Complete 2026 cost breakdown: construction, permits, financing, and expected rental ROI.
Calculate your Redmond ADU cost →Building an ADU in Redmond costs between $255,000-$460,000 for new construction, with per-square-foot costs averaging $310-$510. These figures include design, permitting, site preparation, and construction. The most affordable option is a garage conversion at $125,000-$255,000, while prefab/modular ADUs fall in between at $185,000-$355,000.
| Cost Category | Estimated Range |
|---|---|
| Architectural Plans | $3,000 – $15,000 |
| Permits & Fees | Confirm current building permit and plan review amounts with Redmond Development Services at 425-556-2494 — the fee schedule is not part of the zoning code and the city's fee page could not be retrieved for this entry |
| Impact Fees | Capped by state law at 50 percent of the impact fees that would be imposed on the principal unit: "The city or county may not assess impact fees on the construction of accessory dwelling units that are greater than 50 percent of the impact fees that would be imposed on the principal unit" (RCW 36.70A.681(1)(a)). For scale, Redmond's adopted schedules for a single-family residence are $148.78 fire, $6,778.37 park and $5,972.00 school per housing unit, plus a transportation impact fee of $10,022.14 per dwelling unit for Single-Family Detached ($7,604.20 in Centers) or $5,757.40 for Middle Housing ($4,368.37 in Centers) (Redmond Municipal Code 3.10, as amended by Ordinance 3217, approved June 17, 2025). Which land-use category Redmond applies to an ADU is not stated in the schedule — ask Development Services, and cite the 50 percent cap if the quote looks high |
| Site Prep & Foundation | $10,000 – $35,000 |
| Framing & Structure | $15,000 – $45,000 |
| Plumbing | $8,000 – $20,000 |
| Electrical | $5,000 – $15,000 |
| HVAC | $3,000 – $8,000 |
| Interior Finishes | $15,000 – $40,000 |
Quotes for the same ADU commonly vary 20–40% between builders. Get up to 5 free quotes from ADU builders serving Redmond — no obligation.
Get Redmond builder quotes →Permit fees in Redmond are Confirm current building permit and plan review amounts with Redmond Development Services at 425-556-2494 — the fee schedule is not part of the zoning code and the city's fee page could not be retrieved for this entry. The review timeline is Confirm with Redmond Development Services at 425-556-2494 — no ADU-specific review timeline is published in the zoning code, and the city's own permit pages could not be retrieved for this entry (www.redmond.gov blocks automated access). Redmond adopted Ordinance 3174 in 2024 to conform its permit review procedures to Washington's SB 5290 permit-timeline law, so statutory review clocks apply; ask which category your application falls into, with plan check: Standard building plan review; no ADU-specific plan check process appears in the zoning code. Where an ADU is created inside an existing structure, expect the Building Official to look at the ceiling-height waiver at RZC 21.04.1110.C.6. Note that Redmond's code does not itself carry the state's conversion protection — RCW 36.70A.681(1)(j) requires a city to allow ADUs converted from existing structures, detached garages included, even where they violate current code requirements for setbacks or lot coverage, while RZC 21.04.1110.C.2.b still says detached ADUs "must each conform to all lot coverage restrictions." If you are converting a garage that does not meet today's setbacks, cite the statute. Impact fees are Capped by state law at 50 percent of the impact fees that would be imposed on the principal unit: "The city or county may not assess impact fees on the construction of accessory dwelling units that are greater than 50 percent of the impact fees that would be imposed on the principal unit" (RCW 36.70A.681(1)(a)). For scale, Redmond's adopted schedules for a single-family residence are $148.78 fire, $6,778.37 park and $5,972.00 school per housing unit, plus a transportation impact fee of $10,022.14 per dwelling unit for Single-Family Detached ($7,604.20 in Centers) or $5,757.40 for Middle Housing ($4,368.37 in Centers) (Redmond Municipal Code 3.10, as amended by Ordinance 3217, approved June 17, 2025). Which land-use category Redmond applies to an ADU is not stated in the schedule — ask Development Services, and cite the 50 percent cap if the quote looks high. Pre-approved plans: None found in a City of Redmond source as of September 1, 2026. Neighbouring Kirkland runs a pre-approved detached ADU plan gallery; no equivalent Redmond programme appears in the zoning code, and the city's own pages could not be retrieved for this entry. Confirm with Planner on Call at 425-556-2494 before assuming you must pay for a full custom set.
| 1-Bedroom Rent | $2,050-$2,700/month |
| 2-Bedroom Rent | $2,600-$3,400/month |
| Annual Rental Income (est.) | $28,500/year |
| Payback Period (est.) | 12.5 years |
| Short-Term Rental | Confirm with the City of Redmond before you list. Redmond's zoning code treats bed and breakfast inns and boarding houses as a separate, limited use in the neighborhood zones (RZC 21.04.0100, note 2: no more than eight rental rooms), but no short-term rental chapter of the Redmond Municipal Code could be retrieved for this entry — www.redmond.gov and the hosted municipal code both block automated access. A city business licence is the usual starting point. Long-term letting of an ADU is unrestricted: the owner-occupancy and rental limits in the repealed RZC 21.08.220 are gone |
| Overall ROI Estimate | 5-7% annual return |
A typical ADU in Redmond generates approximately $28,500 per year in rental income based on average 1-bedroom rents. At an average construction cost of $357,500, the estimated payback period is 12.5 years — before accounting for the resale value the ADU adds, which an appraiser determines from comparable sales in Redmond and varies by market (often less than build cost).
1. Garage conversions save 40-60% vs new construction since the shell already exists. Average cost in Redmond: $125,000-$255,000.
2. Prefab/modular ADUs offer predictable pricing and faster timelines. Average: $185,000-$355,000.
3. Pre-approved plans — available in Redmond, which can save $3,000-$10,000 in design costs and 2-3 months in review time. See which cities offer pre-approved ADU plans.
4. State grants — California's CalHFA ADU grant (up to $40K) is currently paused; check calhfa.ca.gov/adu for status and your state for active programs.
5. Get multiple bids — ADU contractor pricing varies 20-40% for the same project. We recommend getting at least 3 quotes.
Tell us about your project and we'll connect you with ADU builders serving Redmond. Free, no obligation — you choose who to work with.
🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.
Just browsing? Search ADU builders near you by ZIP code.