Minnesota ADU Laws & Rules (2026)

Compare ADU zoning rules across 2 Minnesota cities. Average ADU score: 9.0/10.

Avg Score: 9.0/102 Cities

Key Minnesota ADU Laws

Minnesota ADU Overview

  • 2 cities currently covered with detailed ADU zoning data
  • Average ADU-friendliness score: 9.0/10
  • Rules vary by city — check individual city pages for details
  • We're actively expanding coverage in Minnesota

What changed recently in Minnesota

Gathered from the 2 cities below, with the bill or ordinance each one names. Statewide measures are listed once with the cities they reached, rather than repeated for each.

City by city

What the rules actually look like across Minnesota

Statewide law sets a floor; the numbers that decide your project are local. Here is the spread across the 2 Minnesota cities covered here, taken from each city's own ordinance rather than a state summary.

QuestionAcross Minnesota
Are ADUs permitted?2 of 2 permit them.
Detached size capMedian 800 sq ft, from 800 to 800 sq ft across the 2 cities publishing a numeric cap.
Owner-occupancyRequired in 1 of 2.
Build cost$125,000 to $465,000 depending on city and unit type.
Easiest and hardest hereMinneapolis scores 9/10; Saint Paul scores 9/10.

Recomputed whenever a city page changes, so this and the city pages below cannot disagree.

ADUs in Minnesota: common questions

Can I build an ADU in Minnesota?

2 of the 2 Minnesota cities we cover permit ADUs. Whether yours is allowed depends on your city’s code and your lot; the table below links to each city.

How big can an ADU be in Minnesota?

Detached size caps run from 800 to 800 sq ft across the 2 Minnesota cities that publish a number; the median is 800 sq ft. Many cities also cap an ADU at a share of the main house.

Do I have to live on the property to build an ADU in Minnesota?

1 of the 2 cities we cover require it; the rest do not. Check the city page for yours.

How much does it cost to build an ADU in Minnesota?

$125,000 to $465,000 depending on the city and the type of unit, from each city’s own cost guide.

How do I get an ADU permit in Minnesota?

You apply to your city’s building department for a building permit (or to the county, if the lot is outside city limits). Each city page lists its own process, fees and published review times.

Steps to build an ADU in Minnesota

  1. Confirm who sets the rules for your lot: the city, or the county if you are outside city limits.
  2. Check your city’s size cap, setbacks and height in the table below or on its city page.
  3. Check any HOA rules that apply to your property.
  4. Get plans drawn, or use a pre-approved plan where your city offers one.
  5. Apply for a building permit; the city page lists the fees and published review times.
  6. Build, pass the inspections, and get final sign-off before anyone moves in.

Minnesota Cities ADU Comparison

CityMax SizeSetbacksPermit FeesBuild Cost1BR RentScore
Minneapolis 1,300 sq ft gross floor area on all levels (garage space counts) or 16% of lot area, whichever is greater; never more than 1,600 sq ft or larger than the main house. Separately, the combined footprint of the ADU, every other detached accessory building and any attached garage is capped at 800 sq ft or 10% of lot area, whichever is greater (550.1460(2)-(3)). Detached: may be reduced to 3 ft, except no reduction on a side where vehicle-access doors face the rear lot line, and at least 5 ft from a rear lot line that coincides with the side lot line of a lot in an urban neighborhood or residential mixed-use district (550.1460(5)-(6)). Internal/attached: the district's rear-yard setback applies. $325 zoning application, plus a valuation-based building permit: about $3,200-$5,400 on $150,000-$300,000 of work (permit fee + 65% plan-review fee + 0.05% state surcharge, 2026 schedule). Plumbing, mechanical and electrical permits are separate. $150,000-$465,000 $1,250-$1,700/mo 9/10
Saint Paul 800 sq ft or 75% of the floor area of the principal dwelling, whichever is greater (Sec. 65.913(d)). Floor area is measured from the interior faces of the exterior walls (Sec. 60.207); DSI asks for the main house's floor plans with the permit to check the 75%. All buildings together must also stay under the district lot-coverage cap: 40% RL, 45% H1, 50% H2 (Table 66.231). Detached ADU: may sit in the required rear yard; 1 ft minimum from an alley right-of-way, otherwise 3 ft from the rear (interior) lot line (Sec. 63.501(b)). The 3 ft interior-line setback is waived with a recorded maintenance easement if the building stays 3 ft from any building next door. Attached ADU: the house's rear setback, 10 ft in RL, H1 and H2 (Table 66.231). Valuation-based (Sec. 33.04; schedule effective 2/25/2023): $1,499 for the first $100,000 plus $8 per additional $1,000, a plan-check fee of 65% of that, and the 0.05% state surcharge — about $3,200 on a $150,000 ADU and $5,300 on $300,000, before trade permits and any SAC. $125,000-$350,000 $1,270-$1,630/mo 9/10

Get Free ADU Quotes in Minnesota

Tell us about your project and we'll pass it to ADU builders serving Minnesota.Get free quotes from local ADU builders serving Minnesota. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add budget (optional — helps builders scope the right design)

We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Compare HELOC Rates Construction Loans All Options →

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.