New Construction
$180,000-$350,000
Garage Conversion
$120,000-$200,000
Prefab ADU
$100,000-$180,000
Cost Per Sq Ft
$300-$350

Construction Cost Breakdown

Building an ADU in Salt Lake City costs between $180,000-$350,000 for new construction, with per-square-foot costs averaging $300-$350. These figures include design, permitting, site preparation, and construction. The most affordable option is a garage conversion at $120,000-$200,000, while prefab/modular ADUs fall in between at $100,000-$180,000.

Cost CategoryEstimated Range
Architectural Plans$3,000 – $15,000
Permits & Fees$2,000-$4,000 estimated
Impact FeesUtility connection fees apply
Site Prep & Foundation$10,000 – $35,000
Framing & Structure$15,000 – $45,000
Plumbing$8,000 – $20,000
Electrical$5,000 – $15,000
HVAC$3,000 – $8,000
Interior Finishes$15,000 – $40,000

Permit Costs & Timeline

Permit fees in Salt Lake City are $2,000-$4,000 estimated. The review timeline is 2-8 weeks for approval; 7-9 weeks for construction after permit issued; 3+ months total typical, with plan check taking approximately Included in 2-8 week timeline. Impact fees are Utility connection fees apply. Pre-approved plans: City offers ADU standard plans; ADU Handbook available.

Rental Income & ROI

Investment Returns

1-Bedroom Rent$1,200-$1,600/month
2-Bedroom Rent$1,600-$2,200/month
Annual Rental Income (est.)$16,800/year
Payback Period (est.)15.8 years
Short-Term RentalRestricted; long-term preferred
Overall ROI Estimate8-12 year payback; property value increase 20-35%

A typical ADU in Salt Lake City generates approximately $16,800 per year in rental income based on average 1-bedroom rents. At an average construction cost of $265,000, the estimated payback period is 15.8 years — before accounting for property value appreciation, which typically adds 20-35% to home value.

Ways to Reduce ADU Costs in Salt Lake City

1. Garage conversions save 40-60% vs new construction since the shell already exists. Average cost in Salt Lake City: $120,000-$200,000.

2. Prefab/modular ADUs offer predictable pricing and faster timelines. Average: $100,000-$180,000.

3. Pre-approved plans (City offers ADU standard plans; ADU Handbook available) can save $3,000-$10,000 in design costs and 2-3 months in review time.

4. State grants — California's CalHFA program offers up to $40K. Check your state for available programs.

5. Get multiple bids — ADU contractor pricing varies 20-40% for the same project. We recommend getting at least 3 quotes.

Get Free ADU Quotes in Salt Lake City

Compare prices from pre-screened ADU contractors in your area. Free, no-obligation estimates.

Find ADU Contractors →

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Join 5,000+ homeowners and investors.