Builder Guide

ADU Builders in Jacksonville, FL (2026)

What ADU builders cost in Jacksonville, how to choose one, the questions to ask — plus free, no-obligation quotes from independent local contractors (verify license and insurance before hiring).

Build cost: $150,000-$300,000 Permit timeline: The city publishes no review clock for residential plan review; JaxEPICS returns comments once every discipline has reviewed the set. A permit expires after 180 days without work (Building Inspection Division FAQ). Free quotes

An ADU builder in Jacksonville is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through Jacksonville's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in Florida.

What ADU Builders Cost in Jacksonville [14][15][16]

Based on our Jacksonville cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.

New Detached ADU (all-in)$150,000-$300,000
Cost per Sq Ft$150-$360
Garage Conversion$65,000-$130,000
Prefab / Modular ADU (installed)$125,000-$200,000
City Permit & Plan ReviewBuilding permit fees are set by Ordinance Code Chapter 320 on the gross floor area under roof, plus separate electrical, plumbing and mechanical permit fees; the city publishes no ADU-specific figure, so price it in JaxEPICS or with the Building Inspection Division (904-255-8500).
Impact FeesJacksonville's transportation Mobility Fee (Ordinance Code Ch. 655) is charged on new development that adds trips and must be paid before the vertical building permit issues; exemptions are listed in Sec. 655.109 and de minimis uses in Sec. 655.108. Ask the Concurrency and Mobility Management System Office (CMMSO@coj.net) whether a single ADU is exempt or de minimis before budgeting, and ask JEA about connection charges if the unit gets its own water or sewer service.

For a full line-item breakdown, see our Jacksonville ADU cost guide. To confirm what you're allowed to build before you hire, review the Jacksonville ADU rules (max detached size: Building footprint capped at the lesser of 25% of the principal house's gross floor area or 750 sq ft (Sec. 656.403(g)(3)): a 2,000 sq ft house allows a 500 sq ft footprint, a 3,000 sq ft house the full 750 sq ft. The cap is on footprint, not floor area, and the unit must be behind the house and outside all required yards ((g)(1), (g)(4)).; owner-occupancy: Required in effect: the lot must carry an existing Duval County homestead exemption, or qualify for one that the owner has applied for through the Property Appraiser (Sec. 656.403(g)(6)), which makes the property the owner's permanent residence. Ordinance 2024-870 as filed would have deleted this rule; the Land Use and Zoning Committee struck that section on January 7, 2025 and the ordinance enacted January 14, 2025 left (g)(6) intact.).

Get Free ADU Quotes in Jacksonville

Tell us about your project and we'll pass it to ADU builders serving Jacksonville. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

How to Vet an ADU Builder in Jacksonville

  • License: Confirm a current contractor's license in Florida and that it's in good standing. Ask for the license number and verify it with the state board.
  • ADU-specific experience: Ask how many ADUs they've completed in or near Jacksonville and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
  • Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
  • Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
  • Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits (Building permit fees are set by Ordinance Code Chapter 320 on the gross floor area under roof, plus separate electrical, plumbing and mechanical permit fees; the city publishes no ADU-specific figure, so price it in JaxEPICS or with the Building Inspection Division (904-255-8500).), plan check (Electronic plan review in JaxEPICS by every discipline, including the fire marshal; the Florida Building Code 8th Edition (2023) and NEC 2020 apply. Lots in a FEMA flood zone are also reviewed by Development Services' Review Group.), and impact fees (Jacksonville's transportation Mobility Fee (Ordinance Code Ch. 655) is charged on new development that adds trips and must be paid before the vertical building permit issues; exemptions are listed in Sec. 655.109 and de minimis uses in Sec. 655.108. Ask the Concurrency and Mobility Management System Office (CMMSO@coj.net) whether a single ADU is exempt or de minimis before budgeting, and ask JEA about connection charges if the unit gets its own water or sewer service.) are included.
  • Permit handling: Confirm they manage Jacksonville's permit process ("Building permit only, no zoning hearing: apply online in JaxEPICS (jaxepics.coj.net) to the Building Inspection Division (214 N. Hogan St., Room 280, 904-255-8500); zoning review happens inside the permit, and the application carries a mandatory certification that no deed restriction or HOA, neighborhood or master association rule bars an ADU (Sec. 656.403(g)(8)). Zoning questions: Zoning Section, Ed Ball Building Suite 300, 904-255-8300. A homeowner may pull the permit personally only for property for their own use that is not for sale or lease (owner's affidavit plus proof of homestead), so a unit built to rent should be permitted by a licensed contractor.", typically The city publishes no review clock for residential plan review; JaxEPICS returns comments once every discipline has reviewed the set. A permit expires after 180 days without work (Building Inspection Division FAQ).) and who is responsible if revisions are required.
  • Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.

Questions to Ask Before You Hire

  • How many ADUs have you built in Jacksonville in the last two years?
  • Is your bid fixed-price, and what would trigger a change order?
  • Are permits, plan check, and utility connection fees included?
  • What's a realistic timeline, including permit review (The city publishes no review clock for residential plan review; JaxEPICS returns comments once every discipline has reviewed the set. A permit expires after 180 days without work (Building Inspection Division FAQ).) and construction?
  • Who is my point of contact and how are delays communicated?
  • What warranty do you provide on workmanship?
  • Can you share three recent Florida ADU client references?

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Are you an ADU builder? Get Jacksonville leads

Homeowners on this page submit real ADU project requests in Jacksonville. Each one goes to up to five local builders — that is what the homeowner agrees to — so claiming never takes it from anyone and there is no bidding. In practice far fewer ever make contact, which is why the number is five rather than three. A flat $50 only on the leads you accept: no subscription, no contract, and you deal with the homeowner directly.

Get Jacksonville ADU Leads →

Frequently Asked Questions

How much do ADU builders charge in Jacksonville?

ADU builders in Jacksonville typically quote $150,000-$300,000 for a new detached unit, or about $150-$360 per square foot, including design, permitting, and construction. A garage conversion runs $65,000-$130,000 and a prefab/modular ADU averages $125,000-$200,000. Add city permit and plan-review fees (Building permit fees are set by Ordinance Code Chapter 320 on the gross floor area under roof, plus separate electrical, plumbing and mechanical permit fees; the city publishes no ADU-specific figure, so price it in JaxEPICS or with the Building Inspection Division (904-255-8500).) plus impact fees of Jacksonville's transportation Mobility Fee (Ordinance Code Ch. 655) is charged on new development that adds trips and must be paid before the vertical building permit issues; exemptions are listed in Sec. 655.109 and de minimis uses in Sec. 655.108. Ask the Concurrency and Mobility Management System Office (CMMSO@coj.net) whether a single ADU is exempt or de minimis before budgeting, and ask JEA about connection charges if the unit gets its own water or sewer service.. Quotes for the same scope commonly vary 20-40% between builders, so collect at least three bids.

How do I find a good ADU builder in Jacksonville?

Look for a licensed contractor with completed ADU projects in Jacksonville specifically — ADUs involve local zoning, setback rules, and utility connections that general remodelers may not have handled. Verify the license, ask for an ADU-specific portfolio and references, confirm they carry liability and workers' comp insurance, and get a written fixed-price or detailed bid. Submit a request below and we'll forward it to local ADU builders serving Jacksonville for free quotes.

Do ADU builders in Jacksonville handle permits?

Most full-service ADU builders manage the permit process for you. In Jacksonville the approval process is "Building permit only, no zoning hearing: apply online in JaxEPICS (jaxepics.coj.net) to the Building Inspection Division (214 N. Hogan St., Room 280, 904-255-8500); zoning review happens inside the permit, and the application carries a mandatory certification that no deed restriction or HOA, neighborhood or master association rule bars an ADU (Sec. 656.403(g)(8)). Zoning questions: Zoning Section, Ed Ball Building Suite 300, 904-255-8300. A homeowner may pull the permit personally only for property for their own use that is not for sale or lease (owner's affidavit plus proof of homestead), so a unit built to rent should be permitted by a licensed contractor.". The city publishes no review clock for residential plan review; JaxEPICS returns comments once every discipline has reviewed the set. A permit expires after 180 days without work (Building Inspection Division FAQ). Confirm in writing whether permit fees, plan check (Electronic plan review in JaxEPICS by every discipline, including the fire marshal; the Florida Building Code 8th Edition (2023) and NEC 2020 apply. Lots in a FEMA flood zone are also reviewed by Development Services' Review Group.), and impact fees are included in the bid or billed separately.

How long does it take to build an ADU in Jacksonville?

Plan for the permit review (The city publishes no review clock for residential plan review; JaxEPICS returns comments once every discipline has reviewed the set. A permit expires after 180 days without work (Building Inspection Division FAQ). in Jacksonville) plus construction. Most detached ADUs take 4-8 months of construction after permits are issued; garage conversions and prefab units are often faster. Ask each builder for a realistic schedule and what could delay it.

Get Free ADU Builder Quotes in Jacksonville

Compare bids from experienced local Jacksonville ADU builders. Free, no obligation.

Get Free Quotes →

More Florida ADU Rules

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.