Cost Guide

How Much Does an ADU Cost in Glendale, CA?

Complete 2026 cost breakdown: construction, permits, financing, and expected rental ROI.

Calculate your Glendale ADU cost →
New Construction
$175,000-$375,000
Garage Conversion
$75,000-$200,000
Prefab ADU
$180,000-$300,000
Cost Per Sq Ft
$275-$475

Construction Cost Breakdown

Building an ADU in Glendale costs between $175,000-$375,000 for new construction, with per-square-foot costs averaging $275-$475. These figures include design, permitting, site preparation, and construction. The most affordable option is a garage conversion at $75,000-$200,000, while prefab/modular ADUs fall in between at $180,000-$300,000.

Cost CategoryEstimated Range
Architectural Plans$3,000 – $15,000
Permits & FeesGlendale publishes no flat ADU permit fee: plan check and building permit fees are valuation-based, so request an estimate from the Building Division, (818) 548-3200. The city's development impact fee is about $5,000 and is waived for ADUs of 750 sq ft or less.
Impact FeesADUs of 750 sq ft or less are exempt from development impact fees (Gov. Code 66311.5); Glendale charges about $5,000 for larger ADUs (city ADU page), which state law limits to a share proportional to the primary dwelling's fee.
Site Prep & Foundation$10,000 – $35,000
Framing & Structure$15,000 – $45,000
Plumbing$8,000 – $20,000
Electrical$5,000 – $15,000
HVAC$3,000 – $8,000
Interior Finishes$15,000 – $40,000

What would this actually cost for your lot?

Quotes for the same ADU commonly vary 20–40% between builders. We pass your request to up to 5 local builders serving Glendale, where we have them — free, no obligation.

Get Glendale builder quotes →

Permit Costs & Timeline

Permit fees in Glendale are Glendale publishes no flat ADU permit fee: plan check and building permit fees are valuation-based, so request an estimate from the Building Division, (818) 548-3200. The city's development impact fee is about $5,000 and is waived for ADUs of 750 sq ft or less.. The review timeline is State law requires a decision within 60 days of a complete application and, since Jan. 1, 2026 (SB 543), the application is deemed approved if the city misses that deadline; Glendale does not publish its own review times., with plan check: Valuation-based plan check by the Building Division; submittal needs a site plan, floor plan, elevations, roof plan, sections and a photo survey of the site (city ADU page). A pre-approved Standard Plan gets expedited review.. Impact fees are ADUs of 750 sq ft or less are exempt from development impact fees (Gov. Code 66311.5); Glendale charges about $5,000 for larger ADUs (city ADU page), which state law limits to a share proportional to the primary dwelling's fee.. Pre-approved plans: Yes - the Standard Accessory Dwelling Unit Plan Program (Pre-Approved ADU Program) lists 1 approved plan (1-story, 740 sq ft, 1 bed/1 bath), designed and sold by a private firm; Standard Plans 2 and 3 are listed as 'coming soon'. Program contact (818) 937-8139..

Rental Income & ROI

Investment Returns

1-Bedroom Rent$2,000-$2,700/month
2-Bedroom Rent$2,800-$3,400/month
Annual Rental Income (est.)$28,200/year
Payback Period (est.)9.8 years
Short-Term RentalNot for stays under 30 days: state law (Gov.
Overall ROI Estimate5-8% annual return

A typical ADU in Glendale generates approximately $28,200 per year in rental income based on average 1-bedroom rents. At an average construction cost of $275,000, the estimated payback period is 9.8 years — before accounting for the resale value the ADU adds, which an appraiser determines from comparable sales in Glendale and varies by market (often less than build cost).

Ways to Reduce ADU Costs in Glendale

1. Garage conversions save 40-60% vs new construction since the shell already exists. Average cost in Glendale: $75,000-$200,000.

2. Prefab/modular ADUs offer predictable pricing and faster timelines. Average: $180,000-$300,000.

3. Pre-approved plans — available in Glendale, which can save $3,000-$10,000 in design costs and 2-3 months in review time. See which cities offer pre-approved ADU plans.

4. State grants — California's CalHFA ADU grant (up to $40K) is currently paused; check calhfa.ca.gov/adu for status and your state for active programs.

5. Get multiple bids — ADU contractor pricing varies 20-40% for the same project. We recommend getting at least 3 quotes.

Get Free ADU Quotes in Glendale

Tell us about your project and we'll pass it to ADU builders serving Glendale. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.