Compare ADU zoning rules across 1 District of Columbia cities. Average ADU score: 7.0/10.
Gathered from the 1 city below, with the bill or ordinance each one names. Statewide measures are listed once with the cities they reached, rather than repeated for each.
Statewide law sets a floor; the numbers that decide your project are local. Here is the spread across the 1 District of Columbia city covered here, taken from each city's own ordinance rather than a state summary.
| Question | Across District of Columbia |
|---|---|
| Are ADUs permitted? | 1 of 1 permit them. |
| Detached size cap | Median 450 sq ft, from 450 to 450 sq ft across the 1 cities publishing a numeric cap. |
| Owner-occupancy | Required in 1 of 1. |
| Build cost | $150,000 to $550,000 depending on city and unit type. |
Recomputed whenever a city page changes, so this and the city pages below cannot disagree.
1 of the 1 District of Columbia city we cover permit ADUs. Whether yours is allowed depends on your city’s code and your lot; the table below links to each city.
Detached size caps run from 450 to 450 sq ft across the 1 District of Columbia cities that publish a number; the median is 450 sq ft. Many cities also cap an ADU at a share of the main house.
1 of the 1 cities we cover require it; the rest do not. Check the city page for yours.
$150,000 to $550,000 depending on the city and the type of unit, from each city’s own cost guide.
You apply to your city’s building department for a building permit (or to the county, if the lot is outside city limits). Each city page lists its own process, fees and published review times.
| City | Max Size | Setbacks | Permit Fees | Build Cost | 1BR Rent | Score |
|---|---|---|---|---|---|---|
| Washington | Accessory-building footprint: the greater of 650 sq ft or 30% of the required rear yard in R-1/R-2, 550 sq ft in R-3 and the RF zones (D §5003, E §5003; raised from 450 sq ft on 7/10/2026). It counts toward the 40% lot occupancy (60% for an R-3 row house, D §210.1), may hold one dwelling unit and no roof deck (U §253.8(e)). | Accessory building: at least 7.5 ft from the centerline of any alley, 3 ft from a rear lot line that does not abut an alley or street, and no more than 30% of the required rear yard may be occupied by accessory buildings (D §5004.1, as amended 7/10/2026). The house itself needs a 25 ft rear yard in R-1 and 20 ft in R-2/R-3 (D §207.1). | New construction: $0.03 per cu ft of building plus a 10% enhanced fee and a $0.002/sq ft Green Building Fee. Alterations such as a basement conversion: $30 + 2% of construction value plus 10%, and a 0.13% green fee; a 50% filing deposit is paid up front (DOB Building Permit Fee Schedule). | $150,000-$550,000 | $1,500-$3,300/mo | 7/10 |
Tell us about your project and we'll pass it to ADU builders serving District of Columbia.Get free quotes from local ADU builders serving District of Columbia. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.
We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.
🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.
Just browsing? Search ADU builders near you by ZIP code.
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.