ADU Rules in Montclair, New Jersey

Complete guide to building an Accessory Dwelling Unit in Montclair — zoning, setbacks, permits, costs, and more.

Max Size: Living area no more than 40% of the primary dwelling unit, minimum 300 sq ft, maximum 800 sq ft, no more than three rooms excluding kitchen and bathroom (§347-8 D(3)); a fully accessible adaptive-reuse ADU may add 5% (D(8)). Detached ADUs also follow §347-22: rear yard only, at most 25% of the rear yard (15% in R-O/R-O(a)), footprint up to 24 ft in any direction (36 ft in R-O/R-O(a)); Ord. O-25-29 (Aug 2025) changed the ADU dimension rule - confirm the current figure with the Zoning Officer. Setbacks: Detached ADU in R-1: 6 ft minimum rear yard setback for accessory structures (§347-46 A(3)); R-O: 10 ft (§347-34 A(3)). R-O(a) and R-2 accessory-structure setbacks: confirm with the Zoning Officer. An accessory structure within 4 ft of the house counts as part of it and must meet principal-building setbacks (§347-22 E). Parking: 1 Space Verified: 2026-09-20
ADU Score: 6/10
Moderately friendly · how we score

Are ADUs allowed in Montclair, NJ? [1][2][3][4][5][6][7]

Yes. Montclair allows ADUs on most residential lots. A detached unit can be up to 800 sq ft, set 6 ft back from the rear line. One off-street space is required. Owner-occupancy is required. A building permit is required and applications are reviewed through the standard permit process.

Maximum sizeLiving area no more than 40% of the primary dwelling unit, minimum 300 sq ft, maximum 800 sq ft, no more than three rooms excluding kitchen and bathroom (§347-8 D(3)); a fully accessible adaptive-reuse ADU may add 5% (D(8)). Detached ADUs also follow §347-22: rear yard only, at most 25% of the rear yard (15% in R-O/R-O(a)), footprint up to 24 ft in any direction (36 ft in R-O/R-O(a)); Ord. O-25-29 (Aug 2025) changed the ADU dimension rule - confirm the current figure with the Zoning Officer.
SetbacksRear Detached ADU in R-1: 6 ft minimum rear yard setback for accessory structures (§347-46 A(3)); R-O: 10 ft (§347-34 A(3)). R-O(a) and R-2 accessory-structure setbacks: confirm with the Zoning Officer. An accessory structure within 4 ft of the house counts as part of it and must meet principal-building setbacks (§347-22 E). · Side Detached ADU in R-1: 6 ft minimum side yard on interior lots; corner lots 6 ft on one side and 28 ft on the street side (§347-46 A(2)). R-O: 12 ft and 18 ft on interior lots, 12 ft and 55 ft on corner lots (§347-34 A(2)). Any ADU window facing another residential property must be at least 6 ft from the property line (§347-8 D(14)).
ParkingAt least one off-street parking space for the ADU (§347-8 D(13)), in addition to the parking required for the main house; accessory parking areas may not sit between the house and the street (R-O §347-34 B, applied to R-1 by §347-46 C).
Owner-occupancyRequired - either the ADU or the primary dwelling unit must be the primary domicile of the person or entity that owns the property; on a two-family lot the owner must occupy one of the units or the ADU (§347-8 D(1)). The owner must file an affidavit of continued compliance every year by January 1 or the ADU's certificate of occupancy is revoked (§347-8 E(6)).

Do I need a permit to build an ADU in Montclair? [8]

Yes. Every ADU in Montclair needs a building permit. Review process: 1) ADU Zoning Permit application to the Department of Planning & Community Development with a survey (a recent survey for detached ADUs and additions), floor plans by a licensed architect or engineer, and elevations; 2) meeting with the Zoning Officer, then a written decision; 3) NJ Uniform Construction Code building permits through the Building Department; 4) deed notice recorded with Essex County before the certificate of occupancy; 5) final inspection by the Construction and Fire Officials within 20 days of completion (§347-8 E). Denials may be appealed to the Zoning Board of Adjustment within 45 days..

Permit fees$50 ADU zoning permit fee, by check or money order (Township ADU Zoning Permit Application, unchanged since 2023). Construction permits and the ADU certificate of occupancy are charged under the township's current UCC fee schedule (§347-8 E(5)(b)) - ask the Building Department for figures.
Typical timelineZoning decision within 20 business days: the Zoning Officer must meet you within 10 business days of a complete application and decide within 10 business days after the meeting (§347-8 E(1)(d)). Construction-permit review times are not published; work must start within 2 years of approval.

Three things to know before you build in Montclair

  • Do the 40% math first: an ADU may not exceed 40% of the primary dwelling unit's living area (basements and attics count, garages do not) - a 1,500 sq ft house allows a 600 sq ft ADU, and only homes of 2,000 sq ft or more reach the 800 sq ft cap (§347-8 B, D(3))
  • Three rooms maximum excluding kitchen and bathroom: a two-bedroom-plus-living-room layout is the most you can fit, whatever the square footage
  • Owner-occupancy is enforced every year: file the affidavit of continued compliance by January 1 or the ADU's certificate of occupancy is revoked within 30 days, with fines of $250 for the first month and up to $100/day after (§347-8 E(6))

Last verified 2026-09-20 against Montclair planning code. How we verify

Yes. Montclair allows one accessory dwelling unit by right on any lot with a one- or two-family home in the R-O, R-O(a), R-1 and R-2 zones (Montclair Code §347-8, added by Ord. O-22-27, adopted February 21, 2023). The ADU can be attached, detached, or built inside an accessory building such as a garage, but its living area is capped at 40% of the primary dwelling unit, between 300 and 800 sq ft, with no more than three rooms besides the kitchen and bathroom; the owner must live in either the house or the ADU, one off-street parking space is required, and leases must run at least six months. A detached ADU follows the zone's accessory-building rules (§347-22: rear yard only, at most 25% of the rear yard, 15% in R-O/R-O(a); in R-1, 15 ft high with 6 ft side and rear setbacks). The Zoning Officer must meet you within 10 business days of a complete application and decide within 10 business days after that; the zoning permit fee is $50, followed by standard NJ Uniform Construction Code permits and an Essex County deed notice. eCode360 records a further amendment to §347-8 in August 2025 (Ord. O-25-29) whose text we could not read, so confirm current detached-ADU dimension limits with the Zoning Officer; New Jersey still has no statewide ADU law (S1786/A3488 pending).

Zoning & Size Requirements [1][2][3][4][5][6][7]

Yes — Montclair allows ADUs. A detached ADU can typically be up to 800 sq ft under current New Jersey and Montclair zoning rules.

See what this means for your lot — ask Montclair ADU builders for a quote →

Allowed ZonesR-O, R-O(a), R-1 and R-2 zones, on lots containing a one- or two-family dwelling; the ADU is a permitted accessory use approved by the Zoning Officer without a variance (Montclair Code §347-8 C-D). Not permitted in R-3/R-4 multifamily or commercial zones.
Max Size (Detached)Living area no more than 40% of the primary dwelling unit, minimum 300 sq ft, maximum 800 sq ft, no more than three rooms excluding kitchen and bathroom (§347-8 D(3)); a fully accessible adaptive-reuse ADU may add 5% (D(8)). Detached ADUs also follow §347-22: rear yard only, at most 25% of the rear yard (15% in R-O/R-O(a)), footprint up to 24 ft in any direction (36 ft in R-O/R-O(a)); Ord. O-25-29 (Aug 2025) changed the ADU dimension rule - confirm the current figure with the Zoning Officer.
Max Size (Attached)Same cap: living area no more than 40% of the primary dwelling unit, 300-800 sq ft, three rooms maximum excluding kitchen and bathroom (§347-8 D(3)). An attached ADU must use exterior materials and colors complementary to the main house, and a new ADU entrance may not face the same street as the main entrance if visible from the street (D(10)-(11)). Additions count as part of the principal building and follow principal-building setbacks (§347-22 E).
Max Size (JADU)Not applicable - Montclair Code §347-8 has no junior-ADU category; 300 sq ft is the smallest ADU the code allows
Max HeightDetached ADU: the zone's accessory-structure height limit - 15 ft in R-1 (§347-46 A) and 15 ft in R-O (§347-34 A); R-O(a) and R-2 use their own accessory-structure sections, confirm with the Zoning Officer. Attached ADU: the principal-building limit (35 ft in R-O and R-1). Re-confirm after Ord. O-25-29 (August 2025).
Max UnitsOne ADU per lot (§347-8 D(6)), for one family; it may not be sold separately from the primary residence (E(7)(c)). Lots are limited to two accessory buildings over 100 sq ft (§347-22 G).

Setback Requirements [1][2][3][4][5][6][7]

Montclair requires a rear setback of about 6 ft for a detached ADU, and one off-street parking space is required. Owner-occupancy is required.

Rear SetbackDetached ADU in R-1: 6 ft minimum rear yard setback for accessory structures (§347-46 A(3)); R-O: 10 ft (§347-34 A(3)). R-O(a) and R-2 accessory-structure setbacks: confirm with the Zoning Officer. An accessory structure within 4 ft of the house counts as part of it and must meet principal-building setbacks (§347-22 E).
Side SetbackDetached ADU in R-1: 6 ft minimum side yard on interior lots; corner lots 6 ft on one side and 28 ft on the street side (§347-46 A(2)). R-O: 12 ft and 18 ft on interior lots, 12 ft and 55 ft on corner lots (§347-34 A(2)). Any ADU window facing another residential property must be at least 6 ft from the property line (§347-8 D(14)).
Front SetbackDetached ADUs are not allowed in the front yard - accessory buildings must be in the rear yard (§347-22 A). A new ADU entrance may not face the same street as the main house's entrance if it is visible from the street (§347-8 D(11)).
Parking RequiredAt least one off-street parking space for the ADU (§347-8 D(13)), in addition to the parking required for the main house; accessory parking areas may not sit between the house and the street (R-O §347-34 B, applied to R-1 by §347-46 C).
Owner OccupancyRequired - either the ADU or the primary dwelling unit must be the primary domicile of the person or entity that owns the property; on a two-family lot the owner must occupy one of the units or the ADU (§347-8 D(1)). The owner must file an affidavit of continued compliance every year by January 1 or the ADU's certificate of occupancy is revoked (§347-8 E(6)).
Min Lot SizeNone specific to ADUs in §347-8; the lot must already lawfully hold a one- or two-family home and meet the zone's bulk rules (minimum lot widths per the 2017 Zoning Map, §347-18 D). A detached ADU also needs a rear yard large enough that accessory buildings cover no more than 25% of it (15% in R-O/R-O(a)).

Permit Process & Fees [8]

An ADU permit in Montclair goes through a standard permit review. Typical timeline: Zoning decision within 20 business days: the Zoning Officer must meet you within 10 business days of a complete application and decide within 10 business days after the meeting (§347-8 E(1)(d)). Construction-permit review times are not published; work must start within 2 years of approval. Fees range from $50 ADU zoning permit fee, by check or money order (Township ADU Zoning Permit Application, unchanged since 2023). Construction permits and the ADU certificate of occupancy are charged under the township's current UCC fee schedule (§347-8 E(5)(b)) - ask the Building Department for figures.

Approval Process1) ADU Zoning Permit application to the Department of Planning & Community Development with a survey (a recent survey for detached ADUs and additions), floor plans by a licensed architect or engineer, and elevations; 2) meeting with the Zoning Officer, then a written decision; 3) NJ Uniform Construction Code building permits through the Building Department; 4) deed notice recorded with Essex County before the certificate of occupancy; 5) final inspection by the Construction and Fire Officials within 20 days of completion (§347-8 E). Denials may be appealed to the Zoning Board of Adjustment within 45 days.
Review TimelineZoning decision within 20 business days: the Zoning Officer must meet you within 10 business days of a complete application and decide within 10 business days after the meeting (§347-8 E(1)(d)). Construction-permit review times are not published; work must start within 2 years of approval.
Permit Fees$50 ADU zoning permit fee, by check or money order (Township ADU Zoning Permit Application, unchanged since 2023). Construction permits and the ADU certificate of occupancy are charged under the township's current UCC fee schedule (§347-8 E(5)(b)) - ask the Building Department for figures.
Impact FeesNo impact fees in New Jersey. Montclair's Chapter 65 affordable-housing development fee (amended March 2026 by Ord. O-26-04) and water/sewer connection charges for a detached unit may apply - confirm with the Planning Department and the Water Bureau before budgeting.
Plan CheckStandard NJ UCC plan review by the Building Department. Floor plans must be drawn by a licensed architect or engineer for detached ADUs and additions; new construction must follow the NJ Barrier Free Subcode (§347-8 D(9)); the ADU needs complete independent living facilities including a kitchen and bathroom.
Pre-Approved PlansNone - Montclair offers no pre-approved ADU plan program as of September 2026

Get Free ADU Quotes in Montclair

Tell us about your project and we'll pass it to ADU builders serving Montclair. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

Construction Costs [9][10][11][12]

Building an ADU in Montclair typically costs $200,000-$400,000 ($250-$450 per sq ft); a garage conversion runs $95,000-$200,000.

See what this means for your lot — ask Montclair ADU builders for a quote →

Average Build Cost$200,000-$400,000
Cost per Sq Ft$250-$450
Garage Conversion$95,000-$200,000
Prefab ADU (Installed)$150,000-$250,000 installed

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Rental Income Potential [13][14][15]

A 2-bedroom ADU in Montclair rents for around $2,900-$3,400/mo, an estimated 7-12% gross annual return (long-term rental of a 1-2 bedroom ADU at $2,400-$3,400/mo against a $300,000-$400,000 build, before taxes and financing).

Avg Rent (1 Bedroom)$2,400-$2,700/mo
Avg Rent (2 Bedroom)$2,900-$3,400/mo
Short-Term RentalNo - §347-8 D(12) requires a minimum rental term of six months for ADU tenants, so Airbnb-style short-term rental of an ADU is not permitted; a copy of the lease must be provided at final inspection (E(5)(a)).
Est. Annual ROI7-12% gross annual return (long-term rental of a 1-2 bedroom ADU at $2,400-$3,400/mo against a $300,000-$400,000 build, before taxes and financing)

Explore Prefab ADU Options

Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Recent Law Changes

What's Changed Recently

  • September 20, 2026 re-verification: every zoning standard re-read from Montclair Code §347-8, §347-22, §347-34 and §347-46; the $50 zoning permit fee confirmed on the township's current ADU application; rents re-based on HUD FY2027 Small Area FMRs for ZIPs 07042/07043; the 2025 amendment status corrected (see below)
  • August 12, 2025: eCode360 lists Ord. O-25-29 as amending §347-8 - the Council introduced the change on March 11, 2025 (6-1) to lengthen the maximum wall dimension for detached ADUs so an 800 sq ft unit can actually be built; the adopted text could not be read for this update, so confirm the current dimension limit with the Zoning Officer
  • March 2026: Ord. O-26-06 amended Chapter 347 (inclusionary zoning) and Ord. O-26-04 amended Chapter 65 (Affordable Housing); neither is known to change §347-8
  • February 21, 2023: Ord. O-22-27 created §347-8 (ADUs permitted in R-O, R-O(a), R-1 and R-2) and amended §347-20 A to allow one accessory dwelling on one- and two-family lots
  • Statewide: NJ ADU bills S1786/A3488 (2026-2027 session) were introduced in January 2026; no enactment found as of September 20, 2026, so Montclair's local rules govern

Tips for Building an ADU in Montclair

  • Do the 40% math first: an ADU may not exceed 40% of the primary dwelling unit's living area (basements and attics count, garages do not) - a 1,500 sq ft house allows a 600 sq ft ADU, and only homes of 2,000 sq ft or more reach the 800 sq ft cap (§347-8 B, D(3))
  • Three rooms maximum excluding kitchen and bathroom: a two-bedroom-plus-living-room layout is the most you can fit, whatever the square footage
  • Owner-occupancy is enforced every year: file the affidavit of continued compliance by January 1 or the ADU's certificate of occupancy is revoked within 30 days, with fines of $250 for the first month and up to $100/day after (§347-8 E(6))
  • Detached ADUs go in the rear yard and, with any other outbuildings, may cover at most 25% of it (15% in R-O/R-O(a)); in R-1 keep 6 ft from side and rear lines and under 15 ft tall (§347-22, §347-46)
  • Budget the recording step: an Essex County deed notice describing the ADU and its limits must be filed before the certificate of occupancy is issued, and a buyer must re-apply for a certificate of continued use within 60 days of purchase (§347-8 E(2), E(7))
  • Leases must run at least six months and the ADU cannot be sold separately, so plan for a long-term tenant, family member or caregiver rather than short-term guests (§347-8 D(12), E(7)(c))
  • Montclair has extensive historic districts; ask the Planning Department whether your property needs Historic Preservation Commission review before submitting the ADU zoning permit
  • A completed ADU triggers a New Jersey added assessment - ask the Montclair Tax Assessor to estimate the property-tax impact first
  • Cost basis: 2026 New Jersey industry guides (detached ADUs $200,000-$400,000+, additions $175-$375 per sq ft, full garage-to-ADU conversions $95,000-$220,000) with Essex County labor running 15-25% above the state average; rents are HUD FY2027 Small Area Fair Market Rents for 07042/07043 (1BR $2,440-$2,640, 2BR $2,940-$3,190) cross-checked against September 2026 asking rents

ADU Builders in Montclair

Looking for an ADU builder in Montclair? ADU projects need a contractor experienced with local zoning, the permit process, and utility connections — not every general contractor has built one. We match Montclair homeowners with experienced local ADU contractors who provide free, no-obligation quotes. Getting at least three bids typically saves 20-40% on the same scope.

Sources & References

All data on this page is sourced from official government records and verified market data. View our full methodology.

  1. Montclair Code §347-8 Accessory dwelling units (Ord. O-22-27, adopted 2-21-2023), eCode360 - read via the Wayback Machine capture of 2024-05-08; live page Cloudflare-walled Municipal Code — Accessed 2026-09-20
  2. Montclair Code §347-22 Location of accessory buildings (rear yard, 25%/15% coverage, 24 ft footprint rule) - Wayback capture of 2025-07-24 Municipal Code — Accessed 2026-09-20
  3. Montclair Code §347-46 R-1 One-Family Zone: height and setback of accessory structures (15 ft; 6 ft side and rear) - Wayback capture of 2023-01-19 Municipal Code — Accessed 2026-09-20
  4. Montclair Code §347-34 R-O Mountainside Zone: height and setback of accessory structures (15 ft; 12/18 ft side; 10 ft rear) - Wayback capture of 2022-07-17 Municipal Code — Accessed 2026-09-20
  5. Accessory Dwelling Units - Township of Montclair, Department of Planning & Community Development (requirements, process, deed notice, annual affidavit) city_website — Accessed 2026-09-20
  6. Ordinance Adoption notices - Township of Montclair Clerk (O-26-04 Chapter 65 Affordable Housing and O-26-06 Chapter 347 Zoning, March 12, 2026) city_website — Accessed 2026-09-20
  7. Montclair Council Considers Update to Accessory Dwelling Unit Law - Montclair Local (March 11, 2025 introduction, 6-1; 24 ft to 30 ft wall length) news_media — Accessed 2026-09-20
  8. Township of Montclair Zoning Permit Application - Accessory Dwelling Unit (Permit Fee $50; attachments; requirements; annual affidavit form) city_website — Accessed 2026-09-20
  9. The 2026 New Jersey ADU Playbook - Prodigy Real Estate (May 9, 2026): detached $200K-$400K+, garage conversion $120K-$220K, Essex labor +15-25% industry — Accessed 2026-09-20
  10. NJ Home Addition Cost 2026 - The 5th Wall (May 27, 2026): $175-$375 per sq ft ground floor, in-law suite/ADU $90K-$300K industry — Accessed 2026-09-20
  11. Garage Conversion Cost in NJ & PA (2026 Guide) - Magdev Inc.: full ADU/in-law suite $95K-$170K, luxury/detached $170K+ industry — Accessed 2026-09-20
  12. New Jersey Prefab ADUs - DC Structures: completed kit projects $150,000-$250,000+ industry — Accessed 2026-09-20
  13. HUD FY2027 Small Area Fair Market Rents - Newark, NJ HUD Metro FMR Area, ZIP 07042 (1BR $2,440, 2BR $2,940) and 07043 (1BR $2,640, 2BR $3,190), effective October 1, 2026 government — Accessed 2026-09-20
  14. HUD FY2027 Fair Market Rents - Newark, NJ HMFA (1BR $1,850, 2BR $2,233): Montclair ZIPs run 30-45% above the metro FMR government — Accessed 2026-09-20
  15. Average Rent in Montclair, NJ - RentCafe / Yardi Matrix (last updated September 10, 2026): 1BR $2,484, 2BR $3,393 industry — Accessed 2026-09-20

Frequently Asked Questions

Can I build an ADU in Montclair?

Yes. ADUs are allowed in R-O, R-O(a), R-1 and R-2 zones, on lots containing a one- or two-family dwelling; the ADU is a permitted accessory use approved by the Zoning Officer without a variance (Montclair Code §347-8 C-D). Not permitted in R-3/R-4 multifamily or commercial zones. in Montclair. The maximum size for a detached ADU is Living area no more than 40% of the primary dwelling unit, minimum 300 sq ft, maximum 800 sq ft, no more than three rooms excluding kitchen and bathroom (§347-8 D(3)); a fully accessible adaptive-reuse ADU may add 5% (D(8)). Detached ADUs also follow §347-22: rear yard only, at most 25% of the rear yard (15% in R-O/R-O(a)), footprint up to 24 ft in any direction (36 ft in R-O/R-O(a)); Ord. O-25-29 (Aug 2025) changed the ADU dimension rule - confirm the current figure with the Zoning Officer.. Owner-occupancy is required: Required - either the ADU or the primary dwelling unit must be the primary domicile of the person or entity that owns the property; on a two-family lot the owner must occupy one of the units or the ADU (§347-8 D(1)). The owner must file an affidavit of continued compliance every year by January 1 or the ADU's certificate of occupancy is revoked (§347-8 E(6)).

How much does an ADU cost in Montclair?

ADU construction in Montclair typically costs $200,000-$400,000. Garage conversions run $95,000-$200,000, and prefab ADUs cost $150,000-$250,000 installed.

How much can I rent an ADU for in Montclair?

Average ADU rents in Montclair are $2,400-$2,700/mo for a 1-bedroom and $2,900-$3,400/mo for a 2-bedroom unit.

Do I need parking for an ADU in Montclair?

At least one off-street parking space for the ADU (§347-8 D(13)), in addition to the parking required for the main house; accessory parking areas may not sit between the house and the street (R-O §347-34 B, applied to R-1 by §347-46 C).. Check with Montclair planning department for the latest New Jersey ADU parking rules, as many states have relaxed requirements in recent years.

How long does it take to get an ADU permit in Montclair?

The permit review timeline in Montclair is Zoning decision within 20 business days: the Zoning Officer must meet you within 10 business days of a complete application and decide within 10 business days after the meeting (§347-8 E(1)(d)). Construction-permit review times are not published; work must start within 2 years of approval.. Fees range from $50 ADU zoning permit fee, by check or money order (Township ADU Zoning Permit Application, unchanged since 2023). Construction permits and the ADU certificate of occupancy are charged under the township's current UCC fee schedule (§347-8 E(5)(b)) - ask the Building Department for figures.

Ready to Build in Montclair?

Get free, no-obligation quotes from top-rated ADU contractors in Montclair.

Get Free Quotes →

Build ADUs in Montclair?

Homeowners read this page while planning, then ask us to connect them with a local builder. We pass those requests to builders who cover Montclair — a flat fee only on the leads you accept, no subscription, and you contract directly with the homeowner.

See who's waiting in New Jersey →

ADU Guides for Montclair Homeowners

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.