Complete 2026 cost breakdown: construction, permits, financing, and expected rental ROI.
Calculate your Beaverton ADU cost →Building an ADU in Beaverton costs between $165,000-$300,000 for new construction, with per-square-foot costs averaging $200-$420. These figures include design, permitting, site preparation, and construction. The most affordable option is a garage conversion at $70,000-$160,000, while prefab/modular ADUs fall in between at $100,000-$240,000.
| Cost Category | Estimated Range |
|---|---|
| Architectural Plans | $3,000 – $15,000 |
| Permits & Fees | The Type 1 ADU land-use application has been free: the most recent Citywide Comprehensive Fee Schedule we could read (FY 2024-25) lists it as 'No Charge', a subsidized fee that does not rise with inflation, so confirm the current-year figure with Planning. The building permit is valuation-based (Building Permit Fee Schedule B70-1108, effective Feb. 1, 2026-Jan. 31, 2027): $1,303.27 for the first $100,000 of valuation plus $6.00 per additional $1,000 up to $500,000, plus plan review at 70% of that fee, a 5% technology fee and a 12% state surcharge. On a $200,000 valuation that is about $3,560 before mechanical, plumbing and electrical permits. |
| Impact Fees | The city's SDC handout (B70-1116, July 2026) charges a new ADU $8,037 Washington County Transportation Development Tax (July 2026-June 2027) and $5,914 Tualatin Hills Park & Recreation District SDC (listed for Sept. 2025-Aug. 2026; ask whether THPRD has updated it), plus a school construction excise tax of $1.70 per sq ft of new building area and the Metro construction excise tax of 0.12% of valuation over $100,000. Lots in Cooper Mountain or South Cooper Mountain add a supplemental transportation SDC of $8,400 or $7,656. An ADU that shares the house's single 3/4-inch or smaller water meter adds no sanitary connection fee and no stormwater unit; a separate meter adds a $10,835-$16,250 water SDC plus $528 to install. Typical total for an 800 sq ft ADU on a shared meter: about $15,500. |
| Site Prep & Foundation | $10,000 – $35,000 |
| Framing & Structure | $15,000 – $45,000 |
| Plumbing | $8,000 – $20,000 |
| Electrical | $5,000 – $15,000 |
| HVAC | $3,000 – $8,000 |
| Interior Finishes | $15,000 – $40,000 |
Quotes for the same ADU commonly vary 20–40% between builders. We pass your request to up to 5 local builders serving Beaverton, where we have them — free, no obligation.
Get Beaverton builder quotes →Permit fees in Beaverton are The Type 1 ADU land-use application has been free: the most recent Citywide Comprehensive Fee Schedule we could read (FY 2024-25) lists it as 'No Charge', a subsidized fee that does not rise with inflation, so confirm the current-year figure with Planning. The building permit is valuation-based (Building Permit Fee Schedule B70-1108, effective Feb. 1, 2026-Jan. 31, 2027): $1,303.27 for the first $100,000 of valuation plus $6.00 per additional $1,000 up to $500,000, plus plan review at 70% of that fee, a 5% technology fee and a 12% state surcharge. On a $200,000 valuation that is about $3,560 before mechanical, plumbing and electrical permits.. The review timeline is Not published. The Type 1 ADU decision is made by the Director without a hearing (40.05.15.1.B; procedure in 50.35), then building plan review follows; confirm current turnaround times with Beaverton Planning and Building before scheduling a contractor., with plan check: Structural, energy, fire-separation and plumbing plan review is part of the building permit (Building Division); the land-use decision under 40.05.15 checks zoning only. Detached ADUs must be 6 ft from other buildings or meet the Residential Specialty Code's fire-separation rules.. Impact fees are The city's SDC handout (B70-1116, July 2026) charges a new ADU $8,037 Washington County Transportation Development Tax (July 2026-June 2027) and $5,914 Tualatin Hills Park & Recreation District SDC (listed for Sept. 2025-Aug. 2026; ask whether THPRD has updated it), plus a school construction excise tax of $1.70 per sq ft of new building area and the Metro construction excise tax of 0.12% of valuation over $100,000. Lots in Cooper Mountain or South Cooper Mountain add a supplemental transportation SDC of $8,400 or $7,656. An ADU that shares the house's single 3/4-inch or smaller water meter adds no sanitary connection fee and no stormwater unit; a separate meter adds a $10,835-$16,250 water SDC plus $528 to install. Typical total for an 800 sq ft ADU on a shared meter: about $15,500.. Pre-approved plans: No Beaverton pre-approved ADU plan program was found on the city's site or in the Development Code as of Sept 2026; confirm with the Planning Division before assuming one exists..
| 1-Bedroom Rent | $1,400-$1,650/month |
| 2-Bedroom Rent | $1,600-$1,900/month |
| Annual Rental Income (est.) | $18,300/year |
| Payback Period (est.) | 12.7 years |
| Short-Term Rental | Not verified. Oregon law lets cities restrict short-term rental of ADUs while banning owner-occupancy rules (ORS 197A.425), and no ADU-specific STR rule appears in Development Code 60.50.03; check Beaverton's business-license and any transient-lodging requirements with the city before listing stays under 30 days. |
| Overall ROI Estimate | 5-8% gross rental yield on a $165,000-$300,000 build at $1,400-$1,900/mo (estimate before taxes, vacancy and financing) |
A typical ADU in Beaverton generates approximately $18,300 per year in rental income based on average 1-bedroom rents. At an average construction cost of $232,500, the estimated payback period is 12.7 years — before accounting for the resale value the ADU adds, which an appraiser determines from comparable sales in Beaverton and varies by market (often less than build cost).
1. Garage conversions save 40-60% vs new construction since the shell already exists. Average cost in Beaverton: $70,000-$160,000.
2. Prefab/modular ADUs offer predictable pricing and faster timelines. Average: $100,000-$240,000.
3. Pre-approved plans — Beaverton does not offer a pre-approved/standard ADU plan program yet, so budget for custom architectural plans (typically $3,000-$15,000). See which cities offer pre-approved ADU plans.
4. State grants — California's CalHFA ADU grant (up to $40K) is currently paused; check calhfa.ca.gov/adu for status and your state for active programs.
5. Get multiple bids — ADU contractor pricing varies 20-40% for the same project. We recommend getting at least 3 quotes.
Tell us about your project and we'll pass it to ADU builders serving Beaverton.Get free quotes from local ADU builders serving Beaverton. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.
We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.
🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.
Just browsing? Search ADU builders near you by ZIP code.