Cost Guide

How Much Does an ADU Cost in Upland, CA?

Complete 2026 cost breakdown: construction, permits, financing, and expected rental ROI.

Calculate your Upland ADU cost →
New Construction
$175,000-$350,000
Garage Conversion
$75,000-$150,000
Prefab ADU
$120,000-$250,000
Cost Per Sq Ft
$180-$350

Construction Cost Breakdown

Building an ADU in Upland costs between $175,000-$350,000 for new construction, with per-square-foot costs averaging $180-$350. These figures include design, permitting, site preparation, and construction. The most affordable option is a garage conversion at $75,000-$150,000, while prefab/modular ADUs fall in between at $120,000-$250,000.

Cost CategoryEstimated Range
Architectural Plans$3,000 – $15,000
Permits & FeesADU permit fee set by Council resolution (§ 17.37.040(B)); the city's April 2023 guidebook listed $810, plus building permit/plan check typically $3,000-$4,000 and a $189 county fire letter. 2026 amounts not published online; confirm with Building & Safety, (909) 931-4110.
Impact FeesNone for ADUs of 750 sq ft or less of interior livable space (Gov. Code 66311.5; § 17.37.070(A)); at 750 sq ft and above they are charged in proportion to the primary home's floor area (city guidebook: $30,532 for a full-fee ADU in 2023). Conversions on single-family lots pay no water/sewer connection or capacity charge; new-construction ADUs pay a proportionate one (§ 17.37.070(B)). School fees apply from 500 sq ft (Upland USD; $4.08/sq ft in 2023).
Site Prep & Foundation$10,000 – $35,000
Framing & Structure$15,000 – $45,000
Plumbing$8,000 – $20,000
Electrical$5,000 – $15,000
HVAC$3,000 – $8,000
Interior Finishes$15,000 – $40,000

What would this actually cost for your lot?

Quotes for the same ADU commonly vary 20–40% between builders. We pass your request to up to 5 local builders serving Upland, where we have them — free, no obligation.

Get Upland builder quotes →

Permit Costs & Timeline

Permit fees in Upland are ADU permit fee set by Council resolution (§ 17.37.040(B)); the city's April 2023 guidebook listed $810, plus building permit/plan check typically $3,000-$4,000 and a $189 county fire letter. 2026 amounts not published online; confirm with Building & Safety, (909) 931-4110.. The review timeline is 60 days from a complete application, deemed approved if the city does not act (§ 17.37.040(C)); the city's 2023 guidebook adds 15-21 working days for the San Bernardino County Fire residential fire letter. No current published averages., with plan check: Planning checks Chapter 17.37 (zoning, size, setbacks, design); Building & Safety checks the California Building/Residential Codes as amended by Ordinance 2004 (Nov 24, 2025); San Bernardino County Fire issues a residential fire letter ($189 in 2023). Sprinklers only if the main house has them (§ 17.37.050(C)). Applications go through the city's CSS online portal.. Impact fees are None for ADUs of 750 sq ft or less of interior livable space (Gov. Code 66311.5; § 17.37.070(A)); at 750 sq ft and above they are charged in proportion to the primary home's floor area (city guidebook: $30,532 for a full-fee ADU in 2023). Conversions on single-family lots pay no water/sewer connection or capacity charge; new-construction ADUs pay a proportionate one (§ 17.37.070(B)). School fees apply from 500 sq ft (Upland USD; $4.08/sq ft in 2023).. Pre-approved plans: The city's Building & Safety Division publishes a Pre-approved ADU Plans page (last read July 2026); the number of plans, sizes and any plan fee could not be re-verified on Sept 20, 2026 because the city website was unreachable. A site-specific plot plan is still required. Confirm current availability with Building & Safety, (909) 931-4110..

Rental Income & ROI

Investment Returns

1-Bedroom Rent$1,900-$2,250/month
2-Bedroom Rent$2,250-$2,750/month
Annual Rental Income (est.)$24,900/year
Payback Period (est.)10.5 years
Short-Term RentalNo. No ADU or JADU may be rented for a term shorter than 30 days, regardless of when it was built (§ 17.37.050(D)); the city regulates other short-term rentals separately through its Planning Division.
Overall ROI Estimate7-12% gross rental yield (annual rent divided by build cost, before vacancy, taxes and financing)

A typical ADU in Upland generates approximately $24,900 per year in rental income based on average 1-bedroom rents. At an average construction cost of $262,500, the estimated payback period is 10.5 years — before accounting for the resale value the ADU adds, which an appraiser determines from comparable sales in Upland and varies by market (often less than build cost).

Ways to Reduce ADU Costs in Upland

1. Garage conversions save 40-60% vs new construction since the shell already exists. Average cost in Upland: $75,000-$150,000.

2. Prefab/modular ADUs offer predictable pricing and faster timelines. Average: $120,000-$250,000.

3. Pre-approved plans — available in Upland, which can save $3,000-$10,000 in design costs and 2-3 months in review time. See which cities offer pre-approved ADU plans.

4. State grants — California's CalHFA ADU grant (up to $40K) is currently paused; check calhfa.ca.gov/adu for status and your state for active programs.

5. Get multiple bids — ADU contractor pricing varies 20-40% for the same project. We recommend getting at least 3 quotes.

Get Free ADU Quotes in Upland

Tell us about your project and we'll pass it to ADU builders serving Upland. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.