel (May 2026), LA Metro Home Finder (June 2026), Construction Station (Sept. 2026) and Autonomous (Feb. 2026); rents from Zumper (Sept. 19, 2026), RentCafe (Aug. 31, 2026) and HUD FY2026 Fair Market Rent for the Riverside-San Bernardino-Ontario metro ($1,777 1BR, $2,201 2BR).
- Contacts: Planning (909) 350-6718, planning@fontanaca.gov; Building & Safety (909) 350-7640, building@fontanaca.gov, 8353 Sierra Ave; Fire Prevention plan check (909) 428-8891.
- Cost basis (2026-09-20 re-verification): short term allowed: A JADU may not be rented for less than 30 days (Gov. Code 66333, AB 1154). The city's minimum rental term for ADUs sits in Sec. 30-467, which could not be read online this month; state law lets cities require terms over 30 days, so plan on 30-day-plus tenancies and confirm with Planning, (909) 350-6718.
ADU Builders in Fontana
Looking for an ADU builder in Fontana? ADU projects need a contractor experienced with local zoning, the permit process, and utility connections — not every general contractor has built one. We match Fontana homeowners with experienced local ADU contractors who provide free, no-obligation quotes. Getting at least three bids typically saves 20-40% on the same scope.
Sources & References
All data on this page is sourced from official government records and verified market data. View our full methodology.
- Single-Family and Multi-Family Accessory Dwelling Unit Types - ADU Information Sheet (updated March 2026) | City of Fontana Planning government — Accessed 2026-09-20
- Fontana Municipal Code Sec. 30-467, Accessory dwelling units and junior accessory dwelling units (Municode; Cloudflare-blocked on 2026-09-20, read via the city's March 2026 information sheet) government — Accessed 2026-09-20
- Notice of Exemption, Municipal Code Amendment No. 24-006 - Urgency Ordinance Amending Sec. 30-467 (filed 11/15/2024) | CEQAnet government — Accessed 2026-09-20
- Notice of Exemption, Municipal Code Amendment No. 24-0006 - Chapter 30 ADU/JADU amendment (filed 4/10/2025, permanent Ordinance No. 1966) | CEQAnet government — Accessed 2026-09-20
- FAQ: Can I build an accessory dwelling unit (ADU) or junior accessory dwelling unit (JADU)? | City of Fontana Planning government — Accessed 2026-09-20
- AB 1154 (Carrillo, 2025), Junior accessory dwelling units - Gov. Code 66333 as amended (chaptered 10/10/2025) | California Legislative Information government — Accessed 2026-09-20
- Standard ADU Plans - three AB 1332 pre-approved detached plans (462, 738, 1,143 sq ft) | City of Fontana Building & Safety government — Accessed 2026-09-20
- Plan Check - submission, review process (first review 3-4 weeks, rechecks 2 weeks) | City of Fontana Building & Safety government — Accessed 2026-09-20
- Development Fees sheet - Building & Safety, Planning and Engineering fees, Update of User Fees 09/01/2024 per Resolution 2024-054 (rev. 10/07/2024) | City of Fontana government — Accessed 2026-09-20
- Substandard Building Checklist for Unpermitted Accessory Dwelling Units and Junior Accessory Dwelling Units (Nov. 2025) | City of Fontana Building & Safety government — Accessed 2026-09-20
- FAQ: What is the fee to file for a building permit or to submit plans? | City of Fontana Building & Safety government — Accessed 2026-09-20
- Fire Prevention - Permits, Inspections & Fees (15-working-day plan review goal) | Fontana Fire Protection District government — Accessed 2026-09-20
- ADU Costs in California (2026): City-by-City Numbers - Inland Empire section (May 28, 2026) | CaliFirst Remodel industry — Accessed 2026-09-20
- ADU Permit Rules: Inland Empire Cities 2026 - cost per sq ft and garage conversions (June 12, 2026) | LA Metro Home Finder industry — Accessed 2026-09-20
- ADU Contractors Inland Empire - garage conversion, JADU and detached cost ranges | Construction Station industry — Accessed 2026-09-20
- Prefab ADUs in Southern California: Complete Guide for 2026 (Feb. 26, 2026) | Autonomous industry — Accessed 2026-09-20
- Fontana, CA rent research - median rents by bedroom (updated Sept. 19, 2026) | Zumper industry — Accessed 2026-09-20
- Average Rent in Fontana, CA (as of Aug. 31, 2026) | RentCafe industry — Accessed 2026-09-20
- FY 2026 Fair Market Rents, Riverside-San Bernardino-Ontario, CA MSA (METRO40140M40140) | HUD User government — Accessed 2026-09-20
Frequently Asked Questions
Can I build an ADU in Fontana?
How much does an ADU cost in Fontana?
How much can I rent an ADU for in Fontana?
Do I need parking for an ADU in Fontana?
How long does it take to get an ADU permit in Fontana?
Ready to Build in Fontana?
Get free, no-obligation quotes from top-rated ADU contractors in Fontana.
Get Free Quotes →Build ADUs in Fontana?
Homeowners read this page while planning, then ask us to connect them with a local builder. We pass those requests to builders who cover Fontana — a flat fee only on the leads you accept, no subscription, and you contract directly with the homeowner.
See who's waiting in California →