Key Colorado ADU Laws
Colorado ADU Laws
- Who is covered: a 'subject jurisdiction' is a municipality of 1,000 or more inside a metropolitan planning organization (Denver, Boulder, Colorado Springs, Fort Collins and the Front Range suburbs), or the part of a county inside a census-designated place of 40,000+ within an MPO (HB 24-1152, C.R.S. 29-35-102(21)); other towns and rural counties keep full local control
- One ADU by administrative approval wherever single-unit detached homes are allowed, from June 30, 2025 (29-35-103(1))
- Parking: no new off-street space may be required for an ADU; a jurisdiction may require an existing driveway or garage space to be designated, and may require one new space only in narrow cases (29-35-103(2)(a), (3)(a)–(b)) — Denver and Boulder dropped ADU parking by their own ordinances
- Owner-occupancy: may not be required, except that the owner may have to show residence on the parcel when applying (not when the ADU is built with a new house) or for a short-term-rental licence (29-35-103(2)(b))
- Design and dimension floors: no architectural, material or landscaping rule stricter than for a house; ADUs of 500–750 sq ft must be allowed; side setbacks no larger than the house's and rear setbacks no larger than the greater of 5 ft or other accessory buildings; no stricter minimum lot size (29-35-102(18))
- Still local: impact fees (29-35-103(3)(f)) and short-term-rental rules (3)(g); HOAs may not prohibit ADUs (38-33.3-106.5(4)); DOLA certifies 'ADU supportive jurisdictions' for state financing programs
What changed recently in Colorado
Gathered from the 3 cities below, with the bill or ordinance each one names. Statewide measures are listed once with the cities they reached, rather than repeated for each.
Statewide
- June 30, 2025: Colorado HB 24-1152 duties took effect for subject jurisdictions, including Colorado Springs; the UDC's ban on short-term rentals on ADU lots grandfathers only lots that held both permits by this date (7.3.304.A.4.d). — cited by Colorado Springs, Denver
City by city
- Denver: Sept 20, 2026 re-verification against DZC Articles 3, 4, 5 and 11 (amended through May 7, 2026): max height corrected to 2 stories/24 ft (1 story/17 ft Option A in S-SU and E-SU); owner-occupancy corrected (still required at permit application in SU districts, DZC 11.8.2.2.B); parking attributed to Denver's own Aug 11, 2025 amendment; unsupported pre-approved-plan, 15 ft separation and 650 sq ft claims removed
- Boulder: 2026-09-20: entry re-verified against Ordinance 8650, Ordinance 8745, the city ADU Guide, the Residential Accessory Structure Guide and the 2026 P&DS Schedule of Fees; allowed zones, setbacks, fees and impact fees rewritten from those sources and the affordable-ADU 'fee waiver' claim dropped (no such waiver in the code or fee schedule).
- Colorado Springs: 2026-09-20: Entry re-verified against UDC 7.3.304.E as codified through Ord. 26-23 (June 9, 2026): rear setback corrected to 5 ft (page said 12 ft), one added parking space is required (page said none), the unsupported 700 sq ft 'JADU' figure was removed, and fees were rebuilt from the 2026 City, PPRBD and park schedules.
- Boulder: Aug. 1, 2025: the 2024 International Codes with Boulder amendments (Ordinance 8684) and the 2024 Wildland Urban Interface Code (Ordinance 8695) apply to new ADU permits; AMPS Ordinance 8696 revised off-street parking standards from Aug. 23, 2025 (the ADU requirement was already 0).
- Colorado Springs: Jan 1, 2026: New City Development Review Enterprise fees (Res. 191-25, adopted Nov 25, 2025): $180 new residential / $130 addition plan review; 2026 Citywide Development Impact fee $766 per single-family unit, $624 per unit in 2-4 unit structures (AR 2025-08).
- Boulder: June 20, 2026: Ordinance 8745 (Omnibus code amendment, adopted May 21, 2026) adds a utilities standard to 9-6-3(n): the ADU shares utility hookups and meters with the main house unless a separate hookup is approved under the Design and Construction Standards.
- Colorado Springs: April 8, 2025: City Council adopted Ord. 25-45, repealing the old ADU and Accessory Family Suite rules and enacting UDC 7.3.304.E: ADUs allowed wherever single-family homes are, no minimum lot size, no owner-occupancy covenant, administrative approval.
- Boulder: Oct. 1, 2026: HUD's FY2027 Fair Market Rents took effect and fell in Boulder - Small Area FMRs for ZIPs 80301-80305 are now $1,810-$2,040 for a 1-bedroom and $2,120-$2,390 for a 2-bedroom (about $100-$140 lower than FY2026).
- Denver: Aug 17, 2026: DOTI sewer use & drainage permit (SUDP) residential requirements revised - $425 application fee, $150 connection inspection; shared water service avoids a sanitary connection fee for the ADU
- Denver: Oct. 1, 2026: HUD's FY2027 Fair Market Rents took effect - Denver County 1-bedroom $1,831 and 2-bedroom $2,169 (up from $1,754 and $2,089), inside the rent ranges shown here.
- Colorado Springs: July 1, 2025: Park fee-in-lieu rose to $2,155 per unit for single-unit structures and $1,748 for 2-4 unit structures (Ord. 25-04; Res. 09-25).
- Boulder: Sept. 1, 2023: Ordinance 8571 made ADUs a building-permit-only approval (no administrative review) and removed neighborhood saturation caps.
- Denver: July 1, 2026: Denver Water's ADU system development charge rose from $2,055 to $2,170 (schedule now adjusted annually by PPI)
- Denver: Aug 11, 2025: Modernizing Parking Requirements text amendment removed minimum vehicle parking citywide, including for ADUs
What the rules actually look like across Colorado
Statewide law sets a floor; the numbers that decide your project are local. Here is the spread across the 3 Colorado cities covered here, taken from each city's own ordinance rather than a state summary.
| Question | Across Colorado |
| Are ADUs permitted? | 3 of 3 permit them. |
| Detached size cap | Median 800 sq ft, from 750 to 864 sq ft across the 3 cities publishing a numeric cap. |
| Owner-occupancy | Required in none of them. |
| Build cost | $185,000 to $450,000 depending on city and unit type. |
| Easiest and hardest here | Boulder scores 8/10; Colorado Springs scores 7/10. |
Recomputed whenever a city page changes, so this and the city pages below cannot disagree.
ADUs in Colorado: common questions
Can I build an ADU in Colorado?
3 of the 3 Colorado cities we cover permit ADUs. Whether yours is allowed depends on your city’s code and your lot; the table below links to each city.
How big can an ADU be in Colorado?
Detached size caps run from 750 to 864 sq ft across the 3 Colorado cities that publish a number; the median is 800 sq ft. Many cities also cap an ADU at a share of the main house.
Do I have to live on the property to build an ADU in Colorado?
None of the cities we cover require the owner to live on site.
How much does it cost to build an ADU in Colorado?
$185,000 to $450,000 depending on the city and the type of unit, from each city’s own cost guide.
How do I get an ADU permit in Colorado?
You apply to your city’s building department for a building permit (or to the county, if the lot is outside city limits). Each city page lists its own process, fees and published review times.
Steps to build an ADU in Colorado
- Confirm who sets the rules for your lot: the city, or the county if you are outside city limits.
- Check your city’s size cap, setbacks and height in the table below or on its city page.
- Check any HOA rules that apply to your property.
- Get plans drawn, or use a pre-approved plan where your city offers one.
- Apply for a building permit; the city page lists the fees and published review times.
- Build, pass the inspections, and get final sign-off before anyone moves in.
Colorado Cities ADU Comparison
| City | Max Size | Setbacks | Permit Fees | Build Cost | 1BR Rent | Score |
| Boulder |
800 sq ft of floor area (BRC 9-6-3(n), Table 6-3); 1,000 sq ft for an affordable ADU (rent capped at 75% of area median income under a recorded declaration of use) or on a designated historic property. Floor area is measured to the outside of the exterior walls per Ch. 9-16 and includes stairways; space under a 6 ft ceiling is excluded. |
Detached ADU (an accessory building) in RL-1, RL-2, RM-1, RM-2, RMX-1, RE and RR: 0 or 3 ft from the rear lot line (Table 7-1; a 0 ft setback needs a maintenance easement recorded with the neighbor unless the lot backs an alley or street), and 6 ft from any other building. Attached ADU: the principal rear setback can drop to 5 ft where only ADU floor area sits in the setback, that part is no taller than 20 ft and, in RR/RE/RL/RMX-1, covers no more than 500 sq ft (9-6-3(n)(2)(B), Ord. 8650). |
Valuation-based (2026 schedule): $1,059 + $5.95 per $1,000 over $100,000, plus 25% plan check and $83.90 energy fee: about $1,700 for an 800 sq ft unit at the city's $170.80/sq ft floor, about $2,900 on a $300,000 contract. Use tax, trade permits, impact fees and excise tax are extra. |
$200,000-$450,000 |
$1,800-$2,400/mo |
8/10 |
| Colorado Springs |
50% of the principal dwelling's floor area or 1,250 sq ft, whichever is less; if the principal dwelling is under 1,500 sq ft the ADU may be 750 sq ft. ADU floor area does not count toward the lot's accessory-structure floor-area cap (7.3.304.E.2.a). |
5 ft for a detached ADU. The code caps the rear setback at the lesser of the district's accessory-building rear setback or 5 ft, so the City cannot require more (7.3.304.E.2.c(2)). |
PPRBD permit is valuation-based ($45.65 per sq ft in 2025-26): about $345 for a 750 sq ft unit or $505 for 1,250 sq ft, plus a 28% plan-examination fee. City DRE plan review $180 (new structure) or $130 (addition) plus $25 IT fee (Res. 191-25, eff. Jan 1, 2026). No separate land-use application fee. |
$185,000-$420,000 |
$1,350-$1,800/mo |
7/10 |
| Denver |
SU districts: ADU gross floor area 864 sq ft on lots of 7,000 sq ft or less, 1,000 sq ft on larger lots (DZC 11.8.2.1.B.2); the detached ADU building footprint is capped at the same 864/1,000 sq ft (e.g., DZC 5.3.4.5.A). Other districts: 1,000 sq ft footprint per unit, GFA not separately capped. |
U- districts: 5 ft, or 0 ft where an alley abuts the rear line and no garage door faces it. E-SU: 5 ft where an alley or street abuts the rear; otherwise 5 ft (1-story) or 12 ft (2-story). S-SU: 10 ft (1-story) or 20 ft (2-story). The detached ADU must sit in the rear 35% of lot depth (U-, E-) or rear 50% (S-) (DADU building form tables). |
Building permit is valuation-based: $770 + $5.60 per $1,000 over $100,000 (about $1,330 at $200,000) plus a 50% plan-review fee; zoning permit $150 + $0.50 per $1,000; SUDP $425 application + $150 inspection; Denver Water ADU system development charge $2,170 (from Jul 1, 2026). |
$200,000-$450,000 |
$1,650-$2,000/mo |
8/10 |
Finance Your ADU Project
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more