An ADU builder in Beaverton is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through Beaverton's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in Oregon.
What ADU Builders Cost in Beaverton [12][13]
Based on our Beaverton cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.
| New Detached ADU (all-in) | $165,000-$300,000 |
| Cost per Sq Ft | $200-$420 |
| Garage Conversion | $70,000-$160,000 |
| Prefab / Modular ADU (installed) | $100,000-$240,000 |
| City Permit & Plan Review | The Type 1 ADU land-use application has been free: the most recent Citywide Comprehensive Fee Schedule we could read (FY 2024-25) lists it as 'No Charge', a subsidized fee that does not rise with inflation, so confirm the current-year figure with Planning. The building permit is valuation-based (Building Permit Fee Schedule B70-1108, effective Feb. 1, 2026-Jan. 31, 2027): $1,303.27 for the first $100,000 of valuation plus $6.00 per additional $1,000 up to $500,000, plus plan review at 70% of that fee, a 5% technology fee and a 12% state surcharge. On a $200,000 valuation that is about $3,560 before mechanical, plumbing and electrical permits. |
| Impact Fees | The city's SDC handout (B70-1116, July 2026) charges a new ADU $8,037 Washington County Transportation Development Tax (July 2026-June 2027) and $5,914 Tualatin Hills Park & Recreation District SDC (listed for Sept. 2025-Aug. 2026; ask whether THPRD has updated it), plus a school construction excise tax of $1.70 per sq ft of new building area and the Metro construction excise tax of 0.12% of valuation over $100,000. Lots in Cooper Mountain or South Cooper Mountain add a supplemental transportation SDC of $8,400 or $7,656. An ADU that shares the house's single 3/4-inch or smaller water meter adds no sanitary connection fee and no stormwater unit; a separate meter adds a $10,835-$16,250 water SDC plus $528 to install. Typical total for an 800 sq ft ADU on a shared meter: about $15,500. |
For a full line-item breakdown, see our Beaverton ADU cost guide. To confirm what you're allowed to build before you hire, review the Beaverton ADU rules (max detached size: 800 sq ft of floor area (60.50.03.2.C.1). No percentage-of-house rule. A detached ADU can be a new building or a manufactured home (60.50.03.2.B.3). An ADU added to a house that existed on June 30, 2022 is excluded from the zone's floor-area-ratio cap (60.50.03.2.C.4); an ADU built with a new house counts toward FAR (1.40 RMA, 0.80 RMB, 0.60 RMC for single-detached, Table 20.05.15.H.1).; owner-occupancy: Not required. Section 60.50.03 contains no owner-occupancy rule and ORS 197A.425(1)(b)(B) (formerly ORS 197.312(5)) prohibits cities from imposing one; the state exception lets cities restrict short-term rental of ADUs, so ask the city before listing the unit for stays under 30 days.).
Get Free ADU Quotes in Beaverton
Tell us about your project and we'll pass it to ADU builders serving Beaverton.Get free quotes from local ADU builders serving Beaverton. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.
Takes about a minute.
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
Compare quotes, verify license & insurance, hire (or don't). No spam either way.
We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.
🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.
Just browsing? Search ADU builders near you by ZIP code.
How to Vet an ADU Builder in Beaverton
- License: Confirm a current contractor's license in Oregon and that it's in good standing. Ask for the license number and verify it with the state board.
- ADU-specific experience: Ask how many ADUs they've completed in or near Beaverton and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
- Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
- Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
- Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits (The Type 1 ADU land-use application has been free: the most recent Citywide Comprehensive Fee Schedule we could read (FY 2024-25) lists it as 'No Charge', a subsidized fee that does not rise with inflation, so confirm the current-year figure with Planning. The building permit is valuation-based (Building Permit Fee Schedule B70-1108, effective Feb. 1, 2026-Jan. 31, 2027): $1,303.27 for the first $100,000 of valuation plus $6.00 per additional $1,000 up to $500,000, plus plan review at 70% of that fee, a 5% technology fee and a 12% state surcharge. On a $200,000 valuation that is about $3,560 before mechanical, plumbing and electrical permits.), plan check (Structural, energy, fire-separation and plumbing plan review is part of the building permit (Building Division); the land-use decision under 40.05.15 checks zoning only. Detached ADUs must be 6 ft from other buildings or meet the Residential Specialty Code's fire-separation rules.), and impact fees (The city's SDC handout (B70-1116, July 2026) charges a new ADU $8,037 Washington County Transportation Development Tax (July 2026-June 2027) and $5,914 Tualatin Hills Park & Recreation District SDC (listed for Sept. 2025-Aug. 2026; ask whether THPRD has updated it), plus a school construction excise tax of $1.70 per sq ft of new building area and the Metro construction excise tax of 0.12% of valuation over $100,000. Lots in Cooper Mountain or South Cooper Mountain add a supplemental transportation SDC of $8,400 or $7,656. An ADU that shares the house's single 3/4-inch or smaller water meter adds no sanitary connection fee and no stormwater unit; a separate meter adds a $10,835-$16,250 water SDC plus $528 to install. Typical total for an 800 sq ft ADU on a shared meter: about $15,500.) are included.
- Permit handling: Confirm they manage Beaverton's permit process ("Two steps: (1) a Type 1 Accessory Dwelling Unit land-use application to the Community Development Director under Development Code 40.05.15 (no hearing, no neighbor notice; criteria are consistency with Chapters 20 and 60 and a complete submittal per 50.25), filed by the owner or agent through the Beaverton Electronic Permitting System (BEPS); then (2) a building permit with plumbing, electrical and mechanical permits, built to the Oregon Residential Specialty Code (60.50.03.2.E.4). A pre-application conference can be used to fix the submittal list (40.05.15.1.D).", typically Not published. The Type 1 ADU decision is made by the Director without a hearing (40.05.15.1.B; procedure in 50.35), then building plan review follows; confirm current turnaround times with Beaverton Planning and Building before scheduling a contractor.) and who is responsible if revisions are required.
- Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.
Questions to Ask Before You Hire
- How many ADUs have you built in Beaverton in the last two years?
- Is your bid fixed-price, and what would trigger a change order?
- Are permits, plan check, and utility connection fees included?
- What's a realistic timeline, including permit review (Not published. The Type 1 ADU decision is made by the Director without a hearing (40.05.15.1.B; procedure in 50.35), then building plan review follows; confirm current turnaround times with Beaverton Planning and Building before scheduling a contractor.) and construction?
- Who is my point of contact and how are delays communicated?
- What warranty do you provide on workmanship?
- Can you share three recent Oregon ADU client references?
Finance Your ADU Project
Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.
Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more
Are you an ADU builder? Get Beaverton leads
Homeowners on this page submit real ADU project requests in Beaverton. Each one goes to up to five local builders — that is what the homeowner agrees to — so claiming never takes it from anyone and there is no bidding. In practice far fewer ever make contact, which is why the number is five rather than three. A flat $50 only on the leads you accept: no subscription, no contract, and you deal with the homeowner directly.
Get Beaverton ADU Leads →Frequently Asked Questions
How much do ADU builders charge in Beaverton?
How do I find a good ADU builder in Beaverton?
Do ADU builders in Beaverton handle permits?
How long does it take to build an ADU in Beaverton?
Get Free ADU Builder Quotes in Beaverton
Compare bids from experienced local Beaverton ADU builders. Free, no obligation.
Get Free Quotes →