Builder Guide

ADU Builders in Bend, OR (2026)

What ADU builders cost in Bend, how to choose one, the questions to ask — plus free, no-obligation quotes from independent local contractors (verify license and insurance before hiring).

Build cost: $225,000-$350,000 Permit timeline: The City's published estimate is 4-8 weeks of building-permit review, depending on application completeness and how fast you answer plan-review comments (City ADU Resource Hub). Free quotes

An ADU builder in Bend is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through Bend's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in Oregon.

What ADU Builders Cost in Bend [11][12]

Based on our Bend cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.

New Detached ADU (all-in)$225,000-$350,000
Cost per Sq Ft$280-$440
Garage Conversion$60,000-$150,000
Prefab / Modular ADU (installed)$180,000-$280,000
City Permit & Plan ReviewRoughly $3,000-$4,000 for a 600-800 sq ft ADU at FY2025-26 rates: building permit $1,212.58 for the first $100,000 of valuation + $7.00 per extra $1,000, plan review 65%, 12% state surcharge, 0.33% affordable-housing fee, plus trade permits. The City emails project estimates.
Impact FeesCity SDC schedule FY2025-26 (effective July 1, 2025): an ADU pays a $1,086 transportation SDC; the City's water and sewer SDCs are listed 'not applicable' for the ADU category (versus $11,890 for a new house under 600 sq ft). Rates are indexed every July 1. The Bend Park & Recreation District charges its own parks SDC on top; an SDC deferral program is available (development@bendoregon.gov).

For a full line-item breakdown, see our Bend ADU cost guide. To confirm what you're allowed to build before you hire, review the Bend ADU rules (max detached size: 800 sq ft floor area for a single ADU; where two ADUs are built, one may be up to 800 sq ft and the other up to 500 sq ft (BDC 3.6.200(B)(3)(a)). Floor area is measured inside the exterior walls, stairs count once, and space under a ceiling lower than 5 ft is excluded (B)(3)(b). An attached garage or storage room does not count if it has no interior access to the ADU or provides the ADU's parking space (B)(3)(d). A unit over 800 sq ft is reviewed as a duplex, not an ADU.; owner-occupancy: Not required. BDC 3.6.200(B) has no owner-occupancy rule and ORS 197A.425 prohibits one (short-term-rental use excepted - see Bend's STR permit rules).).

Get Free ADU Quotes in Bend

Tell us about your project and we'll pass it to ADU builders serving Bend. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

How to Vet an ADU Builder in Bend

  • License: Confirm a current contractor's license in Oregon and that it's in good standing. Ask for the license number and verify it with the state board.
  • ADU-specific experience: Ask how many ADUs they've completed in or near Bend and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
  • Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
  • Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
  • Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits (Roughly $3,000-$4,000 for a 600-800 sq ft ADU at FY2025-26 rates: building permit $1,212.58 for the first $100,000 of valuation + $7.00 per extra $1,000, plan review 65%, 12% state surcharge, 0.33% affordable-housing fee, plus trade permits. The City emails project estimates.), plan check (Included in the 4-8 week building-permit review; the plan-review fee is 65% of the building permit fee. Drawings must label which rooms belong to the ADU and which to the main house.), and impact fees (City SDC schedule FY2025-26 (effective July 1, 2025): an ADU pays a $1,086 transportation SDC; the City's water and sewer SDCs are listed 'not applicable' for the ADU category (versus $11,890 for a new house under 600 sq ft). Rates are indexed every July 1. The Bend Park & Recreation District charges its own parks SDC on top; an SDC deferral program is available (development@bendoregon.gov).) are included.
  • Permit handling: Confirm they manage Bend's permit process ("By right. One building permit application in the City's CityView online permit portal covers both Planning and Building Safety review; no Minimum Development Standards Review or land-use application is needed (City ADU Zoning Quick Reference Guide). Properties on septic must first file a Septic Authorization Form with Private Development Engineering.", typically The City's published estimate is 4-8 weeks of building-permit review, depending on application completeness and how fast you answer plan-review comments (City ADU Resource Hub).) and who is responsible if revisions are required.
  • Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.

Questions to Ask Before You Hire

  • How many ADUs have you built in Bend in the last two years?
  • Is your bid fixed-price, and what would trigger a change order?
  • Are permits, plan check, and utility connection fees included?
  • What's a realistic timeline, including permit review (The City's published estimate is 4-8 weeks of building-permit review, depending on application completeness and how fast you answer plan-review comments (City ADU Resource Hub).) and construction?
  • Who is my point of contact and how are delays communicated?
  • What warranty do you provide on workmanship?
  • Can you share three recent Oregon ADU client references?

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Are you an ADU builder? Get Bend leads

Homeowners on this page submit real ADU project requests in Bend. Each one goes to up to five local builders — that is what the homeowner agrees to — so claiming never takes it from anyone and there is no bidding. In practice far fewer ever make contact, which is why the number is five rather than three. A flat $50 only on the leads you accept: no subscription, no contract, and you deal with the homeowner directly.

Get Bend ADU Leads →

Frequently Asked Questions

How much do ADU builders charge in Bend?

ADU builders in Bend typically quote $225,000-$350,000 for a new detached unit, or about $280-$440 per square foot, including design, permitting, and construction. A garage conversion runs $60,000-$150,000 and a prefab/modular ADU averages $180,000-$280,000. Add city permit and plan-review fees (Roughly $3,000-$4,000 for a 600-800 sq ft ADU at FY2025-26 rates: building permit $1,212.58 for the first $100,000 of valuation + $7.00 per extra $1,000, plan review 65%, 12% state surcharge, 0.33% affordable-housing fee, plus trade permits. The City emails project estimates.) plus impact fees of City SDC schedule FY2025-26 (effective July 1, 2025): an ADU pays a $1,086 transportation SDC; the City's water and sewer SDCs are listed 'not applicable' for the ADU category (versus $11,890 for a new house under 600 sq ft). Rates are indexed every July 1. The Bend Park & Recreation District charges its own parks SDC on top; an SDC deferral program is available (development@bendoregon.gov).. Quotes for the same scope commonly vary 20-40% between builders, so collect at least three bids.

How do I find a good ADU builder in Bend?

Look for a licensed contractor with completed ADU projects in Bend specifically — ADUs involve local zoning, setback rules, and utility connections that general remodelers may not have handled. Verify the license, ask for an ADU-specific portfolio and references, confirm they carry liability and workers' comp insurance, and get a written fixed-price or detailed bid. Submit a request below and we'll forward it to local ADU builders serving Bend for free quotes.

Do ADU builders in Bend handle permits?

Most full-service ADU builders manage the permit process for you. In Bend the approval process is "By right. One building permit application in the City's CityView online permit portal covers both Planning and Building Safety review; no Minimum Development Standards Review or land-use application is needed (City ADU Zoning Quick Reference Guide). Properties on septic must first file a Septic Authorization Form with Private Development Engineering." with a typical review timeline of The City's published estimate is 4-8 weeks of building-permit review, depending on application completeness and how fast you answer plan-review comments (City ADU Resource Hub).. Confirm in writing whether permit fees, plan check (Included in the 4-8 week building-permit review; the plan-review fee is 65% of the building permit fee. Drawings must label which rooms belong to the ADU and which to the main house.), and impact fees are included in the bid or billed separately.

How long does it take to build an ADU in Bend?

Plan for the permit review (The City's published estimate is 4-8 weeks of building-permit review, depending on application completeness and how fast you answer plan-review comments (City ADU Resource Hub). in Bend) plus construction. Most detached ADUs take 4-8 months of construction after permits are issued; garage conversions and prefab units are often faster. Ask each builder for a realistic schedule and what could delay it.

Get Free ADU Builder Quotes in Bend

Compare bids from experienced local Bend ADU builders. Free, no obligation.

Get Free Quotes →

More Oregon ADU Rules

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.