Quick Stats: ADU-Friendly Score: 8/10 • Avg Cost: $165,000-$300,000 • Permit Timeline: Not published. The Type 1 ADU decision is made by the Director without a hearing (40.05.15.1.B; procedure in 50.35), then building plan review follows; confirm current turnaround times with Beaverton Planning and Building before scheduling a contractor. • 1BR Rent: $1,400-$1,650/mo

Can I build an ADU in Beaverton?

Yes, ADUs are allowed in Permitted (P) in all four residential zones, MR, RMA, RMB and RMC (Table 20.05.20.A, row 2.A), on a lot whose principal use is a single-detached dwelling (40.05.10; 60.50.03.2.A). In MR only an existing house (as of June 30, 2022) qualifies, since new single-detached dwellings are prohibited there. ADUs also appear in the commercial (20.10.20), multiple-use (20.22.20) and downtown (70.15.20) use tables; check the row for your zone. in Beaverton, OR. The maximum size for a detached ADU is 800 sq ft of floor area (60.50.03.2.C.1). No percentage-of-house rule. A detached ADU can be a new building or a manufactured home (60.50.03.2.B.3). An ADU added to a house that existed on June 30, 2022 is excluded from the zone's floor-area-ratio cap (60.50.03.2.C.4); an ADU built with a new house counts toward FAR (1.40 RMA, 0.80 RMB, 0.60 RMC for single-detached, Table 20.05.15.H.1). Attached ADUs can be up to 800 sq ft of floor area. Beaverton has an ADU-friendliness score of 8/10. Check our full Beaverton ADU rules page for complete zoning details.

How much does it cost to build an ADU in Beaverton?

ADU construction in Beaverton typically costs $165,000-$300,000. The cost per square foot averages $200-$420. Garage conversions are more affordable at $70,000-$160,000, while prefab ADUs cost $100,000-$240,000. Permit fees add The ADU land-use fee is set in the Citywide Comprehensive Fee Schedule (Exhibit A to the fee resolution) and the building permit is valuation-based (Building Permit Fee Schedule B70-1108); both PDFs were behind a bot check on 9/20/2026, so confirm current figures with Community Development. to your budget. See our detailed Beaverton ADU cost guide.

What are the ADU size limits in Beaverton?

Detached ADUs in Beaverton can be up to 800 sq ft of floor area. Attached ADUs are limited to 800 sq ft of floor area. Junior ADUs (JADUs) have a cap of N/A: Oregon and Beaverton have no junior-ADU category. A conversion inside the house is simply an ADU under 60.50.03; if a second unit fits both the ADU and the duplex definition the owner chooses which to apply for (Ch. 90, Dwelling Types). Maximum height is The zone height limit applies: 40 ft in RMA, 35 ft in RMB and RMC (Table 20.05.15.G.1; RMB/RMC also subject to the 20.30 height limits); MR uses the height-transition standards of 60.05.15.7. To use the 5 ft rear-setback option the ADU must be one story and no more than 15 ft above finished grade (60.50.03.2.E.2). You are allowed up to One ADU per single-detached dwelling on a qualifying lot.

What are the setback requirements for ADUs in Beaverton?

Rear setback: 15 ft in RMA, RMB and RMC (Table 20.05.15.F.3), reduced to 5 ft for a one-story ADU no taller than 15 ft measured from finished grade (60.50.03.2.E.2). No ADU may be placed over any easement (60.50.03.2.E.3). Side setback: Table 20.05.15.F.2 (as amended by ORD 4879, Apr 2026) lists 5 ft from a perimeter lot line and 3 ft from internal lot lines created by a land division; a detached ADU must also keep 6 ft from the house and other buildings on the lot (60.50.03.2.E.1; Table 20.05.15.F.6). Confirm the side yard for your lot with the Planning Division. Front setback: 10 ft minimum front yard in all residential zones (Table 20.05.15.F.1.a); a garage face must be at least 18.5 ft back in RMB and RMC (F.4.b). ADUs are normally placed behind the house, so the rear and side rules govern. Note that garage conversions may be exempt from setback requirements if the existing structure is already within the setback area.

Do I need parking for an ADU in Beaverton?

None. Beaverton removed minimum parking for every use in August 2023 (Development Code 60.30.10, ORD 4844), and ORS 197A.425(1)(b)(B) separately bars cities from requiring extra off-street parking for an ADU. Any spaces you do build must be 8.5 ft by 18.5 ft; up to two may sit in the front yard (60.30.10). Many cities and states have been relaxing ADU parking requirements in recent years. In California, no additional parking is required for ADUs near transit.

Is owner-occupancy required for ADUs in Beaverton?

Not required. Section 60.50.03 contains no owner-occupancy rule and ORS 197A.425(1)(b)(B) (formerly ORS 197.312(5)) prohibits cities from imposing one; the state exception lets cities restrict short-term rental of ADUs, so ask the city before listing the unit for stays under 30 days. Note that owner-occupancy rules vary by state law — California and several other states have eliminated this requirement for standard ADUs.

How long does it take to get an ADU permit in Beaverton?

The ADU permit review timeline in Beaverton is typically Not published. The Type 1 ADU decision is made by the Director without a hearing (40.05.15.1.B; procedure in 50.35), then building plan review follows; confirm current turnaround times with Beaverton Planning and Building before scheduling a contractor. Plan check: Structural, energy, fire-separation and plumbing plan review is part of the building permit (Building Division); the land-use decision under 40.05.15 checks zoning only. Detached ADUs must be 6 ft from other buildings or meet the Residential Specialty Code's fire-separation rules. Pre-approved plans availability: No Beaverton pre-approved ADU plan program was found on the city's site or in the Development Code as of Sept 2026; confirm with the Planning Division before assuming one exists.

How much can I rent my ADU for in Beaverton?

Average ADU rental income in Beaverton: 1-bedroom units rent for $1,400-$1,650/month, 2-bedroom units for $1,600-$1,900/month. Short-term rentals: Not verified. Expected ROI: 5-8% gross rental yield on a $165,000-$300,000 build at $1,400-$1,900/mo (estimate before taxes, vacancy and financing).

What is the minimum lot size for an ADU in Beaverton?

The minimum lot size for an ADU in Beaverton is No ADU-specific minimum lot size (60.50.03 sets none). The minimum lot areas in Table 20.05.15.B (1,500 sq ft RMA, 3,000 RMB, 5,000 RMC for a single-detached lot) apply to land divisions and middle housing, not to adding an ADU to an existing lot (footnote 2). The application must be filed by the owner or the owner's agent (40.05.15.1.D). This applies to detached ADUs — garage conversions and JADUs may have different or no lot size requirements.

Can I convert my garage into an ADU in Beaverton?

Garage conversions are one of the most popular and affordable ADU options. In Beaverton, a garage conversion typically costs $70,000-$160,000. The key advantages are lower cost (no foundation work), potential setback exemptions, and faster permitting. Read our complete garage conversion guide.

Get Free ADU Quotes in Beaverton

Tell us about your project and we'll pass it to ADU builders serving Beaverton. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.

Stay Updated on ADU Law Changes

Get notified when ADU regulations change in your city. Free — no spam, unsubscribe anytime.