Complete 2026 cost breakdown: construction, permits, financing, and expected rental ROI.
Calculate your Bothell ADU cost →Building an ADU in Bothell costs between $235,000-$430,000 for new construction, with per-square-foot costs averaging $290-$480. These figures include design, permitting, site preparation, and construction. The most affordable option is a garage conversion at $110,000-$235,000, while prefab/modular ADUs fall in between at $170,000-$330,000.
| Cost Category | Estimated Range |
|---|---|
| Architectural Plans | $3,000 – $15,000 |
| Permits & Fees | At submittal (2026 fees, from the city's ADU checklist): a plan check fee based on project valuation, a Single Family Planning Review fee of $231.00, and a 5 percent technology fee. At permit issuance: the permit fee, plumbing, mechanical and state fees; a Residential Site Review and Inspection fee of $834.00 where you are constructing an addition or a new building; a stormwater facility charge if you are adding square footage; and the 5 percent technology fee on everything except the state fee, impact fees and facility charges. For a new detached ADU the plumbing and mechanical permit fees are each 8 percent of the building permit fee, 16 percent in total; for a remodel or addition creating an ADU they are a base fee of $82.00 plus a per-fixture fee, most residential fixtures running $27.00 each |
| Impact Fees | Traffic, fire and park impact fees apply to a new dwelling unit, and Bothell has written the state cap into its own code: "The city will not assess impact fees on the construction of accessory dwelling units that are greater than 50 percent of the impact fees that would be imposed on the principal unit" (Bothell Municipal Code 12.14.135(G)), tracking RCW 36.70A.681(1)(a). Current dollar amounts are not published on the ADU checklist — ask Development Services at 425-806-6400 for the impact fee form, and hold them to the 50 percent cap |
| Site Prep & Foundation | $10,000 – $35,000 |
| Framing & Structure | $15,000 – $45,000 |
| Plumbing | $8,000 – $20,000 |
| Electrical | $5,000 – $15,000 |
| HVAC | $3,000 – $8,000 |
| Interior Finishes | $15,000 – $40,000 |
Quotes for the same ADU commonly vary 20–40% between builders. Get up to 5 free quotes from ADU builders serving Bothell — no obligation.
Get Bothell builder quotes →Permit fees in Bothell are At submittal (2026 fees, from the city's ADU checklist): a plan check fee based on project valuation, a Single Family Planning Review fee of $231.00, and a 5 percent technology fee. At permit issuance: the permit fee, plumbing, mechanical and state fees; a Residential Site Review and Inspection fee of $834.00 where you are constructing an addition or a new building; a stormwater facility charge if you are adding square footage; and the 5 percent technology fee on everything except the state fee, impact fees and facility charges. For a new detached ADU the plumbing and mechanical permit fees are each 8 percent of the building permit fee, 16 percent in total; for a remodel or addition creating an ADU they are a base fee of $82.00 plus a per-fixture fee, most residential fixtures running $27.00 each. The review timeline is Confirm with Bothell Development Services at 425-806-6400 — no ADU review timeline is published on the city's ADU submittal checklist. Budget separately for the water and sewer availability certificate, which the checklist puts at up to two weeks where the City of Bothell is the provider, with plan check: Plan check fee is based on project valuation. Plans must be no larger than 24 by 36 inches, drawn to scale, and the site plan must show hard surface coverage calculations under BMC 12.14.140(B), distances from existing and proposed structures to property lines, footing and roof drain location and discharge method, and any environmentally sensitive areas on the site, adjacent to it, or within 200 feet — wetlands, steep slopes, top and toe of slope, rivers and streams. That last item is not busywork: critical areas are what decide whether you get two ADUs or one under BMC 12.14.135(C). New detached ADUs need full Washington State Energy Code compliance worksheets; King County or Snohomish Health District approval is required where the property is on septic and you are adding square footage or bedrooms. Impact fees are Traffic, fire and park impact fees apply to a new dwelling unit, and Bothell has written the state cap into its own code: "The city will not assess impact fees on the construction of accessory dwelling units that are greater than 50 percent of the impact fees that would be imposed on the principal unit" (Bothell Municipal Code 12.14.135(G)), tracking RCW 36.70A.681(1)(a). Current dollar amounts are not published on the ADU checklist — ask Development Services at 425-806-6400 for the impact fee form, and hold them to the 50 percent cap. Pre-approved plans: None found in a City of Bothell source as of September 1, 2026 — the city's ADU submittal checklist assumes a custom set of construction plans and lists no pre-approved plan gallery. Confirm with Development Services at 425-806-6400.
| 1-Bedroom Rent | $1,800-$2,350/month |
| 2-Bedroom Rent | $2,250-$2,950/month |
| Annual Rental Income (est.) | $24,900/year |
| Payback Period (est.) | 13.4 years |
| Short-Term Rental | Confirm with the City of Bothell at 425-806-6400 before you list. No short-term rental chapter of the Bothell Municipal Code could be verified for this entry — the code host blocks automated access — and BMC 12.14.135 itself imposes no minimum tenancy. Bothell's zoning does separately regulate "Rooms for roomers or boarders" as a permitted residential use in every residential zone (BMC 12.06.140(A)). Long-term letting of an ADU is unrestricted: there is no owner-occupancy rule and no cap on renting the unit |
| Overall ROI Estimate | 5-8% annual return |
A typical ADU in Bothell generates approximately $24,900 per year in rental income based on average 1-bedroom rents. At an average construction cost of $332,500, the estimated payback period is 13.4 years — before accounting for the resale value the ADU adds, which an appraiser determines from comparable sales in Bothell and varies by market (often less than build cost).
1. Garage conversions save 40-60% vs new construction since the shell already exists. Average cost in Bothell: $110,000-$235,000.
2. Prefab/modular ADUs offer predictable pricing and faster timelines. Average: $170,000-$330,000.
3. Pre-approved plans — available in Bothell, which can save $3,000-$10,000 in design costs and 2-3 months in review time. See which cities offer pre-approved ADU plans.
4. State grants — California's CalHFA ADU grant (up to $40K) is currently paused; check calhfa.ca.gov/adu for status and your state for active programs.
5. Get multiple bids — ADU contractor pricing varies 20-40% for the same project. We recommend getting at least 3 quotes.
Tell us about your project and we'll connect you with ADU builders serving Bothell. Free, no obligation — you choose who to work with.
🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.
Just browsing? Search ADU builders near you by ZIP code.