ADU Builders in Beaverton, OR (2026)

What ADU builders cost in Beaverton, how to choose one, the questions to ask — plus free, no-obligation quotes from independent local contractors (verify license and insurance before hiring).

Build cost: $165,000-$300,000 Permit timeline: Not published. The Type 1 ADU decision is made by the Director without a hearing (40.05.15.1.B; procedure in 50.35), then building plan review follows; confirm current turnaround times with Beaverton Planning and Building before scheduling a contractor. Free quotes

An ADU builder in Beaverton is a licensed contractor who designs and constructs accessory dwelling units — detached backyard units, garage conversions, attached additions, and junior ADUs (JADUs). Because an ADU is a complete second dwelling, the builder coordinates foundation, framing, plumbing, electrical, and HVAC work and pulls it through Beaverton's permit process and utility connections. Not every general contractor has built one, so the right builder is one with ADU-specific experience in Oregon.

What ADU Builders Cost in Beaverton [12][13]

Based on our Beaverton cost data, expect the following ranges from local ADU builders. Quotes for the same scope typically vary 20-40% between contractors, so getting at least three bids is the single best way to control cost.

New Detached ADU (all-in)$165,000-$300,000
Cost per Sq Ft$200-$420
Garage Conversion$70,000-$160,000
Prefab / Modular ADU (installed)$100,000-$240,000
City Permit & Plan ReviewThe ADU land-use fee is set in the Citywide Comprehensive Fee Schedule (Exhibit A to the fee resolution) and the building permit is valuation-based (Building Permit Fee Schedule B70-1108); both PDFs were behind a bot check on 9/20/2026, so confirm current figures with Community Development.
Impact FeesSystem Development Charges from the city (transportation, water), Tualatin Hills Park & Recreation District, Clean Water Services (sanitary/stormwater) and Washington County (Transportation Development Tax) apply to a new dwelling unit; ADU treatment and any reductions are in the city's SDC handout B70-1116, unreachable on 9/20/2026. Ask the Site Development Division for a written SDC estimate before design.

For a full line-item breakdown, see our Beaverton ADU cost guide. To confirm what you're allowed to build before you hire, review the Beaverton ADU rules (max detached size: 800 sq ft of floor area (60.50.03.2.C.1). No percentage-of-house rule. A detached ADU can be a new building or a manufactured home (60.50.03.2.B.3). An ADU added to a house that existed on June 30, 2022 is excluded from the zone's floor-area-ratio cap (60.50.03.2.C.4); an ADU built with a new house counts toward FAR (1.40 RMA, 0.80 RMB, 0.60 RMC for single-detached, Table 20.05.15.H.1).; owner-occupancy: Not required. Section 60.50.03 contains no owner-occupancy rule and ORS 197A.425(1)(b)(B) (formerly ORS 197.312(5)) prohibits cities from imposing one; the state exception lets cities restrict short-term rental of ADUs, so ask the city before listing the unit for stays under 30 days.).

Get Free ADU Quotes in Beaverton

Tell us about your project and we'll pass it to ADU builders serving Beaverton. Free, no obligation — you choose who to work with. We don't have builders in every area yet; if nobody covers yours, we'll email you to say so.

1. Tell us your project
Takes about a minute.
2. We match local pros
Up to 5 independent local ADU builders — never more, and we tell them nothing you don't submit here.
3. You choose
Compare quotes, verify license & insurance, hire (or don't). No spam either way.

+ Add project details (optional — helps builders quote faster)
+ Add budget (optional — helps builders scope the right design)

🔒 Your info is secure. We share it only with contractors quoting your project. No spam, no obligation.

Just browsing? Search ADU builders near you by ZIP code.

How to Vet an ADU Builder in Beaverton

  • License: Confirm a current contractor's license in Oregon and that it's in good standing. Ask for the license number and verify it with the state board.
  • ADU-specific experience: Ask how many ADUs they've completed in or near Beaverton and request addresses or photos. ADU permitting and setbacks differ from a kitchen remodel.
  • Portfolio & references: Get references from recent ADU clients and, if possible, visit a finished unit.
  • Insurance: Verify general liability and workers' compensation coverage. Ask for a certificate of insurance.
  • Written, detailed bid: Insist on an itemized, fixed-price or clearly-scoped bid — not a verbal estimate. It should state whether permits (The ADU land-use fee is set in the Citywide Comprehensive Fee Schedule (Exhibit A to the fee resolution) and the building permit is valuation-based (Building Permit Fee Schedule B70-1108); both PDFs were behind a bot check on 9/20/2026, so confirm current figures with Community Development.), plan check (Structural, energy, fire-separation and plumbing plan review is part of the building permit (Building Division); the land-use decision under 40.05.15 checks zoning only. Detached ADUs must be 6 ft from other buildings or meet the Residential Specialty Code's fire-separation rules.), and impact fees (System Development Charges from the city (transportation, water), Tualatin Hills Park & Recreation District, Clean Water Services (sanitary/stormwater) and Washington County (Transportation Development Tax) apply to a new dwelling unit; ADU treatment and any reductions are in the city's SDC handout B70-1116, unreachable on 9/20/2026. Ask the Site Development Division for a written SDC estimate before design.) are included.
  • Permit handling: Confirm they manage Beaverton's permit process ("Two steps: (1) a Type 1 Accessory Dwelling Unit land-use application to the Community Development Director under Development Code 40.05.15 (no hearing, no neighbor notice; criteria are consistency with Chapters 20 and 60 and a complete submittal per 50.25), filed by the owner or agent through the Beaverton Electronic Permitting System (BEPS); then (2) a building permit with plumbing, electrical and mechanical permits, built to the Oregon Residential Specialty Code (60.50.03.2.E.4). A pre-application conference can be used to fix the submittal list (40.05.15.1.D).", typically Not published. The Type 1 ADU decision is made by the Director without a hearing (40.05.15.1.B; procedure in 50.35), then building plan review follows; confirm current turnaround times with Beaverton Planning and Building before scheduling a contractor.) and who is responsible if revisions are required.
  • Payment schedule: Avoid large upfront payments. A reasonable schedule ties payments to completed milestones.

Questions to Ask Before You Hire

  • How many ADUs have you built in Beaverton in the last two years?
  • Is your bid fixed-price, and what would trigger a change order?
  • Are permits, plan check, and utility connection fees included?
  • What's a realistic timeline, including permit review (Not published. The Type 1 ADU decision is made by the Director without a hearing (40.05.15.1.B; procedure in 50.35), then building plan review follows; confirm current turnaround times with Beaverton Planning and Building before scheduling a contractor.) and construction?
  • Who is my point of contact and how are delays communicated?
  • What warranty do you provide on workmanship?
  • Can you share three recent Oregon ADU client references?

Finance Your ADU Project

Most ADU projects are funded through HELOCs, construction loans, or cash-out refinancing. Compare rates from top lenders.

Some links on this page are affiliate links. We may earn a commission at no extra cost to you. Learn more

Are you an ADU builder? Get Beaverton leads

Homeowners on this page submit real ADU project requests in Beaverton. Each one goes to up to five local builders — that is what the homeowner agrees to — so claiming never takes it from anyone and there is no bidding. In practice far fewer ever make contact, which is why the number is five rather than three. A flat $50 only on the leads you accept: no subscription, no contract, and you deal with the homeowner directly.

Get Beaverton ADU Leads →

Frequently Asked Questions

How much do ADU builders charge in Beaverton?

ADU builders in Beaverton typically quote $165,000-$300,000 for a new detached unit, or about $200-$420 per square foot, including design, permitting, and construction. A garage conversion runs $70,000-$160,000 and a prefab/modular ADU averages $100,000-$240,000. Add city permit and plan-review fees (The ADU land-use fee is set in the Citywide Comprehensive Fee Schedule (Exhibit A to the fee resolution) and the building permit is valuation-based (Building Permit Fee Schedule B70-1108); both PDFs were behind a bot check on 9/20/2026, so confirm current figures with Community Development.) plus impact fees of System Development Charges from the city (transportation, water), Tualatin Hills Park & Recreation District, Clean Water Services (sanitary/stormwater) and Washington County (Transportation Development Tax) apply to a new dwelling unit; ADU treatment and any reductions are in the city's SDC handout B70-1116, unreachable on 9/20/2026. Ask the Site Development Division for a written SDC estimate before design.. Quotes for the same scope commonly vary 20-40% between builders, so collect at least three bids.

How do I find a good ADU builder in Beaverton?

Look for a licensed contractor with completed ADU projects in Beaverton specifically — ADUs involve local zoning, setback rules, and utility connections that general remodelers may not have handled. Verify the license, ask for an ADU-specific portfolio and references, confirm they carry liability and workers' comp insurance, and get a written fixed-price or detailed bid. Submit a request below and we'll forward it to local ADU builders serving Beaverton for free quotes.

Do ADU builders in Beaverton handle permits?

Most full-service ADU builders manage the permit process for you. In Beaverton the approval process is "Two steps: (1) a Type 1 Accessory Dwelling Unit land-use application to the Community Development Director under Development Code 40.05.15 (no hearing, no neighbor notice; criteria are consistency with Chapters 20 and 60 and a complete submittal per 50.25), filed by the owner or agent through the Beaverton Electronic Permitting System (BEPS); then (2) a building permit with plumbing, electrical and mechanical permits, built to the Oregon Residential Specialty Code (60.50.03.2.E.4). A pre-application conference can be used to fix the submittal list (40.05.15.1.D).". Review time: not published. The Type 1 ADU decision is made by the Director without a hearing (40.05.15.1.B; procedure in 50.35), then building plan review follows; confirm current turnaround times with Beaverton Planning and Building before scheduling a contractor. Confirm in writing whether permit fees, plan check (Structural, energy, fire-separation and plumbing plan review is part of the building permit (Building Division); the land-use decision under 40.05.15 checks zoning only. Detached ADUs must be 6 ft from other buildings or meet the Residential Specialty Code's fire-separation rules.), and impact fees are included in the bid or billed separately.

How long does it take to build an ADU in Beaverton?

Plan for the permit review (Not published. The Type 1 ADU decision is made by the Director without a hearing (40.05.15.1.B; procedure in 50.35), then building plan review follows; confirm current turnaround times with Beaverton Planning and Building before scheduling a contractor. in Beaverton) plus construction. Most detached ADUs take 4-8 months of construction after permits are issued; garage conversions and prefab units are often faster. Ask each builder for a realistic schedule and what could delay it.

Get Free ADU Builder Quotes in Beaverton

Compare bids from experienced local Beaverton ADU builders. Free, no obligation.

Get Free Quotes →

More Oregon ADU Rules

About this information: This page is an informational summary of publicly available regulations - it is not legal, financial, or professional advice, and it is not a substitute for confirming requirements with your local planning department. Rules change frequently; always verify current requirements before designing, budgeting, or building. Last verified: 2026-09-20. Contractors we introduce are independent businesses - verify license and insurance directly before hiring. Spotted an error? Tell us - we verify against primary sources and correct quickly.