Kansas City allows one accessory dwelling unit by right on any lot where a detached house is the principal building, in every zoning district, under Sec. 88-305-15 of the Zoning and Development Code (Ord. 220698, passed Sept. 15, 2022; re-enacted with a height cap by Ord. 230552, June 29, 2023). A detached ADU goes in the rear yard, 5 ft from every property line, no taller than the house or 25 ft, with a footprint of at most 60% of the house's footprint or 25% of the rear yard and a floor area of at most 800 sq ft (or 90% of the house's). No extra parking is required, but the owner must live in the house or the ADU and record a deed restriction before the certificate of occupancy. The permit is a standard one- and two-family building permit through CompassKC (7-business-day review goal; about $550 in building-permit fees on a $150,000 project), and the City offers seven free pre-approved plans, including an ADU-over-garage design.
Zoning & Size Requirements [1][2][3][4][5][6][7]
Yes — Kansas City allows ADUs. A detached ADU can typically be up to 800 sq ft under current Missouri and Kansas City zoning rules.
See what this means for your lot — ask Kansas City ADU builders for a quote →
| Allowed Zones | Citywide: any lot where a detached dwelling is the principal building, in every zoning district (Sec. 88-305-15-B; Ord. 220698, passed 9-15-2022). Attached ADUs must sit in the rear or side yard; detached ADUs in the rear yard (88-305-15-C.1). |
| Max Size (Detached) | 800 sq ft floor area or 90% of the house's floor area, whichever is smaller (88-305-15-C.7.d). Footprint also capped at 60% of the house's footprint or 25% of the rear yard, whichever is smaller, and never more than 800 sq ft (C.7.c). An ADU in or on a garage counts the garage's floor area cumulatively (C.4), and all detached accessory buildings together must stay within 88-305-02-E (C.7.f). |
| Max Size (Attached) | No separate ADU cap in the code: an attached ADU follows the lot and building standards of the principal building (88-305-15-C.6); the 800 sq ft / 90% limits in C.7 apply to detached units. It may have its own exterior entrance or a shared vestibule (C.5). Confirm with the Development Concierge before designing above 800 sq ft; the building code treats house-plus-attached-ADU as a duplex. |
| Max Size (JADU) | Not a category in Kansas City's code. The only accessory unit type is the ADU defined in 88-810-005: 'a secondary dwelling unit on the same lot as a principal dwelling unit' that may house an independent household. |
| Max Height | Detached ADU: the height of the principal building or 25 ft, whichever is less (88-305-15-C.7.a, added by Ord. 230552, passed 6-29-2023). Attached ADU: the district height limit that applies to the house (C.6). Exterior stairs to an upper-level ADU are allowed only on sides facing the interior of the lot (C.8). |
| Max Units | One ADU per lot: 88-810-005 defines an ADU as 'a secondary dwelling unit on the same lot as a principal dwelling unit', and the 2022 staff report (CD-CPC-2022-00131) describes the house plus the ADU as 'the two units'. |
Setback Requirements [1][2][3][4][5][6][7]
Kansas City requires a rear setback of about 5 ft for a detached ADU, and no additional parking is required. Owner-occupancy is required.
| Rear Setback | 5 ft from all property lines, measured to projections such as eaves (88-305-15-C.7.b). Any other setbacks follow the accessory-structure rules of 88-305-02 (C.7.e). |
| Side Setback | 5 ft including projections; on a street side yard, 5 ft or the principal building's setback, whichever is greater (88-305-15-C.7.b). |
| Front Setback | A detached ADU must be in the rear yard (88-305-15-C.1 and C.7). An attached ADU sits in the rear or side yard and keeps the house's own front setback (C.1, C.6). |
| Parking Required | None: 'No additional off-street parking is required' (88-305-15-C.3); any parking you choose to build must meet 88-420. Separately, Ord. 260219 (passed 4-9-2026) rewrote 88-420 to drop minimum off-street parking inside the Urban Core (Missouri River to 85th St, State Line Rd to the Blue River) and for houses on lots platted before 9-10-1951. |
| Owner Occupancy | Required: the owner must live in either the house or the ADU and record a deed restriction limiting occupancy of one unit to the owner; proof of recording goes to the Director of City Planning and Development before the ADU's certificate of occupancy (88-305-15-C.2). Ord. 220698 ordered a one-year review of this rule; the June 2023 re-enactment (Ord. 230552) kept it unchanged. |
| Min Lot Size | None stated in 88-305-15; the 60%-of-house / 25%-of-rear-yard footprint caps and the 88-305-02-E total accessory-building limit do the work. Since 1-1-2024 a sealed, staked survey must accompany the plans unless the structure is more than 10 ft from every property line (IB100). |
Permit Process & Fees [8][9][10][11][12]
An ADU permit in Kansas City goes through a standard permit review. Typical timeline: Plans Review's published goal for one- and two-family reviews is 7 business days per cycle (resubmittals 10 business days); allow 3-8 weeks to permit including one resubmittal (estimate). The 2x-fee priority review is not offered for one- and two-family projects. Permit fees: Residential building permit = $483 + $1.41 per $1,000 of valuation over $100,000 (City fee calculator; Building Code Sec. 18-20): about $554 on a $150,000 ADU or $624 on $200,000, plus separate electrical, plumbing and mechanical permits.
| Approval Process | By right, no hearing. Apply on CompassKC for a one- and two-family building permit (site plan plus sealed survey per IB100), then electrical, plumbing and mechanical permits (licensed contractors, or the owner-occupant for DIY work); record the owner-occupancy deed restriction; pass inspections; obtain the certificate of occupancy before anyone moves in. |
| Review Timeline | Plans Review's published goal for one- and two-family reviews is 7 business days per cycle (resubmittals 10 business days); allow 3-8 weeks to permit including one resubmittal (estimate). The 2x-fee priority review is not offered for one- and two-family projects. |
| Permit Fees | Residential building permit = $483 + $1.41 per $1,000 of valuation over $100,000 (City fee calculator; Building Code Sec. 18-20): about $554 on a $150,000 ADU or $624 on $200,000, plus separate electrical, plumbing and mechanical permits. |
| Impact Fees | No general impact fee, but the Arterial Street Impact Fee (Ch. 39, Sec. 39-4) is charged at building-permit issuance for new residential construction inside eight benefit districts (growth areas, mainly the Northland and south KC); ask the Permits Division whether your parcel is in a district and how an ADU is assessed. |
| Plan Check | Included in the building-permit review; the City calculator lists no separate residential plan-check fee. Express review by appointment under IB115; a staked, sealed survey is required with the plans since 1-1-2024 (IB100). |
| Pre-Approved Plans | Yes: 7 free Pre-Approved Housing Master Plans including an 'ADU Over Garage' and a 'Tiny House'. You still submit a site plan and survey, pull each trade permit, and have a mechanical contractor design the HVAC (IB171). |
Get Free ADU Quotes in Kansas City
Tell us about your project and we'll pass it to ADU builders serving Kansas City.Get free quotes from local ADU builders serving Kansas City. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.
Takes about a minute.
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
Compare quotes, verify license & insurance, hire (or don't). No spam either way.
We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.
🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.
Just browsing? Search ADU builders near you by ZIP code.
Construction Costs [13][14]
Building an ADU in Kansas City typically costs $90,000-$200,000 ($150-$300 per sq ft); a garage conversion runs $60,000-$150,000.
See what this means for your lot — ask Kansas City ADU builders for a quote →
| Average Build Cost | $90,000-$200,000 |
| Cost per Sq Ft | $150-$300 |
| Garage Conversion | $60,000-$150,000 |
| Prefab ADU (Installed) | $75,000-$150,000 |
Finance Your ADU Project
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more
Rental Income Potential [15][16][17][18]
A 2-bedroom ADU in Kansas City rents for around $1,350-$1,550/mo, an estimated 6-10% gross (estimate).
| Avg Rent (1 Bedroom) | $1,100-$1,300/mo |
| Avg Rent (2 Bedroom) | $1,350-$1,550/mo |
| Short-Term Rental | Yes, only as a 'resident short-term rental': non-resident STRs are prohibited in every R district (88-321, Ord. 230267, passed 5-4-2023). The registrant must keep their primary residence on the same parcel (270+ days a year, 12-month certification) and register yearly ($200; Ch. 56 Art. VIII, re-enacted by Ord. 250965, 11-13-2025). |
| Est. Annual ROI | 6-10% gross (estimate) |
Explore Prefab ADU Options
Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more
Recent Law Changes
What's Changed Recently
- Ord. 260219 (passed April 9, 2026): 88-420 parking rewritten, no minimum off-street parking in the Urban Core; ADUs already needed none under 88-305-15-C.3
- Ord. 250965 (passed Nov 13, 2025): short-term rental registration re-enacted at $200/yr, resident-only in R districts, plus a 'major event' registration of up to 90 days for the 2026 World Cup
- Ord. 250285 (passed April 17, 2025): more housing types allowed on corner lots in R-6 districts (88-110-04 and -06); not an ADU change
- Ord. 230552 (passed June 29, 2023): 88-305-15 re-enacted to add the 25-ft/principal-building height cap, the garage-combination floor-area rule and the 88-305-02-E total-footprint reference; owner-occupancy kept
- Ord. 230267 and 230268 (passed May 4, 2023): non-resident STRs prohibited in all R districts; registration required from June 15, 2023
- Ord. 220698 (passed Sept 15, 2022): ADUs legalized citywide by right (new 88-305-15 and 88-810-005)
- 2026-09-20: entry re-verified against the authenticated ordinances (Municode is bot-walled); attached-ADU sizing, STR eligibility, permit fees, review time and impact-fee wording corrected
Tips for Building an ADU in Kansas City
- Cost basis: Tiny Terra Homes' Kansas City guide (July 19, 2026) puts a typical metro ADU at $90,000-$180,000+; Angi (May 30, 2026) gives $150-$300 per sq ft and $60,000-$150,000 for a garage conversion; the prefab range is the KC range less roughly 20%. Rents: HUD FY2026 FMR $1,197 (1BR) / $1,358 (2BR) and Zumper medians of $1,120 / $1,400 (Sept 20, 2026).
- Do the footprint math first: a 1,200 sq ft house allows at most 720 sq ft of detached-ADU footprint (60%), a 2,400 sq ft rear yard allows 600 sq ft (25%), and the smaller number wins; a detached garage shares the accessory-building total under 88-305-02-E.
- An attached ADU is not capped at 800 sq ft by 88-305-15 (it follows the house's own lot and building standards under C.6), but confirm with the Development Concierge (concierge@kcmo.org, 816-513-1511) before you design larger.
- Order the sealed, staked survey early (required since Jan 1, 2024 unless every wall is more than 10 ft from a property line) and record the owner-occupancy deed restriction before final inspection; the certificate of occupancy waits on proof of recording.
- Short-term renting the ADU works only while your primary residence stays on the parcel: register under Ch. 56 Art. VIII ($200/yr) before listing; a non-resident STR in an R district is prohibited.
- Fire-rated construction is a building-code requirement within 5 ft of a property line or 10 ft of another building, so a 5-ft-setback ADU usually needs rated walls; price that into the design.
ADU Builders in Kansas City
Looking for an ADU builder in Kansas City? ADU projects need a contractor experienced with local zoning, the permit process, and utility connections — not every general contractor has built one. We match Kansas City homeowners with experienced local ADU contractors who provide free, no-obligation quotes. Getting at least three bids typically saves 20-40% on the same scope.
Sources & References
All data on this page is sourced from official government records and verified market data. View our full methodology.
- Authenticated Ordinance 230552 (passed 6-29-2023): repeals and re-enacts Sec. 88-305-15 Accessory Dwelling Units (adds max height) - KC City Clerk/Legistar Government Data — Accessed 2026-09-20
- Ordinance 220698 committee substitute text (passed 9-15-2022): new Secs. 88-305-15 and 88-810-005 - KC City Clerk/Legistar Government Data — Accessed 2026-09-20
- Ordinance 220698 record (introduced 8-11-2022, passed 9-15-2022) - Kansas City Legistar Government Data — Accessed 2026-09-20
- City Plan Commission staff report CD-CPC-2022-00131 (ADU ordinance, 9-6-2022) Government Data — Accessed 2026-09-20
- Ordinance 260219 (passed 4-9-2026): repeal and replace Sec. 88-420 Parking and Loading - Parking Text Amendments exhibit Government Data — Accessed 2026-09-20
- KCMO Chapter 88 - Code Amendments (pending text amendments list) Planning Department — Accessed 2026-09-20
- KCMO Zoning and Development Code Sec. 88-305-15 (Municode, current codification) Government Data — Accessed 2026-09-20
- KCMO Pre-Approved Housing Master Plans (7 free plans incl. ADU Over Garage) Planning Department — Accessed 2026-09-20
- KCMO Building and Development Fee Schedule + Fee Estimation Calculator (residential permit formula) Planning Department — Accessed 2026-09-20
- KCMO Plans Review - turnaround times (one- and two-family 7 business days), IB100 survey rule Planning Department — Accessed 2026-09-20
- KCMO Electrical, Plumbing and Mechanical Permits (who may pull trade permits; CofO) Planning Department — Accessed 2026-09-20
- KCMO Development Process Guide - Arterial Street Impact Fees FAQ (Ch. 39, Sec. 39-4) Planning Department — Accessed 2026-09-20
- Tiny Terra Homes - ADU Cost Breakdown: 2026 Guide for Kansas City Owners (July 19, 2026) industry — Accessed 2026-09-20
- Angi - How Much Does an ADU Cost to Build? (updated May 30, 2026) industry — Accessed 2026-09-20
- HUD FY2026 Fair Market Rents - Kansas City, MO-KS HUD Metro FMR Area (FY26_FMRs.xlsx) Government Data — Accessed 2026-09-20
- Zumper - Kansas City, MO rent research (updated Sept 20, 2026) industry — Accessed 2026-09-20
- Authenticated Ordinance 230267 C.S. (passed 5-4-2023): Sec. 88-321 Short Term Rentals Government Data — Accessed 2026-09-20
- Authenticated Ordinance 250965 C.S. (passed 11-13-2025): Ch. 56 Art. VIII Short-Term Rental Registration Government Data — Accessed 2026-09-20
- Kansas City Legistar web API - matters with 'Accessory Dwelling' in the title (220698 and 230552 only) Government Data — Accessed 2026-09-20
Frequently Asked Questions
Can I build an ADU in Kansas City?
How much does an ADU cost in Kansas City?
How much can I rent an ADU for in Kansas City?
Do I need parking for an ADU in Kansas City?
How long does it take to get an ADU permit in Kansas City?
Ready to Build in Kansas City?
Get free, no-obligation quotes from top-rated ADU contractors in Kansas City.
Get Free Quotes →Build ADUs in Kansas City?
Homeowners read this page while planning, then ask us to connect them with a local builder. We pass those requests to builders who cover Kansas City — a flat fee only on the leads you accept, no subscription, and you contract directly with the homeowner.
See who's waiting in Missouri →