Cost Guide

How Much Does an ADU Cost in Glendale, AZ?

Complete 2026 cost breakdown: construction, permits, financing, and expected rental ROI.

Calculate your Glendale ADU cost →
New Construction
$150,000-$280,000
Garage Conversion
$80,000-$150,000
Prefab ADU
$150,000-$300,000
Cost Per Sq Ft
$175-$350

Construction Cost Breakdown

Building an ADU in Glendale costs between $150,000-$280,000 for new construction, with per-square-foot costs averaging $175-$350. These figures include design, permitting, site preparation, and construction. The most affordable option is a garage conversion at $80,000-$150,000, while prefab/modular ADUs fall in between at $150,000-$300,000.

Cost CategoryEstimated Range
Architectural Plans$3,000 – $15,000
Permits & Fees$2,500-$3,400 in review and permit fees for a 500-1,000 sq ft ADU (May 2019 fee schedule Table 3A at the city's $120.75/sq ft valuation; city's 1,000 sq ft estimate: zoning clearance $144, plan review $1,052.90, permit $1,403.86, right-of-way permit $443.60) — plus the $775.25 impact fee
Impact FeesYes, but small since Sept 8, 2025: the Development Impact Fee Schedule (updated 6/24/2026) charges an ADU, attached or detached, 25% of the single-family rate — fire $212.50, library $88.75, parks $298.50, police $175.50, streets $0 — $775.25 in total. Water and wastewater impact fees apply only if the ADU's demand forces a larger meter, and then only the difference between sizes (3/4-inch to 1-inch: $11,898 − $7,125 = $4,773). The March 2025 handout's $9,630 detached / $8,780 attached impact-fee figures predate this schedule
Site Prep & Foundation$10,000 – $35,000
Framing & Structure$15,000 – $45,000
Plumbing$8,000 – $20,000
Electrical$5,000 – $15,000
HVAC$3,000 – $8,000
Interior Finishes$15,000 – $40,000

What would this actually cost for your lot?

Quotes for the same ADU commonly vary 20–40% between builders. We pass your request to up to 5 local builders serving Glendale, where we have them — free, no obligation.

Get Glendale builder quotes →

Permit Costs & Timeline

Permit fees in Glendale are $2,500-$3,400 in review and permit fees for a 500-1,000 sq ft ADU (May 2019 fee schedule Table 3A at the city's $120.75/sq ft valuation; city's 1,000 sq ft estimate: zoning clearance $144, plan review $1,052.90, permit $1,403.86, right-of-way permit $443.60) — plus the $775.25 impact fee. The review timeline is about 10 working days for the zoning-clearance determination (UDC §35.6.210.B.4), then a 10-business-day target for the first building plan review of room additions and accessory buildings, 15 for custom home plans (city Plan Review Turnaround Times sheet), with plan check: Full residential plan review under the 2024 International Building, Residential and Fire Codes with city amendments, adopted Dec 9, 2025 and effective Jan 9, 2026 (UDC §35.3.204.A.22). State law bars a commercial code or a fire-sprinkler requirement for an ADU (A.R.S. §9-461.18(D)). Budget for the separate city water meter every ADU must have (A.24): a new tap to the main in the street, a right-of-way permit and a licensed contractor. Expedited review halves the target time at 300% of the plan-review fee. Impact fees are Yes, but small since Sept 8, 2025: the Development Impact Fee Schedule (updated 6/24/2026) charges an ADU, attached or detached, 25% of the single-family rate — fire $212.50, library $88.75, parks $298.50, police $175.50, streets $0 — $775.25 in total. Water and wastewater impact fees apply only if the ADU's demand forces a larger meter, and then only the difference between sizes (3/4-inch to 1-inch: $11,898 − $7,125 = $4,773). The March 2025 handout's $9,630 detached / $8,780 attached impact-fee figures predate this schedule. Pre-approved plans: Yes — the Glendale Permit-Ready Plan Program (live 2026, meeting A.R.S. §9-461.20) offers three free ADU plans: a 204 sq ft studio, a 512 sq ft 2-bedroom (36 ft × 16 ft) and a 994 sq ft 2-bedroom with study, each in ranch, contemporary and Spanish elevations, plus three house plans. No modifications allowed. Site plan review costs $61.44 planning + $122.88 building + $35.89 engineering with a 10-business-day target, then permit and impact fees.

Rental Income & ROI

Investment Returns

1-Bedroom Rent$1,200-$1,750/month
2-Bedroom Rent$1,400-$2,050/month
Annual Rental Income (est.)$17,700/year
Payback Period (est.)12.1 years
Short-Term RentalYes, with conditions: to rent either unit for under 30 days the owner must occupy the house or the ADU as their principal residence (UDC §35.3.204.A.25; authority A.R.S.
Overall ROI Estimate5-10% gross rental yield

A typical ADU in Glendale generates approximately $17,700 per year in rental income based on average 1-bedroom rents. At an average construction cost of $215,000, the estimated payback period is 12.1 years — before accounting for the resale value the ADU adds, which an appraiser determines from comparable sales in Glendale and varies by market (often less than build cost).

Ways to Reduce ADU Costs in Glendale

1. Garage conversions save 40-60% vs new construction since the shell already exists. Average cost in Glendale: $80,000-$150,000.

2. Prefab/modular ADUs offer predictable pricing and faster timelines. Average: $150,000-$300,000.

3. Pre-approved plans — available in Glendale, which can save $3,000-$10,000 in design costs and 2-3 months in review time. See which cities offer pre-approved ADU plans.

4. State grants — California's CalHFA ADU grant (up to $40K) is currently paused; check calhfa.ca.gov/adu for status and your state for active programs.

5. Get multiple bids — ADU contractor pricing varies 20-40% for the same project. We recommend getting at least 3 quotes.

Get Free ADU Quotes in Glendale

Tell us about your project and we'll pass it to ADU builders serving Glendale. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.