ADU Rules in Upland, California

Complete guide to building an Accessory Dwelling Unit in Upland — zoning, setbacks, permits, costs, and more.

Max Size: 850 sq ft (studio/1-bedroom); 1,000 sq ft (2+ bedrooms); an 800 sq ft ADU can never be precluded by lot coverage, FAR, or open-space standards Setbacks: 4 ft minimum; none for same-location/same-dimension rebuilds Parking: 1 Space Verified: 2026-08-09
ADU Score: 6/10
Moderately friendly · how we score

Are ADUs allowed in Upland, CA? [1][2][3]

Yes. Upland allows ADUs on most residential lots. A detached unit can be up to 850 sq ft, set 4 ft back from the rear line. One off-street space is required. Owner-occupancy is not required, so the unit can be rented out. A building permit is required and applications are reviewed administratively, without a public hearing.

Maximum size850 sq ft (studio/1-bedroom); 1,000 sq ft (2+ bedrooms); an 800 sq ft ADU can never be precluded by lot coverage, FAR, or open-space standards
SetbacksRear 4 ft minimum; none for same-location/same-dimension rebuilds · Side 4 ft minimum; 15 ft on the street side of corner lots
Parking1 space per ADU (tandem/setback areas OK; unenclosed spaces 9x19 ft); waived within 1/2 mile of transit, historic districts, conversions, permit-parking streets, car-share within a block, or when filed with a new dwelling; no replacement parking for demolished garages
Owner-occupancyNot required for ADUs permitted on or after Jan 1, 2020; required for JADUs (deed-restricted)

Do I need a permit to build an ADU in Upland? [4][5][6]

Yes. Every ADU in Upland needs a building permit. Applications are handled administratively — no public hearing.

Permit feesBuilding permit and plan-check fees via the Development Services Department — confirm amounts with Building & Safety, (909) 931-4110
Typical timeline60 days from complete application (SB 543 deemed-approval applies from 2026)

Three things to know before you build in Upland

  • Start at uplandadu.org — the city's official guide walks through concept, costs, permitting, construction, and renting, and includes a cost calculator
  • Use the city's free permit-ready plans to skip most design costs; you only need a site-specific plot plan
  • Keep the ADU 750 sq ft or less of interior livable space to avoid impact fees entirely — at 750+ they scale with your home's floor area

Last verified 2026-08-09 against Upland planning code. How we verify

Upland allows ADUs on any residential or mixed-use lot under Municipal Code Chapter 17.37, holding size caps at the state minimums — 850 sq ft for studio/1-bedroom and 1,000 sq ft for 2+ bedroom units — with 4-ft side/rear setbacks, a general one-story limit for detached units, and zone-based lot-coverage caps. The city offers free permit-ready pre-approved ADU plans and a dedicated step-by-step guide site (uplandadu.org) with a cost calculator. Upland is one of the few California cities with a rent-reporting rule: under Municipal Code § 17.37.050(I), you file a projected-rent estimate with the building permit application and then report the actual rent charged within 90 days after January 1 each year. A Bonus ADU Program (Zoning Code Amendment 25-0007, heard June 17, 2026) that would allow an extra deed-restricted affordable ADU on lots over 15,000 sq ft was still not adopted into the code as of August 2026.

Zoning & Size Requirements [1][2][3]

Yes — Upland allows ADUs. A detached ADU can typically be up to 850 sq ft under current California and Upland zoning rules.

See what this means for your lot — get 3 free quotes from Upland ADU builders →

Allowed ZonesAny lot in a residential or mixed-use zone (building-permit-only path); lots zoned for single-family or multifamily residential use (ADU-permit path); JADUs on single-family lots only
Max Size (Detached)850 sq ft (studio/1-bedroom); 1,000 sq ft (2+ bedrooms); an 800 sq ft ADU can never be precluded by lot coverage, FAR, or open-space standards
Max Size (Attached)850/1,000 sq ft by bedroom count, further limited to 50% of the existing primary dwelling's floor area (never below 800 sq ft)
Max Size (JADU)500 sq ft within the single-family dwelling or attached garage
Max Height16 ft detached (18 ft within 1/2 mile of major transit or on multistory multifamily lots, +2 ft to match primary roof pitch, max 20 ft); attached up to 25 ft or the zone limit, whichever is lower, max 2 stories; detached ADUs limited to one story
Max UnitsSingle-family: 1 ADU + 1 JADU per state framework; multifamily: interior conversions plus detached units per Gov. Code 66323 — confirm allowed combinations with Planning, (909) 931-4130

Setback Requirements [1][2][3]

Upland requires a rear setback of about 4 ft for a detached ADU, and one off-street parking space is required. Owner-occupancy is not required — you can rent it out without living on the property.

Rear Setback4 ft minimum; none for same-location/same-dimension rebuilds
Side Setback4 ft minimum; 15 ft on the street side of corner lots
Front Setback25 ft minimum front-yard setback (waived if it would preclude an 800 sq ft ADU)
Parking Required1 space per ADU (tandem/setback areas OK; unenclosed spaces 9x19 ft); waived within 1/2 mile of transit, historic districts, conversions, permit-parking streets, car-share within a block, or when filed with a new dwelling; no replacement parking for demolished garages
Owner OccupancyNot required for ADUs permitted on or after Jan 1, 2020; required for JADUs (deed-restricted)
Min Lot SizeNo minimum lot size, but lot-coverage caps apply by zone (35% in RS-15/RS-20 up to 50% in RS-4)

Permit Process & Fees [4][5][6]

An ADU permit in Upland goes through a ministerial, by-right review. Typical timeline: 60 days from complete application (SB 543 deemed-approval applies from 2026). Permit fees: Building permit and plan-check fees via the Development Services Department — confirm amounts with Building & Safety, (909) 931-4110.

Approval ProcessMinisterial approval — building permit only for state-exempt units (conversions, one 800 sq ft detached), ADU permit for larger units; deed restriction recorded before certificate of occupancy; rent reporting required under § 17.37.050(I) — a projected annualized rent estimate with the building permit application, then a report of actual rent charged within 90 days after January 1 of each year following permit issuance (miss it and the city may issue a notice of violation with another 30 days to file)
Review Timeline60 days from complete application (SB 543 deemed-approval applies from 2026)
Permit FeesBuilding permit and plan-check fees via the Development Services Department — confirm amounts with Building & Safety, (909) 931-4110
Impact FeesWaived 750 sq ft or less of interior livable space; proportional to primary-dwelling floor area at 750 sq ft and above; water/sewer connection and capacity charges apply to new-construction ADUs (conversions exempt unless built with a new home)
Plan CheckReviewed by Planning (zoning) and Building & Safety (CBC/CRC); design standards require matching materials/roof slope, 12-inch eave overhangs, privacy screening, down-lighting, and drought-tolerant landscaping; roof decks prohibited
Pre-Approved PlansYes — free, permit-ready pre-approved ADU plans for Upland residents; third-party architects may also submit Pre-Approved ADU Templates; site plan still required

Get Free ADU Quotes in Upland

Tell us about your project and we'll connect you with ADU builders serving Upland. Free, no obligation — you choose who to work with.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 3 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

Construction Costs [7][8]

Building an ADU in Upland typically costs $160,000-$300,000 ($200-$350 per sq ft); a garage conversion runs $70,000-$150,000.

See what this means for your lot — get 3 free quotes from Upland ADU builders →

Average Build Cost$160,000-$300,000
Cost per Sq Ft$200-$350
Garage Conversion$70,000-$150,000
Prefab ADU (Installed)$80,000-$180,000

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Rental Income Potential [9][10]

A 2-bedroom ADU in Upland rents for around $2,400-$2,600/mo, an estimated 7-10% annual return (gross rental yield estimate).

Avg Rent (1 Bedroom)$1,950-$2,150/mo
Avg Rent (2 Bedroom)$2,400-$2,600/mo
Short-Term RentalNo — ADUs and JADUs may not be rented for terms under 30 days regardless of when they were built; the city separately regulates short-term rentals via administrative use permit (Ch. 17.23.1)
Est. Annual ROI7-10% annual return (gross rental yield estimate)

Explore Prefab ADU Options

Prefab ADUs can save 20-40% vs. traditional construction and cut build time in half.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Recent Law Changes

What's Changed Recently

  • Ordinance 1993 (April 14, 2025) comprehensively updated Chapter 17.37 and remains the codified version of the chapter
  • HCD found Ordinance 1993 non-compliant with State ADU Law in a findings letter dated July 8, 2025, with a response due August 7, 2025. Whether Upland cured the findings is not publicly confirmed. Under Gov. Code 66326, an ordinance that is not timely cured is void and the city must apply state ADU standards until it adopts a compliant one — so confirm which standards apply to your project with Planning, (909) 931-4130
  • Urgency Ordinance 2007 (Jan 12, 2026) and Ordinance 2009 (Mar 9, 2026) amended Title 17 Part 4 special land use regulations — neither is codified into Chapter 17.37 yet and their ADU effect, if any, is unconfirmed; verify with Planning
  • Bonus ADU Program (Zoning Code Amendment 25-0007) heard June 17, 2026: would allow an additional deed-restricted affordable ADU on residential lots larger than 15,000 sq ft. Still pending as of August 2026 — no adopting ordinance appears in the city's uncodified-ordinance list
  • City launched free permit-ready pre-approved ADU plans and the uplandadu.org step-by-step guide with cost calculator

Tips for Building an ADU in Upland

  • Start at uplandadu.org — the city's official guide walks through concept, costs, permitting, construction, and renting, and includes a cost calculator
  • Use the city's free permit-ready plans to skip most design costs; you only need a site-specific plot plan
  • Keep the ADU 750 sq ft or less of interior livable space to avoid impact fees entirely — at 750+ they scale with your home's floor area
  • Plan for the annual rent report: § 17.37.050(I) requires owners to report the actual rent charged within 90 days after January 1 each year following permit issuance — a signed letter or email to the Planning Division does it. Older city handouts describe a different deadline; the code section is what controls
  • If your lot exceeds 15,000 sq ft, watch the Bonus ADU Program — it could allow a second deed-restricted affordable ADU, but it was still not adopted as of August 2026
  • Detached ADUs are one-story only in Upland — if you need two stories, attach the ADU to the main house (up to 25 ft)

ADU Builders in Upland

Looking for an ADU builder in Upland? ADU projects need a contractor experienced with local zoning, the permit process, and utility connections — not every general contractor has built one. We match Upland homeowners with experienced local ADU contractors who provide free, no-obligation quotes. Getting at least three bids typically saves 20-40% on the same scope.

Frequently Asked Questions

Can I build an ADU in Upland?

Yes. ADUs are allowed in Any lot in a residential or mixed-use zone (building-permit-only path); lots zoned for single-family or multifamily residential use (ADU-permit path); JADUs on single-family lots only in Upland. The maximum size for a detached ADU is 850 sq ft (studio/1-bedroom); 1,000 sq ft (2+ bedrooms); an 800 sq ft ADU can never be precluded by lot coverage, FAR, or open-space standards. Owner-occupancy is not required, so you can rent out the ADU.

How much does an ADU cost in Upland?

ADU construction in Upland typically costs $160,000-$300,000. Garage conversions run $70,000-$150,000, and prefab ADUs cost $80,000-$180,000.

How much can I rent an ADU for in Upland?

Average ADU rents in Upland are $1,950-$2,150/mo for a 1-bedroom and $2,400-$2,600/mo for a 2-bedroom unit.

Do I need parking for an ADU in Upland?

1 space per ADU (tandem/setback areas OK; unenclosed spaces 9x19 ft); waived within 1/2 mile of transit, historic districts, conversions, permit-parking streets, car-share within a block, or when filed with a new dwelling; no replacement parking for demolished garages. Check with Upland planning department for the latest California ADU parking rules, as many states have relaxed requirements in recent years.

How long does it take to get an ADU permit in Upland?

The permit review timeline in Upland is 60 days from complete application (SB 543 deemed-approval applies from 2026). Permit fees: Building permit and plan-check fees via the Development Services Department — confirm amounts with Building & Safety, (909) 931-4110.

Ready to Build in Upland?

Get free, no-obligation quotes from top-rated ADU contractors in Upland.

Get Free Quotes →

Build ADUs in Upland?

Homeowners read this page while planning, then ask us to connect them with a local builder. We pass those requests to builders who cover Upland — a flat fee only on the leads you accept, no subscription, and you contract directly with the homeowner.

See who's waiting in California →

ADU Guides for Upland Homeowners

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-08-09. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.